CONTENTS目录1K410000市政公用工程技术·········································
·································11K411000城镇道路工程···············
··························································11K4110
10城镇道路工程结构与材料···················································
·11K411020城镇道路路基施工··············································
···············61K411030城镇道路基层施工································
·····························71K411040城镇道路面层施工··················
·········································101K420090城镇道路工程质量检查与验
收············································141K412000城市桥梁工程·
·································································
·····171K412010城市桥梁结构形式及通用施工技术·································
·····171K412020城市桥梁下部结构施工······································
···············251K412030城市桥梁上部结构施工····························
·························281K420100城市桥梁工程质量检查与验收···············
·····························311K412040管涵和箱涵施工·················
·············································331K420160城市桥梁工程施工
安全事故预防·········································341K413000城市轨道交通
工程······························································
···361K413010城市轨道交通工程结构与特点·····································
·······361K413020明挖基坑施工········································
·························371K413040喷锚暗挖(矿山)法施工·············
······································441K420110城市轨道交通工程施工质量检查与
检验································481K414000城市给水排水工程··········
·······················································501K41401
0给水排水厂站工程结构与特点············································501K4
14020给水排水厂站工程施工·················································
····521K420120城市给水排水场站工程质量检查与验收································
561K415000城市管道工程·············································
··························581K415010城市给水排水管道工程施工···············
································581K415020城市供热管道工程施工···········
··········································621K415030城市燃气管道工程施工·
····················································661K420130城
市管道工程质量检查与验收············································701K4150
40城市综合管廊························································
·········711K416000生活垃圾处理工程···································
······························731K416010生活垃圾填埋处理工程施工···········
····································731K417000施工测量与监控量测·······
·······················································771K41701
0施工测量···························································
············771K417020监控量测·····································
··································781K420000市政公用工程项目施工管理·······
·····················································801K420010
市政公用工程施工招标投标管理·········································801K42002
0市政公用工程造价管理·····················································
811K420030市政公用工程合同管理···········································
··········821K420040市政公用工程施工成本管理·······························
················831K420050市政公用工程施工组织设计·························
······················831K420060市政公用工程施工现场管理···················
····························851K420080市政公用工程施工质量管理·············
··································871K420140市政公用工程施工安全管理·······
········································871K420150明挖基坑施工安全事故预防·
··············································881K420190市政公用工程竣
工验收与备案············································89考点汇总(参考答案
)·······························································
··················901K410000市政公用工程技术1K411000城镇道路工程1K411010城镇
道路工程结构与材料1K411011城镇道路分类与分级1.分类方法有多种形式,根据道路在城镇规划道路系统中所处的地位划分为(?
)、(?)、(?)和(?)。2.快速路,又称城市快速路,完全为(?)服务,是解决城市大容量、长距离、快速交通的主要道路。
3.主干路以(?)为主,为连接城市各主要分区的干路,是城市道路网的主要骨架。4.次干路是城市区域性的交通干道,为区域交通集
散服务,兼有(?),结合主干路组成干路网。5.支路为次干路与居住小区、工业区、交通设施等内部道路的连接线路,解决局部地区交通,
以服务功能为主。6.按路面结构类型分类(见表1K411011)(1)沥青路面面层类型包括(?)、(?)和(?)。(
?)适用于各交通等级道路;沥青贯入式与沥青表面处治路面适用于(?)、(?)。(2)水泥混凝土路面面层类型包括普通混凝土、钢筋
混凝土、连续配筋混凝土与(?)混凝土,适用于(?)。7.按力学特性分类(1)柔性路面:荷载作用下产生的(?)、(?),在
反复荷载作用下产生累积变形,它的破坏取决于(?)和(?)。柔性路面主要代表是各种沥青类面层,包括沥青混凝土面层、沥青碎石面层
、沥青贯入式碎(砾)石面层等。(2)刚性路面:行车荷载作用下产生板体作用,(?),(?),呈现出较大的刚性,它的破坏取决于
(?)。刚性路面主要代表是(?)。第1页?共123页1K411012沥青路面结构组成特点1.城镇沥青路面是城市
道路的典型路面,道路结构由(?)、(?)、(?)组成。2.行车荷载和自然因素对路面结构的影响随深度的增加而逐渐减弱,因而对路
面材料的(?)、(?)和(?)的要求也随深度的增加而逐渐(?)。各结构层的材料回弹模量应(?)递减。3.基层的结构
类型可分为柔性基层、半刚性基层;在半刚性基层上铺筑面层时,城市主干路、快速路应适当加厚面层或采取其他措施以减轻(?)。4.路基
根据材料不同,路基可分为(?)路基、(?)路基、(?)路基。5.(?)、(?)及含有机质细粒土,不适于做路基填料。因条件
限制而必须采用上述土做填料时,应掺加(?)或(?)等结合料进行改善。6.地下水位高时,宜提高路基顶面标高。在设计标高受限
制,未能达到中湿状态的路基临界高度应选用(?)或(?)或(?)做路基填料。同时应采取在边沟下设置排水渗沟等降低地下水位
的措施。7.应根据(?)和(?)来选择基层材料。湿润和多雨地区,宜采用(?)。8.高级沥青路面面层可划分为上(表
)面层、中面层、下(底)面层。沥青路面面层类型热拌沥青混合料各种等级道路的面层包括:SMA和OGFC冷拌沥青混合
料沥青贯入式面层支路及其以下道路的面层、支路的表面层城市次干路以下道路面层9.路基性能主要指标:1)(?)2)(?)10.基层
是路面结构中的(?),主要承受车辆荷载的(?),并把面层下传的应力扩散到路基。11.底基层顶面宜铺设沥青封层或防水土工织物;
为防止地下渗水影响路基,排水基层下应设置由水泥稳定粒料或密级配粒料组成的不透水底基层。12.路面使用指标:1)(?);2)(?)
;3)(?);4)(?);5)(?)13.降噪排水路面的面层结构组合一般为:上面层采用(?)沥青混合料,中面层、下面层等采用
(?)。这种组合既满足沥青路面强度高、高低温性能好和第2页?共123页平整密实等路用功能,又实现了城市道路排水降噪功
能。1K411013水泥混凝土路面构造特点1.水泥混凝土路面结构的组成包括(?)、(?)、(?)及(?)。2.在温度和
湿度状况不良的环境下,水泥混凝土道路应设置(?),以改善路面结构的使用性能。3.在季节性冰冻地区,道路结构设计总厚度(?)
最小防冻厚度要求时,根据路基干湿类型和路基填料的特点设置垫层;其差值即是垫层的厚度。水文地质条件不良的土质路堑,路基土湿度较大时,
宜设置(?)。路基可能产生不均匀沉降或不均匀变形时,宜加设(?)。4.垫层的宽度应与路基宽度相同,其最小厚度为(?)。5.
水泥混凝土道路基层的作用:防止或减轻由于(?)、(?)和(?)等病害;在垫层共同作用下,控制或减少(?)或体积变形对混
凝土面层产生的不利影响;为混凝土面层施工提供稳定而坚实工作面,并改善接缝的传荷能力。6.基层材料的选用原则:根据(?)和(
?)来选择基层材料。特重交通重交通中、轻交通贫混凝土碾压混凝土沥青混凝土水泥稳定粒料石灰稳定粒料级配粒料水泥稳定粒料沥青稳定碎石
材料7.基层的宽度应根据混凝土面层施工方式的不同,比混凝土面层每侧至少宽出(?)(小型机具施工时);(?)(轨模式摊铺机施
工时);(?)(滑模式摊铺机施工时)8.水泥混凝土面层应具有足够的(?)、(?)(抗冻性),表面抗滑、耐磨、平整。9
.纵向接缝是根据(?)和施工铺筑宽度设置。一次铺筑宽度小于路面宽度时,应设置带拉杆的平缝形式的纵向施工缝。一次铺筑宽度大于
(?)时,应设置带拉杆的假缝形式的纵向缩缝,纵缝应与线路中线平行。10.横向接缝可分为横向缩缝、胀缝和横向施工缝。横向施工缝尽
可能选在缩缝或胀缝处。快速路、主干路的横向缩缝应加设(?);在邻近桥梁或其他固定构筑物处、板厚改变处、小半径平曲线等处,应设置
(?)。第3页?共123页11.对于特重及重交通等级的混凝土路面,横向胀缝、缩缝均设置传力杆。在自由边处,承受繁重交
通的胀缝、施工缝,小于(?)的面层角隅,下穿市政管线路段,以及雨水口和地下设施的检查井周围,应(?)。12.混凝土面层应具
有较大的粗糙度,可采用(?)、(?)、(?)或(?)等方法形成面层的构造深度。13.海砂(?)用于混凝土面层。14.
钢筋的品种、规格、成分,应符合设计和现行国家标准规定,具有生产厂的牌号、炉号,检验报告和合格证,并经(?)(含见证取样)合
格。钢筋不得有锈蚀、裂纹、断伤和刻痕等缺陷。传力杆(拉杆)、滑动套材质、规格应符合规定。15.胀缝板宜用厚(?),水稳定
性好,具有一定柔性的板材制作,且应经防腐处理。填缝材料宜用(?)、(?)、(?)、(?)填缝材料,并宜加入耐老化剂。1K411
014沥青混合料的组成与材料1.按级配原则构成沥青混合料序号结构形式特点代表123悬浮-密实结构(胶浆多)骨架-
空隙结构(粗骨料多)(???????????????????)黏聚力较大、内摩擦角较小黏聚力较小内摩擦角较大黏聚力较大、内
摩擦角较大(??????)AM、OGFC(??????)2.城镇道路面层宜优先采用(?)沥青,(?)沥青可作为次干路及其以
下道路面层使用,不宜使用(?)。3.沥青主要技术性能:(?);(?);(?);(?);(?)4.粗集料与沥青的粘附性应有较大
值,城市快速路、主干路的集料对沥青的粘附性应大于或等于(?),次干路及以下道路应大于或等于(?)。5.热拌密级配沥青混合料中
天然砂用量不宜超过集料总量的(?),SMA、OGFC不宜使用(?)。6.城镇快速路、主干路的沥青面层不宜采用(?)作填料
。第4页?共123页7.热拌沥青混合料主要类型普通沥青混合料(AC)悬浮密实SMA(沥青玛蹄脂碎石混合料)OG
FC(排水降噪)骨架空隙类型改性沥青混合料骨架密实适用范围次干路快速路主干路快速路主干路排水路面辅路、人行道(上面层)高
+低+两耐(耐磨、耐久)特点高+低+耐久+抗滑+水稳排水+降噪+抗滑1K411015沥青路面
材料的再生应用1.沥青的老化削弱了沥青与集料颗粒的(?),造成沥青路面的硬化,进而使路面粒料脱落、松散,降低了道路耐久性。2.
沥青路面材料的再生,关键在于(?)。3.再生剂主要采用低粘度石油系的(?)。4.再生剂技术要求:具有软化与渗透能力,即具
备适当的(?);具有良好的(?);具有溶解分散沥青质的能力;具有较高的(?);必须具有良好的(?)和(?)。5.目前再生沥
青混合料最佳沥青用量的确定方法采用(?)。6.再生沥青混合料性能试验指标有:(?)、(?)、(?)、(?)、(?)等。7.再生
沥青混合料的检测项目有(?)、(?)、(?)等,其技术标准参考热拌沥青混合料标准。1K411016不同形式挡土墙的结构特点1.
挡土墙作用:防止坡体的滑移、坍塌;维护土体边坡稳定。2.施工中应按设计规定施作挡土墙的(?)、(?)、(?)和(?)。挡土
墙投入使用时,应进行墙体变形观测,确认合格。3.三种压力中,(?)土压力最小;静止土压力其次;(?)土压力最大,位移也最大。
第5页?共123页1K411020城镇道路路基施工1K411021城镇道路路基施工技术1.路基施工以(?)为
主,(?)为辅;人工配合土方作业时,必须设专人指挥;采用流水或分段平行作业方式。2.城镇道路路基工程包括路基(路床)本
身及有关的土(石)方、沿线的涵洞、(?)、(?)、(?)、排水管线等项目。3.按照(?)批准的交通导行方案设置围挡,
导行临时交通。4.施工现场围挡(墙)应沿工地四周连续设置,不得留有缺口,并根据地质、气候、围挡(墙)材料进行设计
与计算,确保围挡(墙)的(?)、(?)。5.围挡的用材应坚固、稳定、整洁、美观,宜选用(?)、(?)等硬质材料,不
宜使用彩布条、(?)或(?)等。6.施工现场的围挡一般应不低于(?),在市区内应不低于(?),且应符合当地主管部门有关
规定。7.交通导行措施:严格划分(?)、(?)、(?)、(?)、(?)、(?)范围。8.施工现场按照施工方案,在主要道路交
通路口设(?),积极配合交通民警与协警搞好施工和社会交通的疏导工作;减少由于施工造成的交通堵塞现象。9.地下管线、涵洞(管
)等构筑物是城镇道路路基工程中必不可少的组成部分。涵洞(管)等构筑物可与路基(土方)同时进行,但新建的地下管线施
工必须遵循“(?),(?)”、“(?)”的原则。10.填方段内应事先找平,当地面横坡陡于1:5时,需修成台阶形式,每层台阶高
度不宜大于(?),宽度不应小于(?)。11.碾压前检查铺筑土层的宽度、厚度与含水量,合格后即可碾压,碾压“(?)”最后碾压应
采用不小于(?)级的压路机。12.填方高度内的管涵顶面填土(?)以上才能用压路机碾压。13.过街雨水支管沟槽及检查井周
围应用(?)或(?)填实。14.检验与验收项目:主控项目为(?)和(?);一般项目有路床纵断高程、中线偏位、平整度
、宽度、横坡及路堤边坡等要求。1K411022城镇道路路基压实作业要点1.填土应分层进行,下层填土验收合格后,方可进行上层填筑
。路基填土宽度每侧第6页?共123页应比设计规定宽(?)。2.在正式进行路基压实前,有条件时应做试验段,以便取得路
基施工相关的技术参数。试验目的主要有:确定路基(?);合理选用(?),选用压实机具应综合考虑道路不同等级、地质条件、工程量大小
、工期要求、作业环境等;按压实度要求,确定(?);确定路基宽度内每层(?);根据土的类型、湿度、设备及场地条件,选择(?)。
3.土质路基压实应遵循的原则:“(?)、(?)、(?)、(?),(?)。”压路机最快速度不宜超过(?)。4.碾压不到的部位应
采用小型夯压机夯实,防止漏夯,要求夯击面积重叠(?)。1K411023岩土分类与不良土质处理方法1.软土具有(?)、(?)
、(?)、(?)、(?)等特点。2.软土基处理施工方法有数十种,常用的处理方法有(?)、(?)、(?)、(?)等。3.湿
陷性黄土路基处理施工除采用防止地表水下渗的措施外,可根据工程具体情况采取(?)、(?)、挤密法、(?)、化学加固法。4.膨胀土
路基主要应解决的问题是减轻和消除胀缩性对路基的危害。可采取的措施包括:用(?)、(?)或用其他无机结合料对膨胀土路基进行(?
)和(?);(?)或(?)对路基进行加固。1K411030城镇道路基层施工1K411031不同无机结合料稳定基层特性半
刚性基层:无机结合料稳定粒料无机结合料水泥稳定粒料土石灰砂砾石灰粉煤灰(二灰)碎石、砾石水泥稳定土石灰稳定土二灰稳定土板体性
良好良好良好第7页?共123页水稳性抗冻最好高于石灰土最低高于石灰土中低早期强度缩性/温缩性抵抗开裂高<5℃强度
不增长<4℃强度不增长最小稳定碎石稳定砂砾稳定土1K411032城镇道路基层施工技术石灰稳定土与水泥稳定土1.城区施工应采用
厂拌(异地集中拌合)方式,不得使用(?)方式;以保证配合比准确且达到文明施工要求。2.应根据(?)、集料的颗粒组成
变化、施工温度变化、(?)及时调整拌合用水量。3.宜用(?)拌合机进行拌合,拌合应均匀。4.拌成的稳定土类混合料应及时运
送到铺筑现场。水泥稳定土材料自搅拌至摊铺完成,不应超过(?)。5.宜在春末和气温较高季节施工,施工气温应不低于(?)。6.
