Green Glue Vs. Mass Loaded Vinyl.pdf
2021-09-13 | 阅:  转:  |  分享 
  
WWW.GREENGLUECOMPANY.COM
COSTANALYSISOFTHESEWALLS
Herewewilltakealookatthecostofeachoftheassembliesthatfeatureproductonbothsides.
Reference1Reference1
MLVAssemblyMLVAssemblyGreenGlue
Single5/8”onSingle5/8”onGreenGlueI
ILimpMassIIConstrainedII
BothSidesBothSides
Drywall,materials$0.68$1.36$0.64$0.90$1.02$1.28
Drywall,labor$1.20$2.40$1.14$1.62$1.80$2.28
MLV,materials00$2.20$2.2000
MLV,labor00$1.30$1.3000
GreenGlue,materials0000$0.78$1.56
GreenGlue,labor0000$0.18$0.36
Framework,materials$0.40$0.40$0.40$0.40$0.40$0.40
Framework,labor$0.60$0.60$0.60$0.60$0.60$0.60
Insulation,materials$0.33$0.33$0.33$0.33$0.33$0.33
Insulation,labor$0.40$0.40$0.40$0.40$0.40$0.40
Sealant,materials&labor$0.65$0.65$0.65$0.65$0.65$0.65
Mudding/taping,materials&labor$0.56$0.56$0.56$0.56$0.56$0.56
TotalCost,materials$1.61$2.29$3.77$4.03$2.73$3.77
TotalCost,materials+labor$4.82$6.70$8.22$8.96$6.72$8.42
STC404445445256
$$$/improvementinSTCReference$0.47$0.68$1.04$0.16$0.23
OITC283331333639
$$$/improvementinOITCReference$0.38$1.13$0.83$0.24$0.33
TestNumberOL05-1003OL05-1059OL05-0822OL05-1054OL05-0416OL05-1035
RESULTSWILLVARY
AllcostsbasedonnationalaveragematerialandlaborratestakenfromtheNationalConstructionEstimator,aCraftsmanproduct.Rateswillvarycon-
siderablydependingonlocation,timeofyear,andotherfactors.Laborwillvarythemost.
TheseMLVassembliesaresimilarincosttotheassemblywithGreenGlueonbothsidesofthewall.Asthetableandthechartaboveshows,thereturn
oninvestmentforGreenGlueassembliesissuperiortosimplyaddingmass,andparticularlybetterthanthelimpmassproducts.OL05-1035wasnomi-
nallyidenticaltoOL05-0416,andSTCwas56forbothwalls,butOITCwas40forOL05-1035.CalculationsreflectthelowerOITCvalue.