M1 (make 1) An increase worked by lifting the horizontal thread lying between needles and placing it onto left needle. Purl this new stitch through the back loop - 1 st increased. 1/1 LC (1 over 1 left cross) Slip 1 st to cable needle and hold in front, k1 tbl, then k1 tbl from cable needle. 1/1 LPC (1 over 1 left purl cross) Slip 1 st to cable needle and hold in front, p1, then k1 tbl from cable needle. 1/1 RPC (1 over 1 right purl cross) Slip 1 st to cable needle and hold in back, k1 tbl, then p1 from cable needle. 1/2 LC (1 over 2 left cross) Slip 1 st to cable needle and hold in front, (k1 tbl) twice, then k1 tbl from cable needle. PATTERN STITCHES Small Cable pattern (multiple of 6 sts) Note: All k sts are worked through the back loop (tbl) in the Small Cable pattern. Rnds 1-3: *P2, k1 tbl; rep from * around. Rnd 4: *P2, 1/1 LPC, 1/1 RPC; rep from * around. Rnd 5: K tbl the knit sts and p the purl sts. Rnd 6: P3, *1/1 LC, p4; rep from * around to last 3 sts, 1/1 LC, p1. Rnd 7: Rep Rnd 5. Rnd 8: *P2, 1/1 RPC, 1/1 LPC; rep from * around. Rnds 9-11: Rep Rnd 5. Rep Rnds 4-11 for Small Cable pattern. Ribbed Cable pattern (over 9 sts) Note: All k sts are worked through the back loop (tbl) in the Ribbed Cable pattern. Rnds 1-3: (P2, k1 tbl) 3 times. Rnd 4: P2, 1/1 LPC, p1, k1 tbl, p1, 1/1 RPC. Rnd 5: K tbl the knit sts and p the purl sts. Rnd 6: P3, 1/1 LPC, k1 tbl, 1/1 RPC, p1. Rnd 7: Rep Rnd 5. Rnd 8: P4, 1/2 LC, p2. Rnd 9: Rep Rnd 5. Rnd 10: P3, 1/1 RPC, k1 tbl, 1/1 LPC, p1. Rnd 11: Rep Rnd 5. Rnd 12: P2, 1/1 RPC, p1, k1 tbl, p1, 1/1 LPC. Rep Rnds 1-12 for Ribbed Cable pattern. K1, p1 Rib worked in rnds (multiple of 2 sts) Rnd 1: *K1, p1; rep from * to end of rnd. Rep Rnd 1 for K1, p1 Rib worked in rnds. |