ISO 国际标准化组织(ISO,International Organization for Stan-dardization缩写)。
OEM是英文Original Equipment Manufacturer的缩写,意思是原设备制造商 R&D (research&design) 研发 ODM,即Original design manufacture(原始设计商)的缩写。 ----------------------------------------------
P/N Part Number 料号
L/N Lot Number 批号 ----------------------------------------------
IQC incoming quality control RD research development center IPQC in process quality control RD HQ research development center head quarter FQC final quality control QA quality assurance BOM bill of material PVT product verification test OQC outgoing quality control PRP phase review process QE quality engineering PM project management DCC document center control PJE project engineer ECN engineering change notice PE product engineer ECR engineering change request NPI new product introduction MRB material review bom MP mass production CAR corrective action request MFG manufacturing FPC flexible printed circuit board ME mechanical engineer NCR non conforming report KBD keyboard OBE out of box evaluation IFR instant failure rate IQA internal quality audit IFIR instant failure incident rate PCR process change request HW hardware IPO internal purchase office N/A No Action IE industrial engineering ESD electrostatic discharge QPA quality process audit EOL end of life QSA quality system audit EN engineering notice ATE automatic test equipment EMI electromagnetic interference AOI automatic optical inspection EMC electromagnetic compatibility PCBA print circuit board assembly EE electronic engineer(ing) TTL technology transfer list EDC electronic data center SQA supplier quality assurance ECO engineering change order ORT ongoing reliability testing DVT design verification test QM quality manual DOA dead on arrival SW software CAD/ID computer aided design /industrial design SOW standard of work BIOS basic input /output system SCSI small computer system interface AP application program SA software application AFR annual failure rate SO sales order NTF no trouble found MRP material requirement planning CND can not duplicate AVL approved vendor list DPPM defect parts per million FAI first article inspection FMEA failure mode effect analysis CLCA closed loop corrective action LRR line reject rate measured by DPPM MQR monthly quality review MTQ manufacturing ,test and quality RCA root cause analysis PFMEA process failure mode effect analysis SFIS Shop Floor Information System QEM Quality engineering measurement BGA Ball Grid Array IC Integrated Circuit QFP Quad Flat Pack EOS Elwctrical Over Stress TNB terminal notebook business SMT Surface Mount Technology 品质人员名称类 QC quality control 品质管理人员 FQC final quality control 终点品质管制人员 IPQC in process quality control 制程中的品质管制人员 OQC output quality control 最终出货品质管制人员 IQC incoming quality control 进料品质管制人员 TQC total quality control 全面质量管理 POC passage quality control 段检人员 QA quality assurance 质量保证人员 OQA output quality assurance 出货质量保证人员 QE quality engineering 品质工程人员 品质保证类 FAI first article inspection 新品首件检查 FAA first article assurance 首件确认 CP capability index 能力指数 CPK capability process index 模具制程能力参数 SSQA standardized supplier quality audit 合格供应商品质评估 FMEA failure model effectiveness analysis 失效模式分析 FQC运作类 AQL Acceptable Quality Level 运作类允收品质水准 S/S Sample size 抽样检验样本大小 ACC Accept 允收 REE Reject 拒收 CR Critical 极严重的 MAJ Major 主要的 MIN Minor 轻微的 Q/R/S Quality/Reliability/Service 品质/可靠度/服务 AOD Accept On Deviation 特采 UAI Use As It 特采 FPIR First Piece Inspection Report 首件检查报告 PPM Percent Per Million 百万分之一 制程统计品管专类 SPC Statistical Process Control 统计制程管制 SQC Statistical Quality Control 统计品质管制 GRR Gauge Reproductiveness & Repeatability 量具之再制性及重测性判断量可靠与否 DIM Dimension 尺寸 DIA Diameter 直径 N Number 样品数 其它品质术语类 QIT Quality Improvement Team 品质改善小组 ZD Zero Defect 零缺点 QI Quality Improvement 品质改善 QP Quality Policy 目标方针 TQM Total Quality Management 全面品质管理 RMA Return Material Audit 退料认可 7QCTools 7 Quality Control Tools 品管七大手法 通用之件类 ECN Engineering Change Notice 工程变更通知(供应商) ECO Engineering Change Order 工程改动要求(客户) PCN Process Change Notice 工序改动通知 PMP Product Management Plan 生产管制计划 SIP Standard Inspection Procedure 制程检验标准程序 SOP Standard Operation Procedure 制造作业规范 IS Inspection Specification 成品检验规范 BOM Bill Of Material 物料清单 PS Package Specification 包装规范 SPEC Specification 规格 DWG Drawing 图面 系统文件类 ES Engineering Standard 工程标准 CGOO China General PCE龙华厂文件 IWS International Workman Standard 工艺标准 ISO International Standard Organization 国际标准化组织 GS General Specification 一般规格 部类 PMC Production & Material Control 生产和物料控制 PCC Product control center 生产管制中心 PPC Production Plan Control 生产计划控制 MC Material Control 物料控制 DC Document Center 资料中心 QE Quality Engineering 品质工程(部) QA Quality Assurance 品质保证(处) QC Quality Control 品质管制(课) PD Product Department 生产部 LAB Laboratory 实验室 IE Industrial Engineering 工业工程 R&D Research & Design 设计开发部 生产类 PCs Pieces 个(根,块等) PRS Pairs 双(对等) CTN Carton 卡通箱 PAL Pallet/skid 栈板 PO Purchasing Order 采购订单 MO Manufacture Order 生产单 D/C Date Code 生产日期码 ID/C Identification Code (供应商)识别码 SWR Special Work Request 特殊工作需求 L/N Lot Number 批号 P/N Part Number 料号 OEM Original Equipment Manufacture 原设备制造 PC Personal Computer 个人电脑 CPU Central Processing Unit 中央处理器 A.S.A.P As Soon As Possible 尽可能快的 E-MAIL Electrical-Mail 电子邮件 N/A Not Applicable 不适用 QTY Quantity 数量 I/O input/output 输入/输出 NG Not Good 不行,不合格 C=0 Critical=0 极严重不允许 APP Approve 核准,认可,承认 CHK Check 确认 ASS'Y Assembly 装配,组装 T/P True Position 真位度 5WIH When, Where, Who, What, Why, How to 6M Man, Machine, Material, Method, Measurement, Message 4MTH Man, Material, Money, Method, Time, How 人力,物力,财务,技术,时间(资源) SQA Strategy Quality Assurance 策略品质保证 DQA Design Quality Assurance 设计品质保证 MQA Manufacture Quality Assurance 制造品质保证 SSQA Sales and service Quality Assurance 销售及服务品质保证 LRR Lot Reject Rate 批退率 SPS Switching power supply 电源箱 DT Desk Top 卧式(机箱) MT Mini-Tower 立式(机箱) DVD Digital Video Disk VCD Video Compact Disk LCD Liquid Crystal Display CAD Computer Aided Design CAM Computer Aided Manufacturing CAE Computer Aided Engineering PCB Printed Circuit Board 印刷电路板 CAR Correction Action Report 改善报告 NG Not Good 不良 WDR Weekly Delivery Requirement 周出货要求 PPM Percent Per Million 百万分之一 TPM Total Production Maintenance 全面生产保养 MRP Material Requirement Planning 物料需计划 OS Operation System 作业系统 TBA To Be Assured 待定,定缺转载请注明出自六西格玛品质论坛 http://www./cdb/,本贴地址:http://www./cdb/viewthread.php?tid=165383 |
|