摊铺好的石灰稳定土应当天碾压成活,碾压时的含水量宜在最佳含水量的允许偏差范围内。水泥稳定土宜在水泥(?)碾压成型。7.直线和
不设超高的平曲线段,应由(?)碾压;设超高的平曲线段,应由(?)碾压。纵、横接缝(槎)均应设(?)。石灰粉煤灰稳
定砂砾(碎石)基层(也可称二灰混合料)8.采用(?)(异地集中拌合)方式,且宜采用(?),配料应准确,拌合
应均匀。9.拌合时应先将(??)。10.每层最大压实厚度为(?),且不宜小于(?)。11.碾压时采用(?)、(?)
压路机碾压。12.禁止用(?)法进行找平。13.混合料的养护采用湿养,始终保持表面潮湿,也可采用(?)和(?)进行养
护,养护期视季节而定,常温下不宜小于为(?)。第8页?共123页级配砂砾(碎石)、级配砾石(碎砾石)基层
14.采用厂拌方式,强制式拌合机拌制。15.宜采用机械摊铺,摊铺应均匀一致,发生粗、细集料(?)(“梅花”、“砂窝”)现象
时,应及时(?)。16.碾压前和碾压中应先适量洒水。碾压中对存在过碾压现象的部位,应进行(?)处理。级配碎石及级配碎砾石视压
实碎石的缝隙情况撒布(?)。17.控制碾压速度,碾压至轮迹不大于(?),表面平整、坚实。1K411033土工合成材料的应用
1.土工合成材料可设置于岩土或其他工程结构内部、表面或各结构层之间,具有(?)、(?)、(?)、(?)、(?)等功能。2.工程
应用(?)台背路基填土加筋路面裂缝防治路基防护目的提高路堤的稳定性(?)减少或延缓(?)坡面防护和冲刷防护过滤与排水作为过滤体和
排水体可用于暗沟、渗沟及坡面防护等道路工程结构中3.土工合成材料应具有足够的(?)、较高(?)、(?)和(?)等性能。4
.用于裂缝防治的玻纤网和土工织物应分别满足(?)、最大负荷延伸率、(?)、单位面积质量等技术要求。5.用土工合成材料和沥青混
凝土面层对旧沥青路面裂缝进行防治,首先要对旧路进行(?)和(?)测定,进而确定旧路处理和新料加铺方案。施工要点是:旧路面清
洁与整平,土工合成材料张拉、搭接和固定,(?),按设计或规范要求铺筑新沥青面层。6.旧水泥混凝土路面裂缝处理要点是:对旧水泥混凝
土路面评定,旧路面清洁与整平,土工合成材料张拉、搭接和固定,洒布粘层油,铺沥青面层。第9页?共123页1K411040
城镇道路面层施工1K411041沥青混合料面层施工技术1.沥青混合料路面施工工艺包括:运输、(?)、(?)、(?)、开放交
通。2.透层粘层封层位置铺筑在面层表面:上封层铺筑在面层下面:下封层沥青下面层和基层顶之间沥青面层之间1.结合:沥青混合料面层与
非1.粘结:将上下面层粘结在一起,成一整体,提高路1.防水:阻隔水分下渗某一层。沥青材料基层结合良好。作用2.填隙:透层油下
渗填补基层面结构的整体性。2.补强:路的某一层表面破坏松散。表面的细小缝隙。2.防水:粘层油也起到阻3.固结:基层表面松散
细集料。断路面上边水下渗的作用。3.按施工方案安排运输和布料,摊铺机前应有足够的运料车等候;对高等级道路,等候的运料车宜在(
?)辆以上。4.运料车应在摊铺机前(?)处空挡等候,摊铺时被摊铺机缓缓顶推前进并逐步卸料,避免撞击摊铺机。每次卸料必须倒净
,如有余料应及时清除,防止硬结。5.城市快速路、主干路宜采用(?)以上摊铺机联合摊铺,其表面层宜采用多机全幅摊铺,以减少施工
接缝。每台摊铺机的摊铺宽度宜小于(?)。通常采用2台或多台摊铺机前后错开(?)呈梯队方式同步摊铺,两幅之间应有(?)
宽度的搭接,上下层搭接位置宜错开(?)以上。6.摊铺前应提前(?)预热摊铺机熨平板使其不低于(?)。7.摊铺速度宜控
制在(?)的范围内。8.摊铺机应采用自动找平方式。下面层宜采用(?)或(?)、(?)控制高程与摊铺厚度,上面层宜采用
(?)或(?)的控制方式。9.最低摊铺温度根据(?)、(?)、(?)、风速及下卧层表面温度。10.半幅施工时,路中一
侧宜预先设置挡板;摊铺时应扣锹布料,不得扬锹远甩;边摊铺边整平,严防集料离析;摊铺不得中途停顿,并尽快碾压;低温施工时,卸下的沥青
混合料应覆盖(?)保温。11.根据摊铺完成的沥青混合料温度情况严格控制(?)、(?)、(?)(包括成型)时机。压实层
最大厚度不宜大于(?),各层应符合压实度第10页?共123页及平整度的要求。12.初压宜采用钢轮压路机静压(?)
遍。碾压时应将压路机的驱动轮面向摊铺机,从(?),在超高路段和坡道上则由(?)碾压。复压应紧跟在初压后开始。碾压路段长度不
超过宜为(?)。13.密级配沥青混合料复压宜优先采用(?)进行碾压,以增加密实性,其总质量不宜小于(?)。相邻碾压带应重
叠1/3~1/2轮宽。对粗骨料为主的混合料,宜优先采用(?)。14.为防止沥青混合料粘轮,对压路机钢轮可涂刷(?)
或(?),严禁刷(?)。亦可向碾轮喷淋添加少量表面活性剂的雾状水。15.接缝:最好形成热接缝,如形成冷接缝处理办法:纵缝:刨
毛槎-清缝-刷粘层油-铲走被软化旧料-跨缝碾压横缝:清除厚度不符要求的部分(3m直尺检查)-刨毛槎-清
缝-刷粘层油-铲走被软化旧料-先横向碾压-在纵向碾压16.热拌沥青混合料路面应待摊铺层自然降温至表面温度低于(
?)后,方可开放交通。1K411042改性沥青混合料面层施工技术1.改性沥青混合料正常生产温度应根据改性沥青品种、(?)、
(?)、铺装层的厚度确定,通常宜较普通沥青混合料的生产温度提高(?)。2.拌合机宜备有保温性能好的成品储料仓,贮存过程中混合料
温降不得大于(?)且具有沥青(?)功能。改性沥青混合料的贮存时间不宜超过(?);改性沥青SMA混合料只限(?);OG
FC混合料宜(?)。3.在喷洒有粘层油的路面上铺筑改性沥青混合料时,宜使用(?)。改性沥青SMA混合料施工温度应试验确
定,一般情况下,摊铺温度不低于(?)。4.摊铺速度宜放慢至(?)。松铺系数应通过试验段取得。5.摊铺机应采用(?)方式
,中、下面层宜采用钢丝绳或导梁引导的高程控制方式,上面层宜采用(?)式平衡梁。6.初压开始温度不低于(?),碾压终了的表面
温度应不低于(?)。7.宜采用振动压路机和钢筒式压路机碾压,不应采用(?)碾压。OGFC混合料宜采用(?)以上钢筒式
压路机碾压。8.振动压路机应遵循“(?)、(?)、(?)、(?)”的原则,即紧跟在摊铺机后面,采取高频率、低振幅的方式慢速碾压。
这也是保证平整度第11页?共123页和密实度的关键。如发现SMA混合料高温碾压有推拥现象,应复查其级配是否合适。(
?)。9.沥青混合料面层施工质量验收主控项目:(?)、(?)、(?)、(?)。10.沥青混合料面层压实度,对城市快速路、主干路
不应小于(?);对次干路及以下道路不应小于(?)。检查数量:每1000㎡测1点。检验方法:(?)(马歇尔击实试件密度
,试验室标准密度)。11.面层厚度应符合设计规定,允许偏差为-5~+10mm。检查数量:每1000㎡测1点。检验
方法:(?)或(?),用钢尺量。12.弯沉值,不应大于设计规定。检查数量:设计规定时每车道、每20m测1点。检验方法
:(?)。1K411043水泥混凝土路面施工技术1.混凝土的配合比设计在兼顾(?)的同时应满足(?)、(?)、(?)三
项指标要求。2.混凝土外加剂的使用应符合:高温施工时,混凝土拌合物的初凝时间不得小于(?),低温施工时,终凝时间不得大于(?)
。3.搅拌过程中,应对拌合物的(?)及稳定性、(?)及均匀性、坍落度损失率、振动粘度系数、(?)、(?)、(?)、离析等项
目进行检验与控制,均应符合质量标准的要求。4.宜使用(?),钢模板应顺直、平整,每(?)设置1处支撑装置。如采用(?
),应质地坚实,变形小,无腐朽、扭曲、裂纹,且用前须浸泡,木模板直线部分板厚不宜小于(?),每(?)设1处支撑装置;弯道
部分板厚宜为(?),每(?)设1处支撑装置,模板与混凝土接触面及模板顶面应刨光。5.模板安装应符合:支模前应核对(?)
、(?)、(?)和构造物位置;模板应安装(?)、(?)、(?),(?),相邻模板连接应紧密平顺,不得错位;严禁在基层上挖槽嵌入
模板;使用轨道摊铺机应采用专用钢制轨模;模板安装完毕,应进行检验,合格后方可使用;模板安装检验合格后表面应涂(?)或(?),接
头应粘贴(?)或(?)等密封。第12页?共123页摊铺面层分两次摊铺时,上层混凝土的摊铺应在下层混凝土初凝前完
成,且下层厚度宜为总厚的3/5。人工摊铺三辊轴机组摊铺轨道摊铺机摊铺采用前进振动、后退静滚方式作业;最佳滚压遍数应经过试验段确定
。最小摊铺宽度不宜小于3.75m;面板厚度超过150mm、坍落度小于30mm时,必须插入振捣。6.普通混凝土路面的胀缝应
设置胀缝补强钢筋支架、胀缝板和传力杆。胀缝应与路面中心线(?);缝壁必须垂直;缝宽必须一致,缝中不得连浆。缝上部灌填缝料,下部安
装(?)和(?)。7.缩缝应垂直板面,采用切缝机施工,宽度宜(?)。切缝深度:设传力杆时,不应小于面层厚度的(?),且
不得小于(?);不设传力杆时,不应小于面层厚度的(?),且不应小于(?)。当混凝土达到设计强度(?)时,采用切缝机进行切
割。8.混凝土板养护期满后,缝槽应及时填缝。填缝料的充实度根据施工季节而定,常温施工与路面平,冬期施工宜略(?)板面。9.
混凝土浇筑完成后应及时进行养护,可采取(?)或(?)等方式;在雨天或养护用水足的情况下,可采用(?)、(?)、(?)、(?)
、(?)等覆盖物洒水湿养护方式,不宜使用(?);昼夜温差大于10℃以上的地区或日均温度低于5℃施工的混凝土板应采用(?)
措施。养护时间应根据混凝土弯拉强度增长情况而定,不宜小于设计弯拉强度的(?),一般宜为(?)。应特别注重前7d的保湿(
温)养护。10.在混凝土达到设计弯拉强度(?)以后,可允许行人通过。在面层混凝土(?)完成前,不得开放交通。1K41
1044城镇道路大修维护技术要点1.填补旧沥青路面,凹坑应按高程控制、分层摊铺,每层最大厚度不宜超过(?)。2.对旧水泥混凝
土路面层的胀缝、缩缝、裂缝应清理干净,并应采取防(?)措施。3.在沥青混凝土加铺层与旧水泥混凝土路面之间设置(?),具有延缓
和抑制反射裂缝产生的效果。第13页?共123页4.采用(?)预防反射裂缝的方法。5.基底处理方法有两种:一种是
(?);另一种是(???),即(?)。1K411045路面改造施工技术1.在改造设计时,需要对原路面进行调查,调查一般采
用(?)、(?)或者(?)等手段。2.修补范围内的剔凿深度依据水泥混凝土路面的破损程度确定,为保证修补质量,剔除深度50
mm以上。基面清理后可涂刷界面剂增加(?)并采用不低于原道路混凝土强度的(?)混凝土进行灌注。3.原有水泥混凝土路面作
为道路基层加铺沥青混凝土面层时,应注意原有雨水管以及检查井的(?)和(?),为配合沥青混凝土加铺应将检查井高程进行调整。4.
新铺道路沥青混凝土路面要根据原路面调查结果综合考虑(?)、(?)、(?)等要求进行结构设计,整体加铺一层或二层沥青混凝土。在
加铺前可以采用洒布沥青粘层油摊铺土工布等柔性材料的方式对旧路面进行处理。1K420090城镇道路工程质量检查与验收1K42009
1无机结合料稳定基层施工质量检查与验收石灰稳定土基层1.碾压时压实厚度与碾压机具相适应,含水率宜在(?)的允许偏差范围内,
以满足压实度的要求。2.严禁用薄层贴补的办法找平。3.石灰土应湿养,养护期不宜少于(?)。养护期应封闭交通。4.水泥稳定土
基层应采用初凝时间大于(?),终凝时间不小于(?)的42.5级普通硅酸盐水泥、32.5级及以上矿渣硅酸盐水泥、火山灰硅酸
盐水泥。石灰、粉煤灰稳定砂砾基层5.应在潮湿状态下养护,养护期视季节而定,常温下不宜少于(?)。采用洒水养护时,应及时洒水,保
持混合料湿润。6.采用喷洒沥青乳液养护时,应及时在乳液面撒嵌丁料。7.石灰稳定土、水泥稳定土、石灰粉煤灰稳定砂砾等无机结合料稳
定基层质量检验项目主要有:(?)、(?)等。第14页?共123页1K420093水泥混凝土面层施工质量检查与验收1
.水泥应有出厂合格证(含化学成分、物理指标),并经复验合格,方可使用。不同等级、厂牌、品种、出厂日期的水泥不得混存、混用。
出厂期超过(?)或受潮的水泥,必须经过试验,合格后方可使用。2.(?)不得直接用于混凝土面层。3.钢筋的品种、规格、成分,
应符合设计和现行国家标准规定,具有生产厂的牌号、炉号,检验报告和合格证,并经(?)(含见证取样)合格。4.传力杆(拉杆)、
滑动套材质、规格应符合规定。胀缝板宜用厚(?),水稳定性好,具有一定柔性的板材制作,且应经防腐处理。填缝材料宜用(?)类、(?
)类、聚氯乙烯胶泥类、改性沥青类填缝材料,并宜加入耐老化剂。1K420094冬、雨期施工质量保证措施1.雨期施工基本要求(1
)加强与气象部门联系,掌握天气预报,安排在不下雨时施工。(2)调整施工步序,集中力量分段施工。(3)做好防雨准备,在料场和搅
拌站(?),或施工现场搭可移动的罩棚。(4)建立完善的排水系统,防排结合;并加强巡视,发现积水、挡水处,及时疏通。(5)道路
工程如有损坏,及时修复。2.挖方地段要留好横坡,做好(?)。坚持当天挖完、压完,不留后患。因雨翻浆地段,要换料重做。3.填方
地段施工,应留(?)的横坡整平压实,以防积水。4.对稳定类材料基层,应坚持(?)、(?)、(?)、(?)。5.沥青面层不
允许在下雨或下层潮湿时施工。雨期应缩短施工工期,加强施工现场与气象部门与沥青拌合厂联系,做到及时摊铺、及时完成碾压。沥青混合料运输
车辆应有防雨措施。6.水泥混凝土面层施工前应准备好防雨棚等防雨设施。施工中遇雨时,应立即使用防雨设施完成对已铺筑混凝土的振实成型
,不应再开新作业段,并应采用覆盖等措施保护尚未硬化的混凝土面层。7.城镇快速路、主干路的沥青混合料面层(?)冬期施工。次干路
及其以下道路在施工温度低于(?)时,应停止施工。当风力在(?)及以上时,沥青混合料面层不应施工。8.(?)、(?)、(?)
