分享

电子厂 专业 术语

 mac_tom 2009-08-26
ISO 国际标准化组织(ISO,International Organization for Stan-dardization缩写)。
OEM是英文Original Equipment Manufacturer的缩写,意思是原设备制造商
R&D (research&design) 研发
ODM,即Original design manufacture(原始设计商)的缩写。
----------------------------------------------
P/N        Part Number        料号
L/N        Lot Number         批号
----------------------------------------------
IQC          incoming quality control         
RD          research development center
IPQC         in process quality control        
RD HQ         research development center head quarter
FQC         final quality control        
QA          quality assurance
BOM         bill of material        
PVT          product verification test
OQC         outgoing quality control        
PRP         phase review process
QE         quality engineering         
PM          project management
DCC         document  center control        
PJE         project engineer
ECN         engineering change notice        
PE         product engineer
ECR         engineering change request        
NPI         new product introduction
MRB         material review bom        
MP         mass production
CAR         corrective action request        
MFG         manufacturing
FPC         flexible printed circuit board        
ME         mechanical engineer
NCR          non conforming report        
KBD         keyboard
OBE          out of box evaluation        
IFR         instant failure rate
IQA         internal  quality audit        
IFIR          instant failure incident rate
PCR         process change request
HW         hardware
IPO         internal purchase office        
N/A         No Action
IE         industrial engineering        
ESD         electrostatic discharge
QPA         quality process audit        
EOL         end of life
QSA         quality system audit        
EN         engineering notice
ATE          automatic test equipment        
EMI         electromagnetic interference
AOI         automatic optical inspection        
EMC          electromagnetic compatibility
PCBA         print circuit board assembly        
EE         electronic engineer(ing)
TTL          technology transfer list        
EDC         electronic data center
SQA         supplier quality assurance        
ECO         engineering change order
ORT         ongoing reliability testing        
DVT          design  verification test
QM         quality manual        
DOA         dead on arrival
SW         software        
CAD/ID         computer aided design /industrial design
SOW         standard of work        
BIOS         basic input /output system
SCSI         small computer system interface        
AP         application program
SA         software  application        
AFR         annual failure rate
SO         sales order        
NTF          no trouble found
MRP         material requirement planning        
CND         can not duplicate
AVL         approved vendor list        
DPPM         defect parts per million
FAI         first article inspection        
FMEA         failure mode effect analysis
CLCA         closed loop corrective action        
LRR         line reject rate measured by DPPM
MQR         monthly quality review        
MTQ         manufacturing ,test and quality
RCA         root cause analysis        
PFMEA         process failure mode effect analysis
SFIS         Shop Floor Information System        
QEM         Quality engineering measurement
BGA         Ball Grid Array        
IC         Integrated Circuit                 
QFP         Quad Flat Pack        
EOS         Elwctrical Over Stress                   
TNB         terminal notebook business        
SMT         Surface Mount Technology
品质人员名称类
QC         quality control        品质管理人员
FQC         final quality control        终点品质管制人员
IPQC         in process quality control        制程中的品质管制人员
OQC        output quality control        最终出货品质管制人员
IQC        incoming quality control        进料品质管制人员
TQC        total quality control        全面质量管理
POC        passage quality control        段检人员
QA        quality assurance        质量保证人员
OQA        output quality assurance        出货质量保证人员
QE        quality engineering        品质工程人员
品质保证类
FAI         first article inspection        新品首件检查
FAA        first article assurance        首件确认
CP        capability index        能力指数
CPK        capability process index        模具制程能力参数
SSQA        standardized supplier quality audit        合格供应商品质评估
FMEA        failure model effectiveness analysis        失效模式分析
FQC运作类
AQL        Acceptable Quality Level        运作类允收品质水准

S/S        Sample size        抽样检验样本大小
ACC        Accept        允收
REE        Reject        拒收
CR        Critical        极严重的
MAJ        Major        主要的
MIN        Minor        轻微的
Q/R/S        Quality/Reliability/Service        品质/可靠度/服务

AOD        Accept On Deviation        特采
UAI        Use As It        特采
FPIR        First Piece Inspection Report            首件检查报告
PPM        Percent Per Million        百万分之一

