涂层性能标准检验要求

 王老轨的资料 2016-03-10

IMO PSPC:INSPECTION REQUIREMENTS
涂层性能标准:检验要求

 

     Primary surface preparation (prior to shop primerapplication)
初次表面处理(预涂底漆之前)

-        Measure and record steel temp, RH, dew point priorto blasting and “at times of sudden changes in weather”
在喷砂和“天气变化”之前,应测量钢板表面温度、相对湿度和露点,并记录

-        Check plate surface for soluble salt, oil, greaseand other contaminants
检查钢板表面,去除溶性盐、油、脂和其它污物

-        Monitor cleanliness
清洁度监控

     Shop primer thickness
车间底漆厚度

-        If shop primer is compatible with the main coatingsystem, and certified as such, thickness and curing of the zinc silicate must beconfirmed to conform with the specified values
如果车间底漆与主涂层兼容并得到鉴定认可,那么其硅酸锌车间底漆可和其他的涂层组合使用

     Block Assembly
分段组装

-        Visual inspection of steel surface treatment,including edge treatment after construction of the block and prior to commencementof secondary surface preparation
分段建造完工之后、二次表面处理之前可对钢材表面处理结果进行检验,包括边角的处理

-        Ensure free from oil, grease or other visualcontamination
确保除掉油脂或其它可见污物

-        Visual inspection after blasting/grinding/cleaning
喷砂、打磨、清洁之后的检验

-        Check residual salt levels in at least one locationper block prior to application of the first coat of the system
第一度油漆之前,每个分段至少检查一处的水溶盐含量

-        Monitor and record surface temp, RH, dew pointduring coating application and curing
在喷砂涂层涂装和固化阶段,应监控钢板表面温度、相对湿度和露点,并记录

-        Check DFT after each coat of paint
检查每层涂层的干膜厚度

     Erection
分段合拢

-        Similar procedure as in block assembly
和分段组装的程序一样