严禁冬期施工。第15页?共123页1K420095压实度的检测方法与评定标准压实度的测定1.路基、基层:(?)、
(?)2.沥青路面:(?)检测、核子密度仪第16页?共123页1K412000城市桥梁工程1K412010城市
桥梁结构形式及通用施工技术1K412011城市桥梁结构组成与类型1.支座系统:在桥跨结构与桥墩或桥台的支承处所设置的(?)。
它不仅要传递很大的荷载,并且还要保证桥跨结构能产生一定的变位。2.附属设施:包括桥面系(桥面铺装、防水排水系统、栏杆或防撞栏
杆以及灯光照明等)、(?)、(?)和(?)等。3.(?):防止路桥交接处的沉降,在桥台和填土之间,车辆行驶有一个缓冲作用。
4.(?):多孔桥梁中各孔净跨径的总和,也称桥梁孔径。5.(?):设计洪水位、计算通航水位或(??)。6.涵洞:用来宣泄路堤下
水流的构造物。通常在建造涵洞处路堤不中断。凡是多孔跨径全长不到(?)和单孔跨径不到(?)的泄水结构物,均称为涵洞。7.(?
)是一种在竖向荷载作用下无水平反力的结构。梁内产生的(?)最大。8.(?)的主要承重结构是拱圈或拱肋。拱桥的承重结构以(?
)为主。9.(?)的主要承重结构是梁或板和立柱或竖墙整体结合在一起的刚架结构。梁和柱的连接处具有很大的刚性,在竖向荷载作用下,
梁部主要受弯,而在柱脚处也具有水平反力,其受力状态介于梁桥和拱桥之间。10.悬索桥以(?)为主要承重结构,结构自重较轻,构造
简单,受力明确,能以较小的建筑高度经济合理地修建大跨度桥。由于这种桥的结构自重轻,刚度差,在车辆动荷载和风荷载作用下有较大的变形和
振动。11.桥梁分类特大桥大桥多孔跨径总长L(m)L>1000单孔跨径L0(m)L0>1501000≥L≥10
0100>L>3030≥L≥8150≥L0≥4040>L0≥2020>L0≥5中桥小桥第
17页?共123页1K412012模板、支架和拱架的设计、制作、安装与拆除1.荷载组合模板构件名称计算强度用①?+②
?+③?+④?+⑦?+⑧?④?+⑤?验算刚度用①?+②?+⑦?+⑧?⑤?梁、板和拱的底模及支承板、拱架、支架等缘石
、人行道、栏杆、柱、梁板、拱等的侧模板基础、墩台等厚大建筑物的侧模板⑤?+⑥?⑤?①?模板、拱架和支架自重;②?新浇筑混凝土、钢
筋混凝土或圬工、砌体的自重力;③?施工人员及施工材料机具等行走运输或堆放的荷载;④?振捣混凝土时的荷载;⑤?新浇筑混凝土对侧面模板
的压力;⑥?倾倒混凝土时产生的水平向冲击荷载;⑦?设于水中的支架所承受的水流压力、波浪力、流冰压力、船只及其他漂浮物的撞击力;⑧?
其他可能产生的荷载,如风雪荷载、冬期施工保温设施荷载等。2.支架立柱必须落在有足够承载力的地基上,立柱底端必须放置(?)或混
凝土垫块。支架地基(?),冬期施工必须采取防止冻胀的措施。3.支架通行孔的两边应加(?)、限高架及安全警示标志,夜间应设(
?)。施工中易受漂流物冲撞的河中支架应设牢固的防护设施。4.施工的脚手架、便桥须设立独立的支撑体系,不得与支架或拱架共用同一支撑
结构。5.非承重侧模应在混凝土强度能保证结构棱角不损坏时方可拆除,混凝土强度宜为(?)及以上。6.芯模和预留孔道内模应在混凝
土抗压强度能保证结构表面(?)时,方可拔出。序号构件类型构件跨度L(m)≤2达到设计的混凝土立方体抗压强度标准值的百分率(%
)≥501板2<L≤8>8≥75≥100第18页?共123页≤8>8—≥75≥100≥100
23梁、拱、壳悬臂构件7.模板、支架和拱架拆除应遵循(?)、(?)的原则。支架和拱架应按几个循环卸落,卸落量宜由小渐大。每一
循环中,在(?)、在(?)均衡卸落。简支梁、连续梁结构的模板应从(?)依次循环卸落;悬臂梁结构的模板宜从(?)开始顺序
卸落。8.预应力混凝土结构的侧模应在预应力(?)拆除;底模应在结构建立(?)后拆除。1K412013钢筋施工技术1.钢
筋应按不同(?)、(?)、(?)、(?)及生产厂家分批验收,确认合格后方可使用。2.钢筋在运输、储存、加工过程中应防止锈蚀、
污染和变形。在工地存放时应按不同品种、规格、分批分别堆置整齐,不得混杂,并应设立识别标志,存放时间宜不超过(?)个月;存放场地应
有防、排水设施,且钢筋不得直接置于地面,应垫高或堆置在台座上,顶部采用合适的材料覆盖,防水浸、雨淋。3.钢筋的级别、种类和直径应
按设计要求采用。当需要代换时,应由(?)作变更设计。4.预制构件的吊环必须采用(?)制作,不得以其他钢筋替代,且其使用时的
计算拉应力应不大于(?)。5.钢筋弯制前应先调直。钢筋宜优先选用(?)方法调直。当采用冷拉法进行调直时,HPB300钢筋
冷拉率宜不大于(?);HRB400钢筋冷拉率宜不大于(?)。6.钢筋下料前,应核对钢筋品种、规格、等级及加工数量,并应根据
(?)和(?)配料;下料后应按种类和使用部位分别挂牌标明。7.箍筋末端弯钩形式应符合设计要求或规范规定。箍筋弯钩的弯曲直径
应大于被箍主钢筋的直径。且HPB300不得小于箍筋直径的(?)倍,HRB400不得小于箍筋直径的(?)倍;弯钩平直部分
的长度,一般结构不宜小于箍筋直径的(?)倍,有抗震要求的结构不得小于箍筋直径的(?)倍。8.钢筋宜在常温状态下弯制,不宜
加热。钢筋宜从(?)弯制,弯钩应一次弯成。第19页?共123页9.钢筋接头宜采用(?)接头或(?)接头。
10.焊接接头应优先选择(?)。11.当普通混凝土中钢筋直径等于或小于(?),在无焊接条件时,可采用(?)连接,但受拉构
件中的主钢筋不得采用(?)连接。12.钢筋骨架和钢筋网片的交叉点焊接宜采用(?)。13.钢筋与钢板的T形连接,宜采用
(?)或(?)。14.钢筋接头设置应符合下列规定:(1)在同一根钢筋上宜少设接头。(2)钢筋接头应设在受力较小区段,不
宜位于构件的(?)。(3)在任一焊接或绑扎接头长度区段内,同一根钢筋(?)有两个接头。(5)施工中钢筋受力分不清受拉、受
压的,按(?)处理。(6)钢筋接头部位横向净距不得小于钢筋直径,且不得小于(?)。(7)钢筋机械连接接头,在混凝土结构中
要求充分发挥钢筋强度或对延性要求高的部位应选用Ⅱ级或Ⅰ级接头;当在同一连接区段内钢筋接头面积百分率为100%时,应选用(?)
接头。15.钢筋的混凝土保护层厚度,必须符合设计要求。设计无要求时应符合下列规定:(1)普通钢筋和预应力直线形钢筋的最小混凝土
保护层厚度不得小于钢筋公称直径,后张法构件预应力直线形钢筋不得小于其管道直径的(?)。(2)当受拉区主筋的混凝土保护层厚度大于
(?)时,应在保护层内设置直径不小于(?)、间距不大于(?)的钢筋网。(3)钢筋机械连接件的最小保护层厚度不得小于(
?)。(4)应在钢筋与模板之间设置(?),确保钢筋的混凝土保护层厚度,垫块应与钢筋绑扎牢固、错开布置。(5)混凝土浇筑前,应
对垫块的位置、数量和紧固程度进行检查。1K412014混凝土施工技术1.在进行混凝土强度试配和质量评定时,混凝土的抗压强度应以
边长为(?)的立方体标准试件测定。2.对C60及以上的高强度混凝土,当混凝土方量较少时,宜留取不少于(?)组的试件,
采用(?)的统计方法评定混凝土强度。3.配制高强度混凝土的矿物掺合料可选用优质粉煤灰、(?)、(?)和磨细天然沸石粉。第2
0页?共123页4.混凝土的施工包括原材料的计量,混凝土的(?)、(?)、(?)和混凝土养护等内容。5.混凝土拌
合物的坍落度应在(?)和(?)分别随机取样检测。每一工作班或每一单元结构物不应少于(?)。评定时应以(?)的测值为准
。如混凝土拌合物从搅拌机出料起到浇筑入模时间不超过(?),其坍落度可仅在(?)检测。在检测坍落度时,还应观察混凝土拌合物的(
?)和(?)。6.混凝土的运输能力应满足混凝土(?)和(?)的要求,使浇筑工作不间断。7.混凝土拌合物在运输过程中
,应保持均匀性,不产生分层、离析等现象,如出现分层、离析现象,则应对混凝土拌合物进行(?)。8.(?)在运输过程中向混凝土拌合
物中加水。9.预拌混凝土从搅拌机卸入搅拌运输车至卸料时的运输时间不宜大于(?),如需延长运送时间,则应采取相应的有效技术措施,
并应通过试验验证。10.浇筑前:应检查模板、支架的承载力(强度)、(?)、(?);检查钢筋及(?)的位置、规格,做好记
录,符合设计要求后方可浇筑;制定浇筑方案。11.振捣密实标准:(?);(?);(?)。12.洒水养护的时间,采用硅酸盐水泥、普
通硅酸盐水泥或矿渣硅酸盐水泥的混凝土,不得少于(?)。掺用缓凝型外加剂或有抗渗等要求以及高强度混凝土,不少于(?)。使用真空吸
水的混凝土,可在保证强度条件下适当缩短养护时间。采用(?)养护剂养护时,养护剂应通过试验确定,并应制定操作工艺。采用塑料膜覆盖
养护时,应在混凝土浇筑完成后及时覆盖严密,保证膜内有足够的凝结水。1K412015预应力混凝土施工技术1.预应力筋采用应力控制
方法张拉时,应以(?)进行校核。实际伸长值与理论伸长值的差值应符合设计要求;设计无要求时实际伸长值与理论伸长值之差应控制在(?
)以内。否则应暂停张拉,待查明原因并采取措施后,方可继续张拉。2.张拉台座应具有足够的(?)和(?),其抗倾覆安全系数不
得小于1.5,抗滑移安全系数不得小于1.3。张拉横梁应有足够的刚度,受力后的最大挠度不得大于(?)。锚板受力中心应与预应力筋合
力中心一致。3.预应力筋连同(?)应在钢筋骨架完成后一并穿入就位。就位后,严禁使用(?)对梁体钢筋及模板进行切割或焊接。隔
离套管内端应堵严。4.放张预应力筋时混凝土强度必须符合设计要求,设计未要求时不得低于设计混凝第21页?共123页土强
度等级值的(?)。放张顺序应符合设计要求,设计未要求时,应(?)、(?)、(?)地放张。放张前,应将限制位移的模板拆除。后张法
预应力施工5.管道应留(?)与(?);曲线孔道的波峰部位应留(?);在最低部位宜留(?)。6.穿束后至孔道灌浆完成应
控制在下列时间以内,否则应对预应力筋采取防锈措施:空气温度大于70%或盐分过大时,(?);空气温度40%-70%时,(?)
;空气温度小于40%时,(?)。7.混凝土强度应符合设计要求,设计未要求时,不得低于强度设计值的(?);且应将限制位移的模
板拆除后,方可进行张拉。8.曲线预应力筋或长度大于等于(?)的直线预应力筋,宜在(?)张拉;长度小于(?)的直线预应
力筋,可在一端张拉。当同一截面中有多束一端张拉的预应力筋时,张拉端宜均匀交错地设置在结构的两端。9.预应力筋的张拉顺序应符合设计
要求。当设计无要求时,可采取分批、分阶段(?)。宜(?),(?)。孔道压浆10.预应力筋张拉后,应及时进行(?),多跨连续
有连接器的预应力筋孔道,应张拉完一段灌注一段。孔道压浆宜采用(?)。水泥浆的强度应符合设计要求,设计无要求时不得低于(?)。1
1.压浆过程中及压浆后(?)内,结构混凝土的温度不得低于(?),否则应采取(?)措施。当白天气温高于(?)时,压浆
宜在夜间进行。12.埋设在结构内的锚具,压浆后应及时浇筑封锚混凝土。封锚混凝土的强度等级应符合设计要求,不宜低于结构混凝土强度等
级的(?),且不低于(?)。13.孔道内的水泥浆强度达到设计要求后方可吊移预制构件;设计未要求时,应不低于砂浆设计强度的(
?)。14.预应力混凝土应优先采用硅酸盐水泥、普通硅酸盐水泥,(?)使用矿渣硅酸盐水泥,(?)使用火山灰质硅酸盐水泥及粉煤灰
硅酸盐水泥。粗骨料应采用碎石,其粒径宜为5-25mm。15.混凝土中(?)使用含氯化物的外加剂及引气剂或引气型减水剂。16
.从各种材料引入混凝土中的(?????????)最大含量不宜超过水泥用量的0.06%。超过0.06%
时,宜采取(?)、(?)、(?)等防锈措施。第22页?共123页17.对先张构件应避免振动器碰撞(?),对后张
构件应避免振动器碰撞(?)。18.存放的仓库应干燥、防潮、通风良好、无腐蚀气体和介质。存放在室外时不得直接堆放在地面上,必须垫高
、覆盖、防腐蚀、防雨露,时间不宜超过(?)个月。19.预应力筋宜使用(?)或(?)切断,不得采用(?)切割。20
.锚垫板与预应力筋(或孔道)在锚固区及其附近应相互垂直。后张构件锚垫板上宜设(?)。1K412016桥面防水系统施工
技术1.基层混凝土强度应达到设计强度的(?)以上,方可进行防水层施工。2.卷材防水层铺设前应先做好(?)、(?)、(?)
等部位的局部处理,然后再进行大面积铺设。3.当下雨、下雪和风力≥(?)时,严禁防水层施工。当施工中途下雨时,应做好已铺卷材
周边的防护工作。4.铺设防水卷材时,任何区域的卷材不得多于(?),搭接接头应错开(?)以上,严禁沿道路宽度方向搭接形成通缝
。5.铺设防水卷材应平整顺直,搭接尺寸应准确,不得扭曲、皱褶。卷材的(?)应与车辆的(?)一致,卷材应采用沿桥梁纵、横坡从
(?)的铺设方法,(?)卷材应压在(?)卷材之上。6.涂料防水层内设置的(?),应(?)铺贴。铺贴顺序应自(?
