May 2005 Build Photos
Hours of build time for May: 98
May 01 & 02.
|
|
|
|
Bulkhead #4 |
Parts all assembled & glued. |
|
|
|
|
|
|
|
|
Doublers on bulkhead #3 in background & on part of #5, on the floor. |
|
|
|
|
|
|
|
|
Tangent doublers all cut & beveled. |
|
|
|
|
|
|
|
|
The next day. |
Sanding #4 to remove excess epoxy. |
|
|
|
|
|
|
|
|
#4 all sanded and gluing on the doublers. |
|
|
|
|
|
|
|
|
May 03.
May 05.
|
|
|
|
|
|
Can't have too many clamps. |
|
|
|
|
|
|
|
|
|
May 06.
|
|
|
|
|
|
Transom & the lower 1/2 of bulkhead #6. |
|
|
|
|
|
|
|
|
Another angle of transom & #6. |
|
|
|
|
|
|
May 08.
|
|
|
|
|
Bulkhead #6 all glued together. |
|
|
|
|
|
|
|
|
Bulkhead #7 all glued up. |
|
|
|
|
|
|
|
|
Bulkhead #8 glued up. Ran out of small c clamps & had to use the bar clamps. |
|
|
|
|
|
|
|
|
Out of clamps & out of room. |
|
|
|
|
|
|
|
|
Wendy hard at work sanding the tangent doublers. |
|
|
|
|
|
|
|
May 12.
|
|
|
|
|
|
Transom & transom doublers assembled. |
|
|
|
|
|
|
|
|
Bulkhead #9 & transom assembled. |
|
|
|
|
|
|
|
|
Bulkheads 6,7 & 8 finished. |
|
|
|
|
|
|
|
|
May 13.
|
|
|
|
|
All the bulkheads ready to go. |
|
|
|
|
|
|
|
|
Bulkhead #1 in about the place it will be during the rest of constuction. It is hanging on the wall that needs to come out. |
|
|
|
|
|
Party! Friday May 13th.
|
|
|
|
|
|
"I can't belive your taking my bedroom wall" |
|
|
|
|
|
|
|
|
Beth takes the first swing. |
|
|
|
|
|
|
|
|
"That was fun, next."as she hands off the hammer to her sister. |
|
|
|
|
|
|
|
|
Stephanie takes her shot. |
|
|
|
|
|
|
|
|
Even the little ones get a shot. |
|
|
|
|
|
|
|
|
"Hey, Mom, can I do this to my bedroom?" |
|
|
|
|
|
|
|
|
"What a mess, you should have charged a dollar a whack." |
|
|
|
|
|
|
|
|
Making holes in walls is fun! |
|
|
|
|
|
|
|
|
May 14.
|
|
|
|
|
The mess cleaned up and the hole enlarged to final size. |
|
|
|
|
|
|
|
|
Ready to make the "bump". |
|
|
|
|
|
May 18.
|
|
|
|
|
Wall to bedroom cut open & ready for framing. |
|
|
|
|
|
|
|
|
|
All framed & 1/2 drywalled. |
|
|
|
|
|
|
May 19.
|
|
|
|
|
|
And what it looks like from the bedroom/office. |
|
|
|
|
|
|
|
|
All finshed. Makes a great place to store tools. The building stocks are on the floor. Should have unpacked these earlier as they are still damp. |
|
|
|
|
|
|
|
|
The bedroom side. Just need to texture & paint. |
|
|
|
|
|
|
|
May 24.
|
|
|
|
|
The building stock timbers after 3 hot, dry days. |
|
|
|
|
|
|
|
|
The end rails with legs attached. One took a bad twist. |
|
|
|
|
|
|
|
|
And the new building stocks cut from 3/4 plywood & glued together. |
|
|
|
|
|
|
May 26.
|
|
|
|
|
Aft half of the strongback. |
|
|
|
|
|
|
|
|
And the lead bulb halfs on their skate boards even fit under the side rails. |
|
|
|
|
|
May 30.
|
|
|
|
|
The forward station set in place. I deviated from the plans here. The uprights & legs are to be on the forward side of the rail. I flipped it to the aft side so the legs will be on the main garage floor not on the step up in the bump. |
|
|
|
|
|
|
|
|
Building stocks ready for the 1st bulkhead. |
|
|
|
|
|
|
|
|
|
|
1 & 2 with #3 getting ready. |
|
|
|
|
|
|
|
|
|
|
|
And #5. This is going fast! |
|
|
|
|
|
|
|
|
#6 in place & #7 going in. |
|
|
|
|
|
|
|
|
|
|
|
Wow. Thats the backbone on top checking alignment. |
|
|
|
|
|
|
|
|
Lots of visual progress today. |
|
|
|
|
|
|
|
|
All cleaned up, time to call it a day. |
|
|
|
|
|
|
|
May 31.
|
|
|
|
|
|
|
|
And yes, the garage door closes. |
|
|
|
|
|
|
|

|