分享

嘉兴市TPG_AC7120认证_AC7120_电路卡组件的审核标准(8)

 AS质量培训中心 2021-07-15

11 PROGRAMMING N/A

11.1 Component Programming (prior to assembly) N/A

11.1.1.P Are there procedures that define :

a.P - Verification of the identification number and manufacturer identification of unprogrammed component? YES/NO

b.P - Setup and configuration of tools and jigs? YES/NO

c.P - Methodology for verification of program to be loaded in the component? YES/NO

d.P - Method to ensure that correct programming utility software release (including algorithms) and programming socket are used? YES/NO

e.P - Post-programming component validation? YES/NO

f.P - Component identification including re-identification of programmed / reprogrammed component including customer specific requirements? YES/NO

g.P - Identification and segregation of failed component? YES/NO

h.P - Failure analysis for closed loop improvement? YES/NO

i.P - Number of times a component may be programmed or erased and reprogrammed, and how it is recorded as per customer requirement, if required? YES/NO/N/A

Component Programming COMPLIANCE

11.1.1.C Is the component version controlled prior to programming according to procedure? YES/NO

11.1.2.C Is the verification of the program to be loaded into the component being performed as per the procedure? YES/NO

11.1.3.C Is the procedure being followed to ensure that the correct programming utility software release (including algorithms) and programming socket are being used? YES/NO

11.1.4.C Is there evidence that maintenance and preventive maintenance for programming equipment have been done according to the procedure? YES/NO

11.1.5.C Is there evidence of implementation of ESD prevention during handling and setup? YES/NO

11.1.6.C Is there a post-program validation of the loaded software as defined in the procedure?

YES/NO

11.1.7.C Is the component identified after programming / reprogramming as defined in the procedure? YES/NO

11.1.8.C Are failed components segregated according to the procedure? YES/NO

11.1.9.C If required, is the number of times a component is programmed / reprogrammed recorded per procedure? YES/NO/N/A

11.1.10.C Is the setup and configuration of tools and jigs being performed as per the procedure? YES/NO

11.2 Circuit Card Assembly Programming N/A

11.2.1.P Are there procedures that define:

a.P - Setup and configuration of tools, jigs, cables and connectors? YES/NO

b.P - Methodology for verification of program to be loaded in the circuit card assembly? YES/NO

c.P - Method to ensure that correct programming utility software release (including algorithms) is used? YES/NO

d.P - Post-programming Circuit Card Assembly validation? YES/NO

e.P - Circuit Card Assembly identification including re-identification of

programmed/reprogrammed circuit card assembly including customer specific requirements? YES/NO

f.P - Identification and segregation of failed Circuit Card Assembly? YES/NO

g.P - Failure analysis for close loop improvement? YES/NO

h.P - Number of times a Circuit Card Assembly may be programmed or erased and reprogrammed, and how it is recorded as per customer requirement, if required? YES/NO/N/A

Circuit Card Assembly Programming COMPLIANCE

11.2.1.C Is the setup and configuration of tools and jigs being performed as per the procedure? YES/NO

11.2.2.C Is the method for verification of the program to be loaded in Circuit Card Assembly being followed? YES/NO

11.2.3.C Is the procedure being followed to ensure that the correct programming utility software release (including algorithms) is being used? YES/NO

11.2.4.C Is there evidence that maintenance and preventive maintenance for programming equipment have been done according to the procedure? YES/NO

11.2.5.C Is there evidence of implementation of ESD prevention during handling and setup? YES/NO

11.2.6.C Is there a post-program validation of the loaded software as defined in the procedure? YES/NO

11.2.7.C Is the component or sub-assembly identified after programming / reprogramming as defined in the procedure? YES/NO

11.2.8.C Are Circuit Card Assemblies with component programming failure segregated according to the procedure? YES/NO

11.2.9.C If required, is the number of times a Circuit Card Assembly is programmed

reprogrammed recorded per procedure? YES/NO/N/A

    本站是提供个人知识管理的网络存储空间,所有内容均由用户发布,不代表本站观点。请注意甄别内容中的联系方式、诱导购买等信息,谨防诈骗。如发现有害或侵权内容,请点击一键举报。
    转藏 分享 献花(0

    0条评论

    发表

    请遵守用户 评论公约

    类似文章 更多