)处开始向(?)铺贴并顺桥宽方向搭接,高处胎体增强材料应压在低处胎体增强材料之上。7.防水层上沥青混凝土的摊铺温度应与防水
层材料的耐热度相匹配。卷材防水层上沥青混凝土的摊铺温度应高于防水卷材的耐热度(?),但同时应小于(?);涂料防水层上沥青混凝土
的摊铺温度应低于防水涂料的耐热度(?)。8.混凝土基层检测主控项目是(?)、(?)、(?)。9.混凝土基层检测一般项目是
(?)。10.防水层施工现场检测主控项目为(?)和(?)。11.防水层施工现场检测一般项目为(?)。12.特大桥、桥
梁坡度大于(?)等对防水层有特殊要求的桥梁可选择进行防水层与沥青混凝土层(?)、(?)检测。第23页?共123页
1K412017桥梁支座、伸缩装置安装技术1.桥梁支座是连接桥梁上部结构和下部结构的重要结构部件,位于梁体和垫石之间,它能将
桥梁上部结构承受的荷载和变形(位移和转角)可靠地传递给桥梁下部结构,是桥梁的重要(?)。2.按支座所用材料分类:(?)
、聚四氟乙烯(滑动支座)、橡胶(板式、盆式)等。3.按支座的结构形式分类:弧形支座、摇轴支座、(?)、(?)、球形
钢支座、(?)等。4.支座安装(?)和(?)必须正确,不得偏斜、脱空、不均匀受力。5.墩台帽、盖梁上的支座垫石和挡块
宜(?),确保其高程和位置的准确。垫石混凝土的强度必须符合设计要求。6.桥面伸缩装置,应满足梁端自由伸缩、转角变形及使车辆通过
的要求。要能防止雨水和垃圾泥土渗入阻塞;安装、检查、养护、消除污物都要简易方便。在设置(?)处,栏杆与桥面铺装都要断开。7.伸
缩装置应具有可靠的防水、排水系统,防水性能应符合注满水(?)无渗漏的要求。8.伸缩装置不得露天堆放,存放场所应干燥通风,产品
应远离热源(?)以外,不得与地面直接接触,存放应整齐、保持清洁,严禁与酸、碱、油类、有机溶剂等接触。9.伸缩装置中心线与桥梁
中心线(?),伸缩装置顺桥向应对称放置,沿桥面横坡方向测量水平标高,并用水平尺或板尺定位,顶面标高满足要求。将伸缩装置的锚固钢筋
与桥梁预埋钢筋焊接牢固。1K412018桥梁维护与改造施工技术桥梁的养护保养小修中修工程对管辖范围内的城市桥梁进行日常维护和小修
作业。对城市桥梁的一般性损坏进行修理,恢复原有技术水平和标准的工程。对城市桥梁的较大的损坏进行综合治理,全面恢复到原有技术水平和标
准的工程及对桥梁结构维修改造的。大修工程加固工程对桥梁结构采取补强、修复、调整内力等措施,从而结构承载力及设计要求的工程。不适应现
有的交通量、载重量增长的需要,需提高技术等级标注,显著提高其运行能力的工程。改扩建工程第24页?共123页新、旧桥梁的
上部与下部互不连接优点:新、旧桥结构实际上是各自受力、互不影响;而新拓宽桥梁的设计、施工也较为独立、简单。缺点:导致连接部位桥面铺
装破坏,形成纵向裂缝和横向错台,影响行车舒适性、安全性和桥面外观,增加后期的养护维修费用。新、旧桥梁的上部和下部相互连接:将加宽桥
梁的上部结构与原桥对应部位沿横向通过植筋(抗拔试验)、加设钢筋骨架,然后浇筑湿接缝连接起来。优点:将加宽桥、原桥连成整体,拼
接后桥梁整体性较好。缺点:可能会使下部构造帽梁、系梁、桥台连接处产生裂缝;上部构造连接处也可能产生裂缝,导致使用功能下降,维修困难
,外观不雅。此外,下部构造需采用植筋连接技术,工程成本高。1K412020城市桥梁下部结构施工1K412021各类围堰施工要求
1.围堰高度应高出施工期间可能出现的最高水位(包括浪高)(?)。2.堆码土袋,应自(?)合龙。上下层和内外层的土袋均
应相互错缝,尽量堆码密实、平稳。钢板桩围堰施工要求3.有大漂石及坚硬岩石的河床不宜使用(?)围堰。4.施打前,应对钢板桩的
锁口用(?)捻缝,以防漏水。施打顺序一般从(?)。5.钢板桩可用捶击、振动、射水等方法下沉,但在黏土中不宜使用(?)办法
。双壁钢围堰施工要求6.双壁钢围堰应作专门设计,其(?)、(?)、(?)、锚锭系统及使用期等应满足施工要求。拼焊后应进行(?
)及(?)。1K412022桩基础施工方法与设备选择沉入桩基础1.常用的沉入桩有钢筋混凝土桩、预应力混凝土桩和(?)。2
.(?)宜用于砂类土、黏性土。桩锤的选用应根据地质条件、桩型、桩的密集程度、单桩竖向承载力及现有施工条件等因素确定。3.在黏性
土中应慎用(?);在重要建筑物附近不宜采用(?)。第25页?共123页4.贯入度应通过(?)或做(?)后
会同(?)及(?)单位研究确定。5.预制桩的接桩可采用(?)、(?)连接或(?)连接,接桩材料工艺应符合规范要求
。6.沉桩顺序:对于密集桩群,自(?)施打;根据基础的设计标高,宜(?);根据桩的规格,宜(?),(?)。7.桩终止锤
击的控制应视桩端土质而定,一般情况下以控制(?)为主,(?)为辅。8.沉桩过程中发现以下情况应暂停施工,并应采取措施进行处
理:(?);桩身发生突然倾斜、位移或有严重回弹;桩头或桩身破坏;(?);(?)。钻孔灌注桩基础8.依据成桩方式可分为(?)、(
?)、(?)及(?)。9.泥浆的作用:(?)、(?)、(?)、(?)。10.泥浆制备根据施工机具、工艺及穿越土层情况进行配合
比设计,宜选用(?)或(?)。11.护筒顶面宜高出施工水位或地下水位(?),并宜高出施工地面(?)。其高度尚应满足孔内泥
浆面高度的要求。12.灌注混凝土前,清孔后的泥浆相对密度应小于(?);含砂率不得大于(?);(?)不得大于20Pa·S。1
3.钻孔达到设计深度,灌注混凝土之前,孔底沉渣厚度应符合设计要求。设计未要求时端承型桩的沉渣厚度不应大于(?);摩擦型桩的沉渣厚
度不应大于(?)。14.每钻进(?)应验孔一次,在更换钻头前或容易缩孔处,均应验孔并应做记录。15.旋挖钻机成孔应用(
?),并根据钻进速度同步补充泥浆,保持所需泥浆面高度不变。16.人工挖孔桩的孔径(不含孔壁)不得小于0.8m,且不宜大
于(?);挖孔深度不宜超过(?)。17.采用混凝土或钢筋混凝土支护孔壁技术,(?)、(?)、(?)、混凝土强度等级均应符合设
计要求;上下节护壁混凝土的搭接长度不得小于(?);每节护壁必须保证振捣密实,并应当日施工完毕;应根据土层渗水情况使用(?);护壁模
板的拆除应在灌注混凝土(?)之后,强度大于(?)以上后拆除。第26页?共123页18.灌注桩各工序应连续施工
,钢筋笼放入泥浆后(?)内必须浇筑混凝土。19.桩顶混凝土浇筑完成后应高出设计标高(?),确保桩头浮浆层凿除后桩基面混凝土
达到设计强度。20.当气温低于0℃以下时,浇筑混凝土应采取保温措施,浇筑时混凝土的温度不得低于5℃。当气温高于(?)时,
应根据具体情况对混凝土采取(?)措施。21.混凝土配合比应通过试验确定,须具备良好的(?),坍落度宜为(?)。22.导管
不得漏水,使用前应(?)、(?),试压的压力宜为孔底静水压力的(?)倍。23.开始灌注混凝土时,导管底部至孔底的距离宜为
(?);导管首次埋入混凝土灌注面以下不应少于(?);在灌注过程中,导管埋入混凝土深度宜为(?)。24.灌注水下混凝土必须(?
)施工,中途停顿时间不宜大于(?),并应控制提拔导管速度,(?)将导管提出混凝土灌注面。灌注过程中的故障应记录备案。1K41
2023墩台、盖梁施工技术1.墩台混凝土宜水平分层浇筑,每层高度宜为(?)。2.墩台混凝土分块浇筑时,接缝应与墩台(?)
的一边平行,邻层分块接缝应错开,接缝宜做成(?)。分块数量,墩台水平截面积在200㎡内不得超过(?);在300㎡以内不
得超过(?)。每块面积不得小于(?)。3.柱身高度内有系梁连接时,系梁应与柱(?)。V型墩柱混凝土应(?)。4.在城镇
交通繁华路段施工盖梁时,宜采用(?)、(?),以减少占路时间。5.盖梁为悬臂梁时,混凝土浇筑应从(?)开始;预应力钢筋混凝
土盖梁拆除底模时间应符合设计要求;如设计无要求,孔道压浆强度应达到设计强度后,方可拆除底模板。6.预制柱安装就位后应采用(?)
或(?),并加斜撑保持柱体稳定,在确保稳定后方可摘去吊钩。7.安装后应及时浇筑杯口混凝土,待混凝土硬化后拆除硬楔,浇筑二次混
凝土,待杯口混凝土达到设计强度(?)后方可拆除斜撑。8.墩台砌体应采用(?)分层砌筑,竖缝均应错开,不得贯通。第27
页?共123页9.砌筑墩台镶面石应从(?)或(?)开始。1K412030城市桥梁上部结构施工1K412031
装配式梁(板)施工技术1.依照吊装机具不同,梁板架设方法分为起重机架梁法、跨墩龙门吊架梁法和穿巷式架桥机架梁法。2.预
制台座的间距应能满足施工作业要求;台座表面应光滑、平整,在2m长度上平整度的允许偏差应不超过(?),且应保证底座或底模的挠度
不大于(?)。3.当后张预应力混凝土梁预计的拱度值较大时,可考虑在预制台座上设置(?)。4.腹板底部为扩大断面的T形梁
,应先浇筑扩大部分并振实后,再浇筑其上部腹板。5.U形梁可上下一次浇筑或分两次浇筑。一次浇筑时,先浇筑底板,待底板混凝土稍沉实后
再浇筑腹板;两次浇筑时,先浇筑底板至底板承托顶面,按施工缝处理后,再浇筑腹板混凝土。6.采用(?)支立模板、浇筑构件混凝土时
,下层构件顶面应设(?);上层构件须待下层构件混凝土强度达到(?)后方可浇筑。7.对高宽比较大的预应力混凝土(?)和
(?),应对称、均衡地施加预应力,并应采取有效措施防止梁体产生侧向弯曲。8.构件在脱底模、移运、吊装时,混凝土的强度不得低于设计
强度的(?),后张预应力构件孔道压浆强度应符合设计要求或不低于设计强度的(?)。9.存放台座应坚固稳定,且宜高出地面(?)
以上。10.构件按安装先后顺序编号存放,预应力混凝土梁、板的存放时间不宜超过(?),特殊情况下不应超过(?)。11.当构
件多层叠放时,层与层之间应以(?)隔开,各层垫木的位置应设在设计规定的支点处,上下层垫木应在同一条竖直线上;叠放高度宜按构件强
度、台座地基承载力、垫木强度以及堆垛的稳定性等经计算确定。大型构件宜为(?),不应超过(?);小型构件宜为(?)。12.梁长
25m以上的预应力简支梁应验算(?)。13.装配式桥梁构件在脱底模、移运、堆放和吊装就位时,混凝土的强度不应低于设计要求的
吊装强度,设计无要求时一般不应低于设计强度的(?)。预应力混凝土构件吊装时,其孔道水泥浆的强度不应低于构件设计要求。如设计无要求
时,不应低于(?)。吊装前应验收合格。第28页?共123页14.安装在同一孔跨的梁、板,其预制施工的龄期差不宜超过
(?)。梁、板上有预留孔洞的,其中心应在同一轴线上,偏差应不大于(?)。梁、板之间的(?),应在一孔梁、板全部安装完成后方可进
行施工。15.施工程序应符合设计规定,应在(?)全部安装完成后再浇筑湿接头混凝土。16.湿接头的混凝土宜在一天中气温相对较
低的时段浇筑,且一联中的全部湿接头应(?)完成。湿接头混凝土的养护时间应不少于(?)。1K412032现浇预应力(钢筋
)混凝土连续梁施工技术1.各种支架和模板安装后,宜采取(?)消除拼装间隙和地基沉降等非弹性变形。2.浇筑分段工作缝,必须
设在(?)附近。3.悬臂浇筑的主要设备是一对能行走的(?)。4.悬浇梁体一般应分四大部分浇筑:(1)墩顶梁段(0号
块);(2)墩顶梁段(0号块)两侧对称悬浇梁段;(3)边孔支架现浇梁段;(4)主梁跨中合龙段。5.悬浇顺序及要求(
1)在墩顶托架或膺架上浇筑0号段并实施墩梁临时固结;(2)在0号块段上安装悬臂挂篮,向两侧依次对称分段浇筑主梁至合龙前
段;(3)在支架上浇筑边跨主梁合龙段;(4)最后浇筑中跨合龙段形成连续梁体系。6.预应力混凝土连续梁合龙顺序一般是(?)、
(?)、(?)。7.合龙段的长度宜为(?)。8.合龙宜在一天中气温(?)时进行。9.梁跨体系转换时,支座反力的调整应以
(?)为主,(?)作为校核。10.预应力混凝土连续梁,悬臂浇筑段前端底板和桥面标高的确定是连续梁施工的关键问题之一,确定悬
臂浇筑段前端标高时应考虑:(1)(?);(2)(?);(3)(?);(4)(?)。因此,施工过程中的监测项目为前三项;必要时结构物
的(?)、(?)也应进行监测,保证结构的强度和稳定。第29页?共123页1K412033钢梁制作与安装要求1.
钢梁主要杆件应在组装后(?)内焊接。2.钢梁出厂前必须进行(?),并应按设计和有关规范的要求验收。3.钢梁杆件工地焊缝连
接,按设计顺序进行。无设计顺序时,焊接顺序宜(???)、(?)。4.钢梁采用高强螺栓施拧顺序从(?)、(?)开始,由(?
),当天(?)。不得采用(?)和(?)。1K412034钢-混凝土结合梁施工技术1.钢梁预制并焊接传剪器→架设钢梁
→安装横梁(横隔梁)及小纵梁(有时不设小纵梁)→安装预制混凝土板并浇筑接缝混凝土或支搭现浇混凝土桥面板的模板并铺设
钢筋→现浇混凝土→养护→张拉预应力束→拆除临时支架或设施。2.现浇混凝土结构宜采用(?)、(?)、(?)混凝土。3.混凝土
浇筑顺序:顺桥向应自跨中开始向支点处交汇,或由一端开始浇筑;横桥向应(?)。4.施工中,应随时监测主梁和施工支架的变形及稳定。
1K412035钢筋(管)混凝土拱桥施工技术1.跨径小于16m,按拱圈全宽从(?)、(?),并在拱脚混凝土(?)
全部完成。不能完成时,则应在拱脚预留一个隔缝,最后浇筑隔缝混凝土。2.跨径大于或等于16m的拱圈或拱肋,宜(?)。各段的接
缝面应与拱轴线垂直,各分段点应预留(?),其宽度宜为(?)。当预计拱架变形较小时,可减少或不设间隔槽,应采取分段间隔浇筑。3.