制程统计品管专类
SPC        Statistical Process Control        统计制程管制
SQC        Statistical Quality Control        统计品质管制
GRR        Gauge Reproductiveness & Repeatability        量具之再制性及重测性判断量可靠与否
DIM        Dimension        尺寸
DIA        Diameter        直径
N        Number        样品数
其它品质术语类
QIT        Quality Improvement Team        品质改善小组
ZD        Zero Defect        零缺点
QI        Quality Improvement        品质改善
QP        Quality Policy        目标方针
TQM        Total Quality Management        全面品质管理
RMA        Return Material Audit        退料认可
7QCTools        7 Quality Control Tools        品管七大手法
通用之件类
ECN        Engineering Change Notice        工程变更通知(供应商)
ECO        Engineering Change Order        工程改动要求(客户)
PCN        Process Change Notice        工序改动通知
PMP        Product Management Plan        生产管制计划
SIP        Standard Inspection Procedure        制程检验标准程序
SOP        Standard Operation Procedure        制造作业规范
IS        Inspection Specification        成品检验规范
BOM        Bill Of Material        物料清单
PS        Package Specification        包装规范
SPEC        Specification        规格
DWG        Drawing        图面
系统文件类
ES        Engineering Standard        工程标准
CGOO        China General        PCE龙华厂文件
IWS        International Workman Standard        工艺标准
ISO        International Standard Organization        国际标准化组织
GS        General Specification        一般规格
部类
PMC         Production & Material Control        生产和物料控制
PCC            Product control center                  生产管制中心
PPC        Production Plan Control        生产计划控制
MC        Material Control        物料控制
DC        Document Center        资料中心
QE        Quality Engineering        品质工程(部)
QA        Quality Assurance        品质保证(处)
QC        Quality Control        品质管制(课)
PD        Product Department        生产部
LAB        Laboratory        实验室
IE        Industrial Engineering        工业工程
R&D        Research & Design        设计开发部
生产类
PCs        Pieces        个(根,块等)
PRS        Pairs        双(对等)
CTN        Carton        卡通箱
PAL        Pallet/skid        栈板
PO        Purchasing Order        采购订单
MO        Manufacture Order        生产单
D/C        Date Code        生产日期码
ID/C        Identification Code        (供应商)识别码
SWR        Special Work Request        特殊工作需求
L/N        Lot Number        批号
P/N        Part Number        料号
OEM        Original Equipment Manufacture        原设备制造
PC        Personal Computer        个人电脑
CPU        Central Processing Unit        中央处理器
A.S.A.P        As Soon As Possible        尽可能快的
E-MAIL        Electrical-Mail        电子邮件
N/A        Not Applicable        不适用
QTY        Quantity        数量
I/O        input/output        输入/输出
NG        Not Good        不行,不合格
C=0        Critical=0        极严重不允许
APP        Approve        核准,认可,承认
CHK        Check        确认
ASS'Y        Assembly        装配,组装
T/P        True Position        真位度
5WIH        When, Where, Who, What, Why, How to
6M        Man, Machine, Material, Method, Measurement, Message
4MTH        Man, Material, Money, Method, Time, How        人力,物力,财务,技术,时间(资源)
SQA        Strategy Quality Assurance        策略品质保证
DQA        Design Quality Assurance        设计品质保证
MQA        Manufacture Quality Assurance        制造品质保证
SSQA        Sales and service Quality Assurance        销售及服务品质保证
LRR        Lot Reject Rate        批退率
SPS        Switching power supply        电源箱
DT        Desk Top        卧式(机箱)
MT        Mini-Tower        立式(机箱)
DVD        Digital Video Disk
VCD        Video Compact Disk
LCD        Liquid Crystal Display
CAD        Computer Aided Design
CAM        Computer Aided Manufacturing
CAE        Computer Aided Engineering
PCB        Printed Circuit Board        印刷电路板
CAR        Correction Action Report        改善报告
NG        Not Good        不良
WDR        Weekly Delivery Requirement        周出货要求
PPM        Percent Per Million        百万分之一
TPM        Total Production Maintenance        全面生产保养
MRP        Material Requirement Planning        物料需计划
OS        Operation System        作业系统
TBA        To Be Assured        待定,定缺转载请注明出自六西格玛品质论坛 http://www./cdb/,本贴地址:http://www./cdb/viewthread.php?tid=165383

    本站是提供个人知识管理的网络存储空间,所有内容均由用户发布,不代表本站观点。请注意甄别内容中的联系方式、诱导购买等信息,谨防诈骗。如发现有害或侵权内容,请点击一键举报。
    转藏 分享 献花(0

    0条评论

    发表

    请遵守用户 评论公约