WWW.GREENGLUECOMPANY.COM COSTANALYSISOFTHESEWALLS Herewewilltakealookatthecostofeachoftheassembliesthatfeatureproductonbothsides. Reference1Reference1 MLVAssemblyMLVAssemblyGreenGlue Single5/8”onSingle5/8”onGreenGlueI ILimpMassIIConstrainedII BothSidesBothSides Drywall,materials$0.68$1.36$0.64$0.90$1.02$1.28 Drywall,labor$1.20$2.40$1.14$1.62$1.80$2.28 MLV,materials00$2.20$2.2000 MLV,labor00$1.30$1.3000 GreenGlue,materials0000$0.78$1.56 GreenGlue,labor0000$0.18$0.36 Framework,materials$0.40$0.40$0.40$0.40$0.40$0.40 Framework,labor$0.60$0.60$0.60$0.60$0.60$0.60 Insulation,materials$0.33$0.33$0.33$0.33$0.33$0.33 Insulation,labor$0.40$0.40$0.40$0.40$0.40$0.40 Sealant,materials&labor$0.65$0.65$0.65$0.65$0.65$0.65 Mudding/taping,materials&labor$0.56$0.56$0.56$0.56$0.56$0.56 TotalCost,materials$1.61$2.29$3.77$4.03$2.73$3.77 TotalCost,materials+labor$4.82$6.70$8.22$8.96$6.72$8.42 STC404445445256 $$$/improvementinSTCReference$0.47$0.68$1.04$0.16$0.23 OITC283331333639 $$$/improvementinOITCReference$0.38$1.13$0.83$0.24$0.33 TestNumberOL05-1003OL05-1059OL05-0822OL05-1054OL05-0416OL05-1035 RESULTSWILLVARY AllcostsbasedonnationalaveragematerialandlaborratestakenfromtheNationalConstructionEstimator,aCraftsmanproduct.Rateswillvarycon- siderablydependingonlocation,timeofyear,andotherfactors.Laborwillvarythemost. TheseMLVassembliesaresimilarincosttotheassemblywithGreenGlueonbothsidesofthewall.Asthetableandthechartaboveshows,thereturn oninvestmentforGreenGlueassembliesissuperiortosimplyaddingmass,andparticularlybetterthanthelimpmassproducts.OL05-1035wasnomi- nallyidenticaltoOL05-0416,andSTCwas56forbothwalls,butOITCwas40forOL05-1035.CalculationsreflectthelowerOITCvalue. |
|