间隔槽混凝土浇筑由(?)对称进行;待拱圈混凝土分段浇筑完成且强度达到(?)设计强度且接合面按施工缝处理后再进行。4.分
段浇筑钢筋混凝土拱圈时,纵向不得采用(?),钢筋接头应安设在后浇的几个间隔槽内,并应在浇筑间隔槽混凝土时焊接。5.浇筑大跨径拱
圈混凝土时,宜采用分环(层)分段方法浇筑,也可(?),(?),达到设计要求后,再(?)。6.大跨径桁式组合拱,拱顶湿
接头混凝土,宜采用较构件混凝土(?)的早强混凝土。7.拱肋节段焊接强度不应低于母材强度。所有焊缝均应进行外观检查;对接焊缝应
第30页?共123页(?)进行超声波探伤,其质量应符合设计要求和国家现行标准规定。1K420100城市桥梁工程质量
检查与验收1K420101钻孔灌注桩施工质量事故预防措施问题原因措施1.场地不平整;2.钻机安装不平整;3.不均匀沉降;4
.钻杆弯曲;1.平整、压实场地;2.检查钻机平整度;3.检查钻杆垂直度;4.定期检查钻头;钻孔垂直度不符合规范要求5.
钻头受力不均;6.钻压过高。5.低速低钻压钻进;6.必要时加设扶正器。问题原因措施1.清孔方法不当;1.选择合适成桩方法
(反循环);2.控制好泥浆性能指标;3.丈量钻杆的方法。孔底沉渣过厚或灌注混凝土前孔内泥浆含砂量过大2.清孔泥浆质量差
;3.测量方法不当造成误判。问题原因措施1.混凝土配制质量差;2.导管破漏;1.严控配合比;2.导管做水压试验;3.导
管埋深符要求;4.导管底距孔底深度符要求;5.隔水栓应合格。灌注混凝土时堵管3.导管埋深过大;4.导管底距孔底深度太小;5
.隔水栓不规范。问题原因措施1.水泥质量差;1.严格把好进厂水泥的质量关;2.控制混凝土配合比;桩身混凝土强度低或混凝土离
析2.配合比控制不严;3.搅拌时间不够。3.掌握好搅拌时间和混凝土的和易性。问题原因措施1.初灌混凝土量不够;2.导管拔
出混凝土面;3.灌注时间太长;1.导管的埋置深度宜控制在2~6m之间;2.灌注时间宜控制在1.5倍混凝土初凝时桩
身混凝土夹渣或断桩间内;3.认真清孔。4.清孔时孔内泥浆悬浮的砂粒太多。第31页?共123页问题原因措施1.桩顶
混凝土灌注完成后应高出设计标高0.5-1m。桩顶混凝土不密实或强度达不到设计要求1.超灌高度不够;2.混凝土浮浆太多;3.
孔内混凝土面测定不准。2.大体积混凝土的桩,桩顶10m内的混凝土,调整配合比,增大碎石含量。3.硬杆筒式取样。1K4201
02大体积混凝土浇筑施工质量检查与验收1.大体积混凝土出现的裂缝按深度不同,分为(?)、(?)和(?)三种:2.裂缝发
生原因:(?);(?);(?);(?);(?)。3.坍落度不宜过大,不宜大于(?)。4.混凝土浇筑层厚度应根据所用振捣器作用
深度及混凝土的和易性确定,整体连续浇筑时宜为(?),振捣时应避免过振和漏振。5.养护措施内部降温法:内部预埋水管,通冷却水,降
低温度。保温法:覆盖保温材料(如草袋、锯末、湿砂等)。1K420103预应力张拉施工质量事故预防措施1.张拉设备和压力表
的检定期限不得超过(?),且不得超过(?)次张拉作业。2.张拉设备和压力表应配套检定,配套使用。3.张拉施工质量控制应做
到“六不张拉”,即:(?);(?);(?);(?);(?);(?),不张拉。1K420104钢管混凝土浇筑施工质量检查与验收1.
钢管(钢管柱和钢管拱)内(?)是验收主控项目。2.检验方法:观察出浆孔混凝土溢出情况,检查(?),检查第32
页?共123页(?)。3.钢管混凝土应具有(?)、(?)、(?)、(?)和(?)的性能。4.钢管混凝土的质量检测
应以(?)为主,(?)为辅。1K412036斜拉桥施工技术1.施工过程中,必须对主梁各个施工阶段的(?)、(?)、(?
)以及(?)等进行监测。1K412040管涵和箱涵施工1K412041管涵施工技术1.管节断面形式分为(?)、(?)、
(?)、(?)等。2.管涵的沉降缝应设在(?)。3.遇有地下水时,应先将地下水降至基底以下(?)方可施工,且降水应连续
进行直至工程完成到地下水位(?)以上且具有抗浮及防渗漏能力方可停止降水。4.涵洞两侧的回填土,应在主结构防水层的(?)完
成,且保护层砌筑砂浆强度达到(?)后方可进行。回填时,两侧应(?),高差不宜超过(?)。5.现浇钢筋混凝土涵洞,其胸腔回
填土宜在混凝土强度达到设计强度(?)后进行,顶板以上填土应在达到设计强度后进行。1K412042箱涵顶进施工技术1.工艺流
程:现场调查→工程降水→工作坑开挖→后背制作→滑板制作→铺设润滑隔离层→箱涵制作→顶进设备安装→既有线加固→箱涵试顶进→吃土顶进→
监控量测→箱体就位→拆除加固设施→拆除后背及顶进设备→工作坑恢复。2.根据箱涵的净空尺寸、土质情况,可采取人工挖土或机械挖土。一
般宜选用小型反铲按设计坡度开挖,每次开挖进尺(?),配装载机或直接用挖掘机装汽车出土。挖土顶进应三班连续作业,不得间断。3.两
侧应欠挖(?),钢刃脚切土顶进。4.挖土工作应与观测人员密切配合,随时根据箱涵顶进(?)和(?),采取纠偏措施。5.挖
运土方与顶进作业(?)进行。第33页?共123页6.箱涵身每前进一顶程,应观测(?)和(?),发现偏差及时
纠正。1K420160城市桥梁工程施工安全事故预防1K420161桩基施工安全措施1.沉入桩施工安全控制主要包括(?)、(
?)与堆放和(?)。2.混凝土灌注桩施工安全控制涉及(?)、(?)、(?)、(?)、(?)和混凝土浇筑。3.吊环必须采用
(?)钢筋制作,严禁以其他钢筋代替。4.钢筋码放应符合施工平面布置图的要求。码放时,应采取防止锈蚀和污染的措施,不得损坏标牌;
整捆码垛高度不宜超过(?),散捆码垛高度不宜超过(?)。5.加工成型的钢筋笼、钢筋网和钢筋骨架等应水平放置。码放高度不得超过
(?),码放层数不宜超过(?)。6.气割加工现场必须按消防部门的规定配置消防器材,周围(?)范围内不得堆放易燃易爆物品。
操作者必须经专业培训,持证上岗。7.预制混凝土桩起吊时的强度应符合设计要求,设计无要求时,混凝土应不小于设计强度的(?)。8.
桩的堆放场地应平整、坚实、不积水。混凝土桩支点应与吊点在一条竖直线上,堆放时应上下对准,堆放层数不宜超过(?)。钢桩堆放支点应
布置合理,防止变形,并应采取防滚动措施,堆放层数不得超过(?)。9.浇筑水下混凝土漏斗的设置高度应依据(?)、(?)、(?)
等确定。10.桩孔开挖深度超过(?)时,应有专门向井下送风的设备,风量不宜少于25L/s。11.孔口四周必须设置护栏,
护栏高度宜为(?);挖出的土石方应及时运离孔口,不得堆放在孔口周边(?)范围内,机动车辆的同行不得对井壁的安全造成影响。1K
420162模板支架和拱架施工安全措施1.模板支架、脚手架拆除现场应设作业区,其边界设警示标志,并由专人值守,非作业人员严禁入
内。2.模板支架、脚手架拆除应按施工方案或专项方案要求(?)进行,严禁(?)作业。1K420163箱涵顶进施工安全措施
1.小型箱涵,可采用(?),或(?)的加固法。第34页?共123页2.大型即跨径较大的箱涵,可用(?)、(
?)、(?)或(?)法。2.应按规定设立施工现场围挡,有明显的警示标志,隔离施工现场和社会活动区,实行封闭管理,严禁非施工人
员入内。3.在列车运行间隙或避开交通高峰期开挖和顶进;列车通过时,(?)挖土作业,人员应撤离开挖面。第35页?共123
页1K413000城市轨道交通工程1K413010城市轨道交通工程结构与特点1K413011地铁车站结构与施工方法1.
根据结构横断面形式可分为:(?)、(?)、(?)及其他形式(如马蹄形、椭圆形等)。2.地铁车站通常由(?)(站台、站
厅、设备用房、生活用房),(?),(?)(通风道、风亭、冷却塔等)三大部分组成。3.施工方法(工艺)与选择条件明
挖法明挖法是修建地铁车站的常用施工方法,具有施工作业面多、速度快、工期短、易保证优点缺点包括工程质量、工程造价低。对周围环境影响较
大放坡:埋深较浅、地下水位较低的城郊地段。不放坡:围护结构内开挖,场地狭窄及地下水丰富的软弱围岩地区。盖挖法1.围护结构变形小,
能够有效控制周围土体的变形和地表沉降,有利于保护邻近建筑物和构筑物;优点2.施工受外界气候影响小,基坑底部土体稳定,隆起小,施工
安全;3.尽快恢复路面,对道路交通影响较小。1.施工缝的处理较为困难;2.暗挖难度大、费用高;缺点包括3.后期开挖土方不方
便;4.作业空间小,施工速度较明挖法慢、工期长。盖挖顺作法、盖挖逆作法及盖挖半逆作法。目前,城市中施工采用最多的是盖挖逆作法。4
.针对混凝土施工缝存在的问题,可采用(?)、(?)或(?)处理。5.为保证施工缝的良好充填,一般设置“(?)”形施工缝,其
倾角以小于(?)为宜。试验证明(?)和(?)能保证结构的整体性。6.浅埋暗挖法:“十八字”方针:(?)、(?)、(?)
、(?)、(?)、(?)。7.(?)不允许带水作业。第36页?共123页8.明挖法施工的车站主要采用(?)结构
或(?)结构。9.盖挖法施工的地铁车站多采用(?)结构。10.喷锚暗挖(矿山)法施工车站结构:单拱车站隧道;双
拱车站隧道;三拱车站1K413012地铁区间隧道结构与施工方法1.常用的预加固和预支护方法有:(?)、(??)及(?)。2
.隧道土方开挖与支护总原则是:(?)、(?),(?);(?),(?);(?),(?)。3.初期支护的(?)达到基本稳定,且
防水结构施工验收合格后,可以进行二次混凝土衬砌灌注工序。1K413020明挖基坑施工1K413021地下水控制1.地下水控制
包括基坑开挖影响深度内的(?)、(?)与(?)控制,应根据工程地质和水文地质条件、基坑周边环境要求及支护结构形式选用(?
)、(?)、(?)或其组合方法。2.疏干地下水有增加坑内土体强度的作用,有利于控制基坑围护结构的变形。3.隔水帷幕宜采用(
?)形式。当采用沿基坑周边非闭合的平面布置形式时,应对地下水沿帷幕两端绕流引起的基坑周边建筑物、地下管线、地下构筑物的(?)
进行分析。4.工程降水方法可根据(?)、(?)、(?)、(?)等因素选择和设计。5.当基坑开挖不很深,基坑涌水量不大时,(
?)是应用最广泛,亦是最简单、经济的方法。明沟、集水井排水多是在基坑的两侧或四周设置排水明沟,在基坑四角或每隔(?)设置集水
井,使基坑渗出的地下水通过排水明沟汇集于集水井内,然后用水泵将其排出基坑外。6.轻型井点布置应根据基坑平面形状与大小、地质和水文
情况、(?)、(?)等而定。当基坑(槽)宽度小于(?)且降水深度不超过(?)时,可采用单排井点,布置在地下水上游
一侧;当基坑(槽)宽度大于(?)或土质不良,渗透系数较大时,宜采用双排井点,布置在基坑(槽)的两侧,当基坑面积
较大时,宜采用第37页?共123页(?)。挖土运输设备出入道可不封闭,间距可达(?),一般留在地下水下游方向。7.
轻型井点宜采用(?),井管距坑壁不应小于(?)。井点间距一般为(?)。?8.孔壁与井管之间的滤料应填充密实、均匀,宜采用(
?),滤料上方宜使用(?),封堵至地面的厚度应大于(?)。1K413022深基坑支护结构与边坡防护1.板(桩)墙有
(?)、(?)、(?)。2.支撑结构起减小围护结构变形,控制墙体弯矩的作用,分为(?)和(?)两种形式。3.钻孔灌注桩一
般采用(?)成孔。地铁明挖基坑中多采用螺旋钻机、冲击式钻机和正反循环钻机、旋挖钻等。对正反循环钻机,由于其采用的泥浆护壁成孔,
故成孔时噪声低,适于城区施工,在地铁基坑和高层建筑深基坑施工中得到广泛应用。4.钻孔灌注桩围护结构经常与(?)联合使用,止水
帷幕一般采用(?)。5.SMW工法桩(型钢水泥土搅拌墙)特点:①?强度大,止水性好;②?内插的型钢可拔出反复使用,经济性
好;③?具有较好发展前景,国内上海等城市已有工程实践;④?用于软土地层时,一般变形较大。6.水泥土挡墙的(?)无侧限抗压强度
不宜小于(?)。7.地下连续墙的特点①?(?);②?(?);③?(?);④?(?)。第38页?共123页8.地下
连续墙的一字形槽段长度宜取(?)。地下连续墙的转角处或有特殊要求时,单元槽段的平面形状可采用(?)、(?)等。9.地下连续
墙的槽段接头应按下列原则选用:①?地下连续墙宜采用圆形锁口管接头、(?)、楔形接头、(?)或混凝土预制接头等柔性接头;②?当地下
连续墙作为主体地下结构外墙,且需要形成整体墙体时,宜采用刚性接头;刚性接头可采用(?)或十字形穿孔钢板接头、(?)接头等。导
墙主要作用在挖掘地下连续墙沟槽时,地表土松软容易坍陷,因此在单元槽段挖完之前,导墙起挡土基准作用承重挡土作用。导墙作为测量地下连续
墙挖槽标高、垂直度和精度的基准。导墙既是挖槽机械轨道的支承,又是钢筋笼接头管等搁置的支点,有时还承受其他施工设备的荷载。导墙可存蓄
泥浆,稳定槽内泥浆液面。泥浆液面始终保持在导墙面以下20cm,并高出地下水位1m,以稳定槽壁。存蓄泥浆其他导墙还可防止泥浆漏失
,阻止雨水等地面水流入槽内;地下连续墙距现有建(构)筑物很近时,在施工时还起到一定的补强作用。第39页?共123
页10.内支撑有(?)、(?)、(?)及钢与混凝土的混合支撑等;外拉锚有(?)和(?)两种形式。11.支撑结构挡土
的应力传递路径是(?)。12.在深基坑的施工支护结构中,常用的支撑系统按其材料可分为(??)体系和(?)体系两类。材料特
点混凝土硬化后刚度大,变形小,强度的安全可靠性强,施工方便,但支撑浇制和养护时间长,围护结构处于无支撑体位移大,如对控制变形有较高
要求时,需对被动区软土加固。施工工期长,拆除困难,爆破拆除对周围环境有影响。现浇钢筋混凝土装、拆除施工方便,可周转使用,支撑中可加
预应力,可调整轴力而有效控制围护墙变形;施工工艺要求较高,如节点和支撑结构处理不当,或施工支撑不及时不准确,会造成失稳。钢结构13
.严格按设计坡度放坡,基坑较深时分级放坡。分级放坡时,宜设置分级过渡平台,平台宽度应根据土质条件、放坡高度及施工场地条件确定,对
于岩石边坡不宜小于(?),对于土质边坡不宜小于(?)。下级放坡坡度宜缓于上级放坡坡度。14.护坡:坡面叠放砂包或者土袋;锚杆喷
射混凝土;塑料膜或土工织物覆盖坡面。1K413023基坑(槽)土方开挖及基坑变形控制1.发生下列异常情况时,应立即停止
开挖,并应立即查清原因和及时采取措施后,方可继续施工:1)支护结构变形达到设计规定的控制值或变形速率持续增长且不收敛。2)支护
结构的内力超过其设计值或突然增大。3)围护结构或止水帷幕出现渗漏,或基坑出现流土、管涌现象。4)开挖暴露出的基底出现明显异常
(包括黏性土时强度明显偏低或砂性土层时水位过高造成开挖施工困难时)。5)围护结构发生异常声响。6)边坡出现失稳征兆时。7)
基坑周边建(构)筑物等变形过大或已经开裂。2.地铁车站的长条形基坑应遵循“(?)、(?)、(?)”的原则,兼作盾构始发
井的车站,一般从两端或一端向中间开挖,以方便端头井的盾构始发。3.基坑周围地层移动主要是由(?)和(?)造成。4.(?)
