1. before the feeding control and the wind meets the tube welding, to the good center, in the hole guaranteed that ¢204 the pipeline can pass through. the
2. welding uses the manual arc welding, welding rod trademark J420G. before the
3. painting, must carry on the superficial stain removal, the elimination welding residual and so on, its quality scale sees JB/T5000.12 the stipulation; Prime, in Huang He the blue color (according to color model) the polyurethane finishes two. Besides various laps spread the yellow paint, other spread the blue color. In the paint does not allow to contain the lead. Does not allow to have leaks flaws and so on paint, wrinkle paint.
4. sealants and so on lap like seal lax available CH107, JLC-1 spread in the slit main point. on
5.2 terminal plate's six studs install in the dust cover when the MRM80.5.1 dustproof Taiwan welds. after the
6. overall width treats buys shakes hand, determined.