28(Suppl.)凡亚等:西部高山峡谷区特大电站泄洪洞进水口边坡与塔基优化处理———以长河坝水电站为例229 RockMechanicsandEngineering,29(3):442-458. (2)泄洪洞进口边坡优化后,塔基基础外移,离 SunX,ChenGQ,ZhangGZ,etal.2020.Microstructurefracture 坡面近,需注意岩体卸荷及结构面不利组合塔基基 characteristicsanddilatancyeffectofrockbridgeunderdirectshear 础边坡不利影响,进行稳定性分析与计算,必要时进 tests[J].JournalofEngineeringGeology,28(2):246-254. 行支护工程处理措施。 YangL,DengJH,ZhenL,etal.2017.Monitoringanalysisforslope (3)本文总结了大渡河上特大电站长河坝水电 stabilityattheentranceofspillwaytunnelofChanghebaHydropower - Station[J].ChinaRuralWaterandHydropower,(11):129133. 站泄洪洞进水口边坡优化及塔基基础边坡等成功的 YangQ,WangSG,LiCY,etal.2020.Internaldrivingforceof 处理经验,可为其他类似工程提供经验借鉴。 deformationandfailureofrockmassstructureunbalancedforce[J]. JournalofEngineeringGeology,28(2):202-210. ZhouCB.2013.Aprospectofresearchesonlifecyclesafetycontrolon 参考文献 highsteeprockslopesinhydropowerengineering[J].Chinese HanXJ,MengFQ.2016.Stabilityanalysisofintakeslopeofflood- JournalofRockMechanicsandEngineering,(6):10811093. dischargesystemofChanghebahydropowerstation[J].Sichuan 韩雪娇,蒙富强.2016.长河坝水电站泄洪系统进口边坡稳定性分析 WaterPower,35(1):64-67. 研究[J].四川水力发电,35(1):64-67. HuJS,LiuYB,TangSM,etal.2016.Engineeringgeological 胡金山,刘永波,唐世明,等.2016.长河坝水电站枢纽区工程地质勘 investigationandevaluationinprojectareaofChangheba - 察与评价[J].四川水力发电,35(1):610. - HydropowerStation[J].SichuanWaterPower,35(1):610. 黄润秋.2008.岩石高边坡发育的动力过程及其稳定性控制[J].岩 HuangRQ.2008.Geodynamicalprocessandstabilitycontrolofhighrock- 石力学与工程学报,27(8):15251544. slopedevelopment[J].ChineseJournalofRockMechanicsand 黄润秋.2005.中国西南岩石高边坡的主要特征及其演化[J].地球 Engineering,27(8):1525-1544. 科学进展,20(3):292-297. HuangRQ.2005.Maincharacteristicsofhighrockslopesin - 李世贵,黄达,石林,等.2018.基于极限应变判据动态局部强度折 southwesternChinaandtheirdynamicevolution[J].Advancesin- 减的边坡破坏演化数值模拟[J].工程地质学报,26(5):1227 - EarthScience,20(3):292297. 1236. LiSG,HuangD,ShiL,etal.2018.NumericalModelingoftheevolution 李毅,胡兰桂,汪洋,等.2018.涔天河工程1号泄洪洞出口边坡与隧 ofslopefailureusinglimitstraincriterionanddyanmicstrength 洞联合变形分析[J].工程地质学报,26(4):1095-1104. reductionmethod[J].JournalofEngineeringGeology,26(5): 刘永波,唐世明,王宗琼,等.2016.长河坝水电站泄洪洞进口边坡地 - 12271236.- 质条件复核及优化治理[J].四川水力发电,35(1):4345. LiY,HuLG,WangY,etal.2018.Combinedslopeandtunnel 宋胜武,冯学敏,向柏宇,等.2011.西南水电高陡岩石边坡工程关键 deformationanalysisforno.1spillwaytunneloutletofcentianhe 技术研究[J].岩石力学与工程学报,30(1):1-22. project[J].JournalofEngineeringGeology,26(4):1095-1104. 宋胜武,向柏宇,杨静熙,等.2010.锦屏一级水电站复杂地质条件下 LiuYB,TangSM,WangZQ,etal.2018.Reviewofengineering 坝肩高陡边坡稳定性分析及其加固设计[J].岩石力学与工程 geologicalconditionsandoptimaltreatmentoftheintakeslopeofthe- 学报,29(3):442458. spillwaytunnelofChanghebahydropowerstation[J].SichuanWater 孙祥,陈国庆,张广泽,等.2020.岩桥直剪细观破坏特征与剪胀效应 - Power,35(1):4345. 研究[J].工程地质学报,28(2):246-254. SongSW,FengXM,XiangBY,etal.2011.Researchonkey 杨磊,邓建辉,郑路,等.2017.长河坝水电站泄洪洞进口边坡稳定性 technologiesforhighandsteeprockslopesofhydropowerengineering - 监测分析[J].中国农村水利水电,(11):129133. insouthwestChina[J].ChineseJournalofRockMechanicsand- 杨强,王守光,李超毅,等.2020.岩体结构变形破坏的内在驱动力 - Engineering,30(1):122.- 不平衡力[J].工程地质学报,28(2):202210. SongSW,XiangBY,YangJX,etal.2010.Stabilityanalysisand 周创兵.2013.水电工程高陡边坡全生命周期安全控制研究综 reinforcementdesignofhighandsteepslopeswithcomplexgeology 述[J].岩石力学与工程学报,(6):1081-1093. inabutmentofJinpingIhydropowerstation[J].ChineseJournalof |
|