及(?)会造成(?),引起基坑第40页?共123页(?)。5.控制基坑变形主要方法有:1)(?)。2)(?)
。3)加固基坑内被动区土体。加固方法有(?)、(?)及二者结合的形式。4)减小每次开挖围护结构处土体的尺寸和开挖支撑时间。
5)通过调整围护结构深度或降水井布置来控制降水对环境变形的影响。6)加强监测。6.坑底稳定控制:(?);(?);(?);(?
)。1K413024地基加固处理方法1.基坑外加固的目的主要是(?),有时也可(??)。2.基坑内加固的目的主要有:(
?),(??),(?);(?);(??);(?)等。3.采用水泥土搅拌、高压喷射注浆、注浆或其他方法对地基掺入一定量的固化剂或
使土体固结,以提高土体的强度和土体的侧向抗力为主,适用于(?)。4.在地基处理中,注浆工艺所依据的理论主要可分为(?)、(?
)、(?)和(?)四类。第41页?共123页5.水泥土搅拌法加固软土技术具有其独特优点:1)最大限度地利用了
原土;2)搅拌时无振动、无噪声和无污染,可在密集建筑群中进行施工,对周围原有建筑物及地下沟管影响很小;3)根据上部结构的需要,
可灵活地采用柱状、壁状、格栅状和块状等加固形式;4)与钢筋混凝土桩基相比,可节约钢材并降低造价。6.高压喷射有(?)(固结
体为圆柱状)、(?)(固结体为壁状)和(?)(固结体为扇状)等三种基本形状。7.高压喷射注浆的全过程为(?)、
(?)、(?)、(?)和(?)等基本工序。1K413030盾构法施工1.管片类型:管片按材质分为钢筋混凝土管片、(?)、
(?)、钢纤维混凝土管片、复合材料管片。其中,(?)、(?)一般用于(?)或(?)。(?)是盾构隧道衬砌中最常用的管片类型
。2.(?)(设置在两条地铁隧道之间的一条横向通道,起到(??)、(?)、(?)等作用)。3.管环通常由A型管片(
标准环)、B型管片(邻接块)和K型管片(封顶块)构成。管片之间一般采用(?)。4.(?)管片根据拼装
方式的不同,有从隧道内侧向半径方向插入的径向插入型和从隧道轴向插入的轴向插入型,以及两者并用的类型。1K413031盾构机选型要
点1.按开挖面是否封闭划分,可分为(?)式和(?)式两类。按平衡开挖面土压与水压的原理不同,密闭式盾构又可分为土压式(
常用泥土压式)和泥水式两种。敞开式盾构按开挖方式划分,可分为(?)、(?)式和(?)式三种。2.泥水平衡盾构利用循环
悬浮液的体积对泥浆压力进行调节和控制,采用(???)(俗称泥浆)作为支护材料。开挖面的稳定是将泥浆送入泥水室内,在开挖面上
用泥浆形成不透水的泥膜,通过该泥膜的张力保持水压力,以平衡作用于开挖面的土压力和水压力。开挖的土砂以泥浆形式输送到地面,通过泥水处
理设备进行分离,分离后的泥水进行质量调整,在输送到开挖面。第42页?共123页1K413032盾构施工条件与现场布置
1.始发工作井的长度应大于盾构主机长度(?),宽度应大于盾构直径3m以上;接收工作井的平面内净尺寸应满足盾构(?)、(?
)和(?)的要求;始发、接收井的井底板应(?)始发和到达洞门底标高,并应满足相关装置安装和拆卸所需的最小作业空间要求。始
发工作井尺寸应满足电瓶车出土吊装及管片吊装和人员下井楼梯安装的要求。2.施工现场平面布置:主要包括盾构工作井、工作井防雨棚及防淹
墙、垂直运输设备、管片堆场、管片防水处理场、拌浆站、料具间及机修间、两回路的变配电间等设施以及进出通道等。3.采用气压法盾构施工
时,施工现场应设置(?),以供给足够的压缩空气。4.采用泥水平衡盾构施工时,施工现场应设置泥浆处理系统(中央控制室)、泥
浆池。5.采用土压平衡盾构施工时,应设置电机车电瓶充电间等设施。1K413033盾构施工阶段划分及始发与接收施工技术1.洞口
土体加固的作用(1)盾构从始发工作井进入地层前,首先应拆除始发工作井洞门处的围护结构,以便将盾构推入土层开始掘进;盾构到达接收工
作井前,亦应先拆除洞门处工作井的维护结构,以便盾构进入接收工作井。(2)盾构掘进通过加固区域时,防止盾构周围的地下水及土砂流入工
作井;(3)拆除洞口围护结构及盾构掘进通过加固区域时,防止地层变形对施工影响范围内的地面建筑物及地下管线与构筑物等造成破坏。2.
常用的加固有(?)、(?)、(?)、(?)、(?)。国内较常用的是(?)、(?)、(?)。3.决定初始掘进长度有二个因素:
一是(?),二是(?)。4.盾构接收可分为(?)、(?)和(?)。5.当盾构到达接收工作井100m时,应对(?)
进行测量和调整。6.当盾构到达接收工作井10m内,应控制(?)和(?)等。1K413034盾构掘进技术1.盾构
掘进四要素:(?)、(?)、(?)、第43页?共123页(?)2.改良渣土的特征:(?);(?);(?);(?)。3
.管片拼装呈真圆,并保持真圆状态,对于确保隧道尺寸精度、提高施工速度与止水性及减少地层沉降非常重要。4.对已拼装成环的衬砌环应
进行(?)抽查。5.管片壁后注浆按与盾构推进的时间和注浆目的不同,可分为(?)、(?)和(?)。(1)使管片与围岩之
间的环形空隙尽早建立注浆体的支撑体系。注浆目的(2)确保管片初衬结构的早期稳定性。(3)减少地下水直接与管片接触的机会,提高衬
砌结构的耐久性。壁后注浆1.同步注浆:同步注浆与盾构掘进同时进行。注浆分类2.二次注浆:管片背后二次补强注浆则是在同步注浆结束
以后。3.堵水注浆:必要时在二次注浆结束后进行堵水注浆。6.线形控制的主要任务是通过控制(?),使构建的衬砌结构几何中心线线
性顺滑,且位于设计中心线的容许误差范围内。1K413040喷锚暗挖(矿山)法施工1K413041喷锚暗挖法的掘进方式选
择1.全断面开挖法的优点是可以减少开挖对围岩的扰动次数,有利于围岩天然承载拱的形成,工序简便;缺点是对地质条件要求严格,围岩必须
有足够的(?)。2.台阶法应根据地质和开挖断面跨度等确定开挖台阶长度,土质隧道台阶长度不宜超过隧道宽度的(?)倍,台阶不宜
多于(?)级。3.—次循环开挖长度,稳定岩体中应根据机械开挖能力确定,一般不宜大于(?)。4.环形开挖预留核心土一般情况下
,将断面分成(?)、(?)、(?)等三部分。根据断面的大小,环形拱部又可分成几块交替开挖。环形开挖进尺为0.5–1.0m,
不宜过长。台阶长度一般以控制在(?)内(D一般指隧道跨度)为宜。5.(?)适用于断面跨度大,地表沉降难于控制的软弱松散
围岩中隧道施工。6.(?)施工顺序:开挖一侧导坑,并及时地将其初期支护闭合。相隔适当距离后开挖另一侧导坑,并建造初期支护。开挖上
部核心土,建造拱部初期支护,拱脚支承在两侧壁导坑的初期支护上。开挖下台阶,建造底部的初期支护,使初期支护全断面第44页?共
123页闭合。拆除导坑临空部分的初期支护。施作内层衬砌。7.中隔壁法也称CD工法,主要适用于(?)、(???)的地下
工程施工。8.CD工法不能满足要求时,可在CD工法基础上加设(?),即所谓的交叉中隔壁法(CRD工法)。1K4130
42工作井施工技术1.竖井施工范围内应(?)十字探沟,确定无管线后再开挖。2.竖井井口防护应符合下列规定:1)竖井应设
置防雨棚、挡水墙。2)竖井应设置安全护栏,护栏高度不应小于(?)。3)竖井周边应架设安全警示装置。3.圈梁混凝土强度应达到
设计强度的(?)及以上时,方可向下开挖竖井。4.井口地面荷载不得超过设计规定值;井口应设置(?),四周地面应硬化处理,并应
做好排水措施。5.应对称、分层、分块开挖,每层开挖高度不得大于设计规定,随挖随支护;每一分层的开挖,宜遵循(?)、(?)的顺
序。6.竖井初期支护施工至马头门处应(?)及(?),并应沿马头门拱部外轮廓线打入(?),注浆加固地层。7.马头门的开挖
应分段破除竖井井壁,宜按照(?)、(?)、(?)的顺序破除。8.马头门开启应按顺序进行,同一竖井内的马头门不得同时施工。一侧隧
道掘进(?)后,方可开启另一侧马头门。马头门标高不一致时,宜遵循“(?)”的原则。9.施工中严格贯彻“(?)、(?)、(?)、
(?)、(?)、(?)”的十八字方针。1K413043超前预支护及预加固施工技术1.地层超前预支护及预加固可采取下列措施:(
?);(?);(?)。2.在软弱、破碎地层中成孔困难或易塌孔,且施做超前锚杆比较困难或者结构断面较大时,宜采取(?)加固处理
方法。3.超前小管道应沿隧道拱部轮廓线外侧设置,根据地层条件可采用单层、双层超前第45页?共123页小导管;其环向布
设范围及环向间距由设计单位根据地层特性确定;安装小导管的(?)、(?)、(?)应符合设计要求。4.超前小导管应选用直径(?
)的(?)或(?),长度应大于循环进尺的(?),宜为(?),具体长度、直径应根据设计要求确定。5.前后两排小导管的水
平搭接长度不应小于(?)。6.注浆材料可采用(?)、(?)、(??)、(?)等注浆材料。7.在砂卵石地层中宜采用(?)
;在砂层中宜采用(?)、(?);在黏土层中宜采用(?)或(?)。8.注浆顺序:应(?)、(?)进行;相邻孔位应错开、
交叉进行。9.注浆孔的(?)、(?)、(?)应符合相关规范的要求。10.管棚中的钢管应按照设计要求进行加工和开孔,管内应灌
注(?)或(?),以便提高钢管自身(?)和(?)。11.通常,在下列施工场合应考虑采用管棚进行超前支护:1)穿越铁路
修建地下工程;2)穿越地下和地面结构物修建地下工程;3)修建大断面地下工程;4)隧道洞口段施工;5)通过断层破碎带等特殊地
层;6)特殊地段,如大跨度地铁车站、重要文物保护区、河底、海底的地下工程施工等。12.施工工艺流程:(?)→(?)→(
?)→(?)→(?)(向钢管内或管周围土体)→(?)→(?)。13.双向相邻管棚的搭接长度不小于(?)。1K
413044喷锚支护施工技术1.浅埋暗挖法施工地下结构需采用喷锚初期支护,主要包括(?)、(?)、(?)等支护结构形式;可
根据围岩的稳定状况,采用一种或几种结构组合。2.喷射混凝土应采用(?),其强度必须符合设计要求。严禁选用具有碱活性集料。使用前
应做凝结时间试验,要求初凝时间≤(?),终凝时间≤(?)。3.首榀格栅拱架应进行(?),并应经建设单位、监理单位、设计单位
共同验收合格后方可批量加工。第46页?共123页4.喷射混凝土应(?)、(?)、(?)依次进行。分层喷射时,后一
层喷射应在前一层混凝土(?)进行。5.喷射混凝土的养护应在(?)进行,养护时间应不小于(?);当环境潮湿有水时,可根据
情况调整养护时间。6.隧道拱脚应采用斜向下(?)打入的锁脚锚杆锁定。7.背后回填注浆应合理控制(?)和(?)。当注浆
压力和注浆量出现异常时,应分析原因,调整注浆参数。1K413045衬砌及防水施工要求1.《地下工程防水技术规范》GB50108-
2008规定:地下工程防水的设计和施工应遵循“(?)”的原则。2.《地铁设计规范》GB50157-2013规定:地下铁道隧道工
程的防水设计,应根据工程地质、水文地质、地震烈度、结构特点、施工方法和使用要求等因素进行,并应遵循“(?)”的原则,采取与其相适应
的防水措施。3.喷锚暗挖(矿山)法施工隧道通常采用(?)设计,衬砌结构是由(?)、(?)和(?)所组成。4.
喷锚暗挖(矿山)法施工隧道的复合式衬砌,以(?)为根本,辅加防水层组成防水体系,以变形缝、施工缝、后浇带、穿墙洞、预埋
件、桩头等接缝部位混凝土及防水层施工为防水控制的重点。5.复合式衬砌防水层施工应优先选用(?)。6.二衬采用(?)混凝土
,具有良好的抗裂性能,主体结构防水混凝土在工程结构中不但承担防水作用,还要和钢筋一起承担结构受力作用。7.二衬混凝土浇筑应采用
(?)体系和(?)两种模板体系。对模板及支撑结构进行验算,以保证其具有足够的(?)、(?)和(?),防止发生变形和下沉
。模板接缝要拼贴平密,避免漏浆。8.混凝土浇筑采用泵送模筑,两侧边墙采用(?)振动器振捣,底部采用(?)振动器振捣。混凝土
浇筑应连续进行,(?),(?),不得出现水平(?)和(?)接缝;如混凝土浇筑因故中断,则必须采取措施对两次浇筑混凝土界面进
行处理,以满足防水要求。1K413046喷锚暗挖法辅助功法施工技术要点1.地表锚杆(管)是一种地表预加固地层的措施,适
用于浅埋暗挖、进出工作井地第47页?共123页段和岩体松软破碎地段。2.地面锚杆(管)按矩形或梅花形布置,(
???)。3.锚杆类型有(?)、(?)、(?)、(?)和(?)。4.冻结法主要优缺点:1)主要优点:冻结地层(?);地
下水封闭效果好;地层整体固结性好;对工程环境污染小。2)主要缺点:(?);有一定的技术难度。1K420110城市轨道交通工程施
工质量检查与检验1K420112喷锚支护施工质量检查与验收1.喷锚支护法施工质量检查与验收分为(?)、(?)、(?)、(?)
四个环节。2.宜用(?)控制(?)和(?)控制(?)。3.相向开挖的两个开挖面相距约(?)倍管(隧)
径时,应停止一个开挖面作业,进行封闭;由另一开挖面作贯通开挖。4.喷射混凝土施工:1)喷射作业分段、分层进行,喷射顺序(?
)。2)喷头应保持(?)于工作面,喷头距工作面不宜大于(?)。3)分层喷射时,应在前一层混凝土(?)进行。4)钢筋
网的喷射混凝土保护层不应小于(?)。5)喷射混凝土终凝(?)后进行养护,时间不小于14d;气温低于5℃不得喷水养护。5
.防水层施工应在初期支护基本稳定且衬砌检查合格后进行。6.浇筑前,应对设立模板的外形尺寸、中线、标高、各种预埋件等进行隐蔽工程
检查,并填写记录;检查合格后方可进行灌注。7.应从下向上浇筑,各部位应对称浇筑、振捣密实,且振捣器不得触及(?)。1K4201
13盾构法隧道施工质量检查与验收1.模具安装符合要求后进行试生产,在试生产的管片中,随机抽取(?)进行水平拼装检验,合格后
正式生产。第48页?共123页2.模具周转(?)必须进行检验。3.混凝土浇筑成型后至开模前,应覆盖保湿,可采用
(?)或(?)。4.吊装预埋件首次使用前进行(?),试验结果符合设计要求。5.日生产每(?)应抽取1块管片进行
检验。检验项目:(?)、(?)、(?)6.每生产(?)后进行水平拼装检验一次。7.管片拼装过程中对(?)和(?)进
行控制。8.隧道防水以(?)为基础,(?)为重点,并应对特殊部位进行防水处理,形成完整的防水体系。第49页?共12
3页1K414000城市给水排水工程1K414010给水排水厂站工程结构与特点1K414011厂站工程结构与施工方法1.
给水排水场站工程结构特点(一)场站构筑物组成调节池、调流阀井、格栅间及药剂间、集水池、取水泵房、混凝沉淀池、澄清给水处理构
筑物池、配水井、混合井、预臭氧接触池、主臭氧接触池、滤池及反冲洗设备间、紫外消毒间、膜处理车间、清水池、调蓄清水池、配水泵房等。
污水进水闸井、进水泵房、格栅间、沉砂池、初沉淀池、二次沉淀池、曝气池、污水处理构筑物配套工程配水井、调节池、生物反应池、氧化沟、消
化池、计量槽、闸井等。包括厂内道路、厂区给排水、照明、绿化、门卫室及围墙等工程。指水处理构筑物之间、水处理构筑物与机房之间的各种连
接管线;包括进水管、出水工艺管线管、污水管、给水管、回用水管、污泥管、出水压力管、空气管、热力管、沼气管、投药管线等。2.水处理
(调蓄)构筑物和泵房多数采用地下或半地下钢筋混凝土结构,特点是构件断面较薄,属于(?)或(?),(?),具有(?)
和(?)要求。3.工艺管线中给排水管道越来越多采用(?)、(?)、(?)的(?)、(?)等新型管材。4.水处理构筑
物中圆柱形混凝土池体结构,当池壁高度大((?))时宜采用整体现浇施工,支模方法有:(?)及(?)。前者模板与支架用量大,后
者宜在池壁高度不小于(?)时采用。5.污水处理构筑物中卵形消化池,通常采用(?)、(??)施工。6.以圆形储水池为例,
池体通常由若干块厚扇形底板单元和若干块倒T型壁板单元组成,一般不设(?)。单元一次性浇筑而成,底板单元间用(?)嵌缝,壁
板单元间用(?)接缝,这种单元组合结构可有效防止池体出现裂缝渗漏。7.大型矩形水池为避免裂缝渗漏,设计通常采用单元组合结构将
水池分块(单元)浇筑,各块(单元)间留设(?),池体钢筋按设计要求一次绑扎好,缝带处不切断,待块(单元)养
护(?)后,再采用比块(单元)强度高一个等级的混凝土或第50页?共123页掺加UEA的(?)灌注后
浇缝带且养护时间不应低于(?),使其连成整体。8.水处理构筑物中沉砂池、沉淀池、调节池等圆形混凝土水池宜采用装配式预应力钢筋
混凝土结构,以便获得较好的(?)和(?)。9.排水下沉沉井方法:适用于(?),(?)。10.排水下沉分为(?)、(?
)、(?)。11.不排水下沉沉井方法:适用于比较深的沉井或有严重流砂的情况。不排水下沉分为(?)、(?)、(?)。1K4140
12给水与污水处理工艺流程1.水中含有的杂质,分为(?)、(?)和(?)三种,也可按杂质的颗粒大小以及存在形态分为(
?)、(?)和(?)三种。2.处理目的是去除或降低原水中(?)、(?)、(?)以及水中含有的其他有害杂质,使处理后的水
质满足用户需求。常用的给水处理方法自然沉淀混凝沉淀用以去除水中粗大颗粒杂质使用混凝药剂沉淀或澄清去除水中胶体和悬浮杂质等使水通过细
孔性滤料层,截流去除经沉淀或澄清后剩余的细微杂质;或不经过沉淀,原水直接加药、混凝、过滤去除水中胶体和悬浮杂质。过滤消毒去除水中病
毒和细菌,保证饮水卫生和生产用水安全。降低水中钙、镁离子含量,使硬水软化。(?)除铁除锰去除地下水中所含过量的铁和锰,使水质符合饮
用水要求。提高饮用水水质还有预处理和深度处理工艺①?(?)②?高锰酸钾氧化化学氧化法③?紫外光氧化氧化法④?(?)预处理生物氧化法
粉末活性炭吸附黏土吸附生物膜法吸附法①?活性炭吸附法;②?臭氧活性炭法;③?生物活性炭法;④?光催化氧化法;⑤?臭氧氧化法;??⑥
?吹脱法。深度处理第51页?共123页污水处理方法与工艺生物化学需氧量(BOD5)、化学需氧量(COD)、总需氧量
(TOD)、总有机碳(TOC)来表示。污水中有机物浓度根据水质类型分为①?物理处理法(筛滤截留、(?)、(?));②?生
物处理法(活性污泥法、生物膜法);③?污水处理产生的污泥处置及化学处理法。一级处理:针对水中悬浮物质;二级处理:去除污水中呈
胶体和溶解状态的有机污染物质;(?):进一步处理难降解的有机物,以及可导致水体富营养化的氮、磷等可溶性无机物等。根据处理程度分为1
K414013给水与污水处理厂试运行1.单机试车,一般空车试运行不少于(?);2.全厂联机运行应不少于(?);3.处理
设备及泵房机组运行(?)后,停机试验;4.不通水情况下,运行(?),一切正常后停机;5.处理设备及泵房单机组累计运行达
(?);6.连续试运行期间,开机、停机不少于(?)次;7.处理设备及泵房机组联合试运行时间,一般不少于(?)。1K414
020给水排水厂站工程施工1K414021现浇(预应力)混凝土水池施工技术1.单元组合式现浇钢筋混凝土水池工艺流程:
土方开挖及地基处理→中心支柱浇筑→(?)→浇筑池底混凝土垫层→(?)→池壁分块浇筑→底板分块浇筑→底板嵌缝→(?)→功
能性试验2.模板上的预埋件、预留孔洞、穿墙套管的安装必须牢固,位置准确。穿墙套管的直径应至少比管道直径大(?)。待管道穿过套管
后,套管与管道空隙应进行防水处理。在安装池壁的最下一层模板时,应在适当位置预留清扫杂物用的窗口。在浇筑混凝土前,应将模板内部清扫干
净,经检验合格后,再将窗口封闭。3.采用(?)来平衡混凝土浇筑对模板侧压力时。4.两端能拆卸的螺栓中部应加焊止水环,止水环
不宜采用(?),且与螺栓满焊牢固。5.螺栓拆卸后混凝土壁面应留有(?)深锥形槽。第52页?共123页6.池壁
与顶板连续施工时,池壁内模立柱(不承重的)不得同时作为顶板模板立柱(浇混凝土,受压构件)。顶板支架的斜杆或横向连杆不得
与池壁模板的杆件相连接。池壁模板可先安装一侧,绑完钢筋后,分层安装另一侧模板(内模一次支好,外模随支随浇),或采用一次安装到
顶而分层预留操作窗口的施工方法。分层安装模板,每层层高不宜超过(?);分层留置的窗口的层高不宜超过(?),水平净距不宜超过(?
)。7.(?)或(?)接头应采用(?),不得采用(?);接缝应平整牢固,不得有裂口、脱胶现象;T字接头、十字接头和Y
字接头,应在工厂加工成型。8.(?)接头应按其厚度分别采用(?)或(?);搭接长度不得小于(?),咬接或搭接必须采用
(?)。9.止水带安装应牢固,位置准确,其中心线应与变形缝中心线对正,止水带不得有裂纹、孔洞等。不得在止水带上(?)或用(
?)就位。10.混凝土底板和顶板,应连续浇筑不得留置(?);设计有变形缝时,应按(?)分仓浇筑。11.池壁与底部相接处的
施工缝,宜留在底板上面不小于(?)处;底板与池壁连接有腋角时,宜留在腋角上面不小于(?)处;12.池壁与顶部相接处的施工
缝,宜留在顶板下面不小于(?)处;有腋角时,宜留在腋角下部。13.构筑物处地下水位或设计运行水位高于底板顶面(?)时,施
工缝处宜设置高度不小于(?)、厚度不小于(?)的(?)。14.钢筋连接的方式:根据(?)、(?)、(?)确定钢筋连接的
方式。主要采取(?)、(?)、(?)方式。15.预应力筋必须采用Ⅰ类锚具,锚具规格应根据无粘结预应力筋的品种、张拉吨位以及工
程使用情况选用。16.施工工艺流程:钢筋施工→安装(?)→铺设(?)→安装托架筋、承压板、螺旋筋→铺设(?)→(?
)→混凝土浇筑→混凝土养护→拆模及锚固肋混凝土凿毛→割断外露塑料套管并清理油脂→安装锚具→安装千斤顶→同步加压→量测→回油撤泵→
锁定→切断无粘结筋(留100mm)→锚具及钢绞线防腐→封锚混凝土。17.锚固肋数量和布置,应符合设计要求;设计无要求时,
应保证张拉段无粘结预应力筋长不超过(?),且锚固肋数量为(?);18.张拉段无粘结预应力筋长度小于(?)时,宜采用一端张
拉;张拉段无粘结预应力筋长度大于(?)而小于(?)时,宜采用两端张拉;张拉段无粘结预应力筋长度第53页?共123
页大于(?)时,宜采用分段张拉和锚固。19.凸出式锚固端锚具的保护层厚度不应小于(?);20.外露预应力筋的保护层厚度
不应小于(?);21.封锚混凝土强度等级不得低于相应结构混凝土强度等级,且不得低于(?)。22.混凝土浇筑后的(?)以
内,对混凝土加以覆盖保湿养护。洒水养护时间不应少于(?),当日最低温度低于5℃时,不应采用洒水养护。后浇带浇筑应在两侧混凝土养
护不少于(?)以后进行。后浇带混凝土的养护时间不应少于(?)。大体积混凝土保湿养护不得少于(?)。混凝土养护,控制浇筑混凝
土内外温差不大于(?)。混凝土强度达到(?)前,不得在其上踩踏、堆放物料或安装模板及支架。1K414022装配式预应力混凝
土水池施工技术1.预制构件应按设计位置起吊,曲梁宜采用(?)。吊绳与预制构件平面的交角不应小于(?);当小于(?)时,应
进行强度验算。2.预制构件安装就位后,应采取临时固定措施。曲梁应在梁的跨中临时支撑,待上部二期混凝土达到设计强度的(?)及以
上时,方可拆除支撑。安装的构件,必须在轴线位置及高程进行校正后焊接或浇筑接头混凝土。3.壁板接缝的内模宜一次安装到顶;外模应分段
随浇随支。分段支模高度不宜超过(?);4.浇筑时间应根据气温和混凝土温度选在壁板间缝宽较大时进行;混凝土如有离析现象,应进行二次
拌合;混凝土分层浇筑厚度不宜超过(?),并应采用机械振捣,配合人工捣固;5.用于接头或拼缝的混凝土或砂浆,宜采取(?)和
(?),在浇筑过程中应振捣密实并采取必要的养护措施。1K414023构筑物满水试验的规定1.(?)是给水排水构筑物的主要功能性
试验之一。2.满水试验前必备条件(1)池体的混凝土或砖、石砌体的砂浆已达到设计强度要求;池内清理洁净,池内外缺陷修补完毕。(2
)现浇钢筋混凝土池体的防水层、防腐层施工之前;装配式预应力混凝土池体施加第54页?共123页预应力且锚固端封锚以后,
保护层喷涂之前;砖砌池体防水层施工以后,石砌池体勾缝以后。(3)设计预留孔洞、预埋管口及进出水口等已做临时封堵,且经验算能安全承
受试验压力。(4)池体抗浮稳定性满足设计要求。(5)试验用的充水、充气和排水系统已准备就绪,经检查充水、充气及排水闸门不得渗漏
。(6)各项保证试验安全的措施已满足要求;满足设计的其他特殊要求。(7)试验所需的各种仪器设备应为合格产品,并经具有合法资质的
相关部门检验合格。3.试验流程:(??)4.向池内注水宜分(?)进行,每次注水为设计水深的(?)。对大、中型池体,可先注
水至池壁底部施工缝以上,检查底板抗渗质量,当无明显渗漏时,再继续注水至第一次注水深度。5.注水时水位上升速度不宜超过(?)。相
邻两次注水的间隔时间不应小于(?)。6.注水至设计水深进行水量测定时,应采用水位测针测定水位。水位测针的读数精确度应达(?)。
7.注水至设计水深(?)后,开始测读水位测针的初读数。8.测读水位的初读数与末读数之间的间隔时间应不少于(?)。9.满
水试验标准(1)水池渗水量计算,按池壁(不含内隔墙)和池底的浸湿面积计算。(2)渗水量合格标准。钢筋混凝土结构水池不得
超过(?);砌体结构水池不得超过(?)。1K414024沉井施工技术1.刃脚的垫层采用砂垫层上铺垫木或素混凝土。2.砂垫
层分布在刃脚中心线的两侧范围,应考虑方便抽除垫木;砂垫层宜采用(?),并应分层铺设、分层夯实;3.每节制作高度应符合施工方案要求
且第一节制作高度必须(?)刃脚部分;井内设有底梁或支撑梁时应与刃脚部分整体浇捣。4.混凝土施工缝处理应采用(?)或设置
(?),施工缝应凿毛并清理干净;内外模板采用(?)固定时,其对拉螺栓的中间应设置防渗止水片;钢筋密第55页?共123
页集部位和预留孔底部应辅以人工振捣,保证结构密实。5.排水下沉过程中应进行连续排水,(保持在基底以下0.5m)保证沉井范
围内地层水疏干。6.排水下沉挖土应(?)、(?)、(?)进行;对于有底梁或支撑梁沉井,其相邻格仓高差不宜超过(?);严禁超
挖。7.下沉应平稳、均衡、缓慢,发生偏斜应通过调整开挖顺序和方式“(?)、(?)”。8.终沉时,每小时测一次,严格控制超沉,沉
井封底前自沉速率应小于(?);9.沉井外壁采用(?)以减少下沉摩擦阻力时,在井外壁与土体之间应有专人随时用黄砂均匀灌入,四
周灌入黄砂的高差不应超过(?)。10.干封底前应设置(?),底板混凝土强度达到设计强度等级且满足抗浮要求时,方可封填泄水井、
停止降水。11.水下封底混凝土强度达到设计强度等级,沉井能满足抗浮要求时,方可将井内水抽除,并凿除表面松散混凝土进行钢筋混凝土底
板施工。1K414025水池施工中的抗浮措施当构筑物无抗浮设计时,水池施工应采取抗浮措施1.在施工过程中不得(?)降、排水
,并应对降、排水系统进行检查和维护;构筑物未具备抗浮条件时,严禁停止降、排水。2.构筑物下及基坑内四周埋设排水盲管(盲沟)
和抽水设备,一旦发生基坑内积水随即排除。3.备有应急供电和排水设施并保证其可靠性。1K420120城市给水排水场站工程质量检
查与验收1K420121给水排水混凝土构筑物防渗漏措施1.给水排水构筑物施工时,应按“(?)、(?)?”的顺序施工,并应与防止
各构筑物交叉施工时相互干扰。对建在地表水水体中、岸边及地下水位以下的构筑物,其主体结构宜在枯水期施工。2.水泥宜为质量稳定的(
?)。外加剂和掺合料必须性能可靠,有利于降低混凝土凝固过程的(?)。3.避免混凝土结构内外温差过大:首先,降低混凝土的入模温度
,且不应大于(?),第56页?共123页使混凝土凝固时其内部在较低的温度起升点升温,从而避免混凝土内部温度过高。4.
合理设置后浇带:对于大型给水排水混凝土构筑物,合理的设置后浇带有利于控制施工期间的较大温差与收缩应力,减少裂缝。设置后浇带时,要
遵循“(?),(?)”的原则。第57页?共123页1K415000城市管道工程1K415010城市给水排水管道工程
施工1K415012开槽管道施工技术1.人工开挖沟槽的槽深超过(?)时应分层开挖,每层的深度不超过(?)。2.人工开挖
多层沟槽的层间留台宽度:放坡开槽时不应小于(?);直槽时不应小于(?);安装井点设备时不应小于(?)。3.槽底原状地基土不
得扰动,机械开挖时槽底预留(?)土层,由(?)至设计高程,整平。4.槽底不得受水浸泡或受冻,槽底局部扰动或受水浸泡时,宜采
用(?)或(?)回填;槽底扰动土层为湿陷性黄土时,应按(?)进行地基处理。5.撑板支撑应随挖土及时安装。每根横梁或纵梁
不得少于(?)横撑。横撑的水平间距宜为(?),垂直间距不宜大于(?)。6.在软土或其他不稳定土层中采用横排撑板支撑时,开
始支撑的沟槽开挖深度不得超过(?);开挖与支撑交替进行,每次交替的深度宜为(?)。7.槽底局部超挖或发生扰动时,超挖深度不超
过(?)时,可用挖槽原土回填夯实,其压实度不应(?)原地基土的密实度;槽底地基土壤含水量较大,不适于压实时,应采取(?)
等有效措施。8.排水不良造成地基土扰动时,扰动深度在(?)以内,宜填(?)或(?)处理;扰动深度在(?)以内,但
下部坚硬时,宜填(?)或(?),并用(?)填充空隙并找平表面。9.采用(?)和(?)时,安装应按照施工方案严格
控制上、下游管道接装长度、中心位移偏差及管节接缝宽度和深度。10.采用焊接接口时,两端管的环向焊缝处齐平,内壁错边量不宜超过管壁
厚度的(?),且不得大于(?)。管道任何位置不得有(?)。11.金属管道应按设计要求进行(?)和(?)。12.压力管
道水压试验前,除接口外,管道两侧及管顶以上回填高度不应小于(?);水压试验合格后,应及时回填沟槽的其余部分;无压管道在(?)
或(?)试验合格后应及时回填。13.回填土的含水量,宜按土类和采用的压实工具控制在最佳含水率(?)范围内。14.管道两
侧和管顶以上(?)范围内胸腔夯实,应采用轻型压实机具,管道两侧第58页?共123页压实面的高差不应超过(?)。1
5.分段回填压实时,相邻段的接槎应呈(?)。采用轻型压实设备时,应夯夯相连;采用压路机时,碾压的重叠宽度不得小于(?)。16
.柔性管内径大于(?)柔性管道,回填施工时应在管内设有(?)。17.沟槽回填从管底基础部位开始到管顶以上(?)范围内
,必须采用(?)回填;管顶(?)以上部位,可用机械从管道轴线两侧同时夯实;每层回填高度应不大于(?)。18.柔性管道回填
至设计高程时,应在(?)内测量并记录管道变形率,管道变形率应符合设计要求。1K415013不开槽管道施工技术1.施工方法与
设备分类。施工工法密闭式顶管盾构浅埋暗挖水平定向钻夯管施工速度快、成本工法优点施工精度高施工速度快适用性强施工速度快较低施工速度慢
、施工成本高工法缺点适用范围施工成本高施工成本高控制精度低柔性管道控制精度低钢管给水排水管给水排水管给水排水管道、综合管道道、综合
管道道、综合管道适用管径(mm)φ300-φ4000较长φ3000以上长φ1000以上较长φ300-φ1000较短φ200-φ
1800短施工距离适用地质条件除硬岩外相对均质地层砂卵石及含水含水地层不适用、地层不适用砂卵石地层困难各种土层各种土层第59
页?共123页2.目前城市改扩建给水排水管道多采用(?)施工。3.盾构法施工用于给水排水主干管道工程,直径一般在
(?)以上。4.在城区地下障碍物较复杂地段,采用(?)施工管(隧)道是较好的选择。5.(?)在以较大埋深穿越道
路桥涵的长距离地下管道的施工中会表现出优越之处。6.(?)在特定场所有其优越性,适用于城镇区域下穿较窄道路的地下管道施工。1K4
15014管道功能性试验1.给水排水管道功能性试验包括压力管道的(?)、无压管道的(?)。2.压力管道的水压试验分为(
?)和(?)阶段;试验合格的判定依据分为(?)和(?),按设计要求确定。设计无要求时,应根据工程实际情况,选用其中一项值
或同时采用两项值作为试验合格的最终判定依据。管材种类工作压力PP试验压力钢管P+0.5,且不小于0.9≤0.5>0.5≤
0.6>0.6≥0.1≥0.12PP+0.5球墨铸铁管1.5P预(自)应力混凝土管、预应力钢筒混凝土管P+0.3现浇
钢筋混凝土管渠化学建材管1.5P1.5P,且不小于0.83.水压试验进行实际渗水量测定时,宜采用(?)进行。4.管道采用
两种(或两种以上)管材时,宜按不同管材(?)进行试验;不具备分别试验的条件必须组合试验,且设计无具体要求时,应采用不同
管材的管段中试验控制第60页?共123页(?)的标准进行试验。5.除设计有要求外,压力管道水压试验的管段长度不宜大
于(?)。6.试验管段所有敞口应封闭,不得有渗漏水现象。开槽施工管道顶部回填高度不应小于(?),宜留出接口位置以便检查渗漏处
。7.试验管段不得用(?)作为堵板,不得含有(?)、(?)、(?)等附件。8.应从下游缓慢注入,注入时在试验管段上游的
管顶及管段中的高点应设置(?),将管道内的气体排除。9.试验管段注满水后,宜在不大于工作压力条件下充分浸泡后再进行水压试验,浸
泡时间规定:1)球墨铸铁管(有水泥砂浆衬里)、钢管(有水泥砂浆衬里)、化学建材管不少于(?);2)内径>1000
mm的现浇钢筋混凝土管渠、预(自)应力混凝土管、预应力钢筒混凝土管不少于(?);3)内径<1000mm的现浇钢筋
混凝土管渠、预(自)应力混凝土管、预应力钢筒混凝土管不少于(?)。10.污水、雨污水合流管道及湿陷土、膨胀土、流砂地区
的雨水管道,必须经(?)后方可投入运行。11.试验管段应按井距分隔,抽样选取,带井试验;若条件允许可一次试验不超过(?)井段
。12.当管道内径大于700mm时,可按管道井段数量抽样选取(?)进行试验;试验不合格时,抽样井段数量应在原抽样基础上加
倍进行试验。13.试验管段灌满水后浸泡时间不应少于(?)。1K415015砌筑沟道施工技术1.砌筑前砌块(砖、石)
应充分湿润;砌筑砂浆配合比符合设计要求,强度等级不低于(?),现场拌制应采用机械拌合均匀、随用随拌;砌筑应立皮数杆、样板挂线控制
水平与高程。砌筑应采用(?)。砌体应(?)、(?)、(?)有序。2.砌体的沉降缝、变形缝、止水缝应位置准确、砌体平整、砌体
垂直贯通,缝板、止水带安装正确,沉降缝、变形缝应与基础的沉降缝、变形缝贯通。3.拱圈砌筑应自(?)进行,灰缝匀称,拱中心位置
正确,灰第61页?共123页缝砂浆饱满严密。4.应采用退槎法砌筑,每块砌块退半块留槎,拱圈应在(?)内封顶,两侧
拱圈之间应满铺砂浆,拱顶上不得堆置器材。5.反拱砌筑根据样板挂线,先砌中心的一列砖、石,并找准高程后接砌两侧,灰缝不得凸出砖面,
反拱砌筑完成后,应待砂浆强度达到设计抗压强度的(?)后,方可踩压。6.圆井砌块应垂直砌筑;收口砌筑时,应按设计要求的位置设置
钢筋混凝土梁;圆井采用砌块逐层砌筑收口时,四面收口的每层收进不应大于(?),偏心收口的每层收进不应大于(?)。1K415016
给水排水管网维护与修复技术1.局部修补主要有(?)、补丁法、铰接管法、局部软衬法、(?)、(?)等。2.全断面修复主要有
(?)、(?)、(?)。3.管道更新:破管外挤/爆管法/胀管法、(?)。1K415020城市供热管道工程施工1K41
5021供热管道的分类1.按热媒种类分类2.按敷设方式分类第62页?共123页1K415022供热管道施工与安
装要求1.调查拟建热力管道相对道路交通的关系,热力管道施工对现状交通有影响时,及时与(?)沟通,编制交通组织方案,经交通管理
部门审批后方可组织施工;需要占路掘路施工的,应提前向(?)申请办理占路掘路手续。2.钢管的(?)、(?)和(?)等应
符合设计规定和现行国家标准要求,材料的(?)、(?)及(?)齐全、完整。属于特种设备的压力管道元件(管道、弯头、三通、
阀门等),制造厂家还应有相应的特种设备制造资质,其质量证明文件、验收文件还应符合特种设备安全监察机构的相关规定。3.一级管网主
干线所用阀门及与一级管网主干线直接相连通的阀门,支干线首端和供热站入口处起关闭、保护作用的阀门及其他重要阀门,应进行(?)和
(?)试验,合格后方可使用。4.供热管道土建工程施工方法包括:(?)、(?)、(?)、(?)、(?)等。5.明挖沟槽常用的支
护方法有(?)、(?)、(?)等。当地下水位高于槽底时,应采取地下水控制措施,确保沟槽地下水位在基底以下(?)。6.机械开
挖时因预留不少于(?)厚的原状土,人工清底至设计标高,不得超挖。7.沟槽开挖至基底后,地基应由(?)、(?)、(?)、(?
)和(?)等单位共同验收。对不符合设计要求的地基,由(?)或(?)单位提出地基处理意见,施工单位根据其制定处理方案。
8.隧道应采用(?)施工,应在拱部初期支护基本稳定,并在喷射混凝土强度达到设计强度(?)以上时,方可进行下台阶开挖。隧道
相对开挖中,当两个工作面相距(?)时应一端停挖,单向开挖贯通。9.城镇供热管网管道应采用(?)钢管、(?)或(?)
焊接钢管。管道的连接应采用焊接,管道与设备、阀门等连接宜采用焊接,当设备、阀门需要拆卸时,应采用(?)连接。10.支架对管道
的约束作用不同,分为(?)和(?)。11.活动支架可分为:滑动支架、导向支架、滚动支架和悬吊支架等四种形式。12.固定支
架卡板和支架结构接触面应贴实;活动支架的(?)、(?)及(?)应符合设计要求。弹簧吊架安装高度应按设计要求进行调整,弹簧的临
时固定件,应在管道安装、试压、保温完成后拆除。13.有(?)的管段,补偿器安装前,管道和固定支架不得进行固定。14.管道对
口焊接前,应重点检验(?)、(?)、(?)、第63页?共123页(?)等。15.管道穿过基础、墙体、楼板处,应安
装套管,管道的焊口及保温接口不得置于墙壁中和套管中,套管与管道之间的空隙应用(?)填塞。16.不合格的焊接部位,应采取措施返
修。同一焊缝的返修次数不得大于(?)。17.采用偏心异径管(大小头)时,蒸汽管道的变径应管底相平(俗称底平)安
装在水平管路上,以便于排出管内冷凝水;热水管道变径应管顶相平(俗称顶平)安装在水平管路上,以利于排出管内空气。18.预制
直埋管道堆放时不得大于(?),且高度不得大于(?);施工中应有防火措施。19.在施工过程中,焊接质量检验依次为:(?)、(?
)、(?)、(?)和(?)。20.焊缝应(?)进行(?)质量检验。21.管道焊缝无损探伤检验应由具备资质的检测单位
实施。焊缝无损检测方法有(?)探伤、(?)探伤、(?)或(?)探伤等。热力管道焊缝无损检测宜采用(?);当采用(?)
时,应采用(?)复检,复检数量为超声波探伤数量的(?);角焊缝处的无损检测可采用(?)或(?)探伤。22.无损检测的
标准和频率应符合设计要求和规范规定。无损检测出现不合格,应及时进行返修,返修后按下列规定扩大检验:1)出现一道不合格焊缝,应再抽
检两道该焊工所焊的同一批焊缝,按原检测方法进行检验。2)第二次抽检仍出现不合格焊缝,应对该焊工所焊(?)同批焊缝按原检测方法
进行检验。同一焊缝的返修次数不应大于两次,根部缺陷只允许返修一次。1K415023供热管网附件及供热站设施安装要点1.设置于管
道上的补偿器的作用是:补偿因供热管道升温导致的管道热伸长,从而释放温度变形,消除(?),避免因热伸长或温度应力的作用而引起管道变
形或破坏。2.供热管道采用的补偿器种类很多,主要有自然补偿器、方形补偿器、波纹管补偿器、套筒式补偿器、球形补偿器等。3.(?)
是利用管路几何形状所具有的弹性来吸收热变形。自然补偿的缺点是管道变形时会产生横向的位移,而且补偿的管段不能很大。4.(?)其优点
是制造方便,补偿量大,轴向推力小,维修方便,运行可靠;第64页?共123页缺点是占地面积较大。5.自然补偿器、方形补
偿器和波纹管补偿器是利用(?)来吸收热伸长的,而填料式补偿器和球形补偿器则是利用(?)来吸收热伸长的。6.当阀门与管道以
(?)或(?)方式连接时,阀门应在(?)状态下安装,以防止异物进入阀门密封座。当阀门与管道以焊接方式连接时,宜采用(
?)打底,这是因为氩弧焊所引起的变形小,飞溅少,背面透度均匀,表面光洁、整齐,很少产生缺陷;另外,焊接时阀门不得(?),以防止受
热变形和因焊接而造成密封面损伤,焊机地线应搭在同侧焊口的钢管上,严禁搭在阀体上。对于承插式阀门还应在承插端头留有1.5mm的间
隙,以防止焊接时或操作中承受附加外力。阀门焊接完成降至环境温度后方可操作。7.管道及设备安装前,土建施工单位、工艺安装单位及监理
单位应对(??),(?)、(?)、(?)、(?)及混凝土质量,预留孔洞的位置、尺寸及标高等共同复核检查,并办理(?)交验手
续。8.管道焊接完成,应进行(?)和(?),无损检测的标准、数量应符合设计和相关规范要求。合格后按照系统分别进行(?)。
(?)后进行除锈、防腐、保温。1K415024供热管道功能性试验的规定1.项目试验方法和合格判定检验范围升压至试验压力,试验压
力为设计压力的1.5倍,且不小于0.6MPa,强度试验稳压10min,检查无渗漏、无压力降后降至设计压力,稳压30min
,检查无渗漏、无异常声响、无压力降为合格。每个试验段升压至试验压力,为设计压力的1.25倍,且不小于0.6MPa,当压力趋于
稳定后,检查管道、焊缝、管路附件及设备等无渗漏,固定支架无明显的变形等。严密性试验全段一级管网及站内二级管网稳压1h内,压力降
不大于0.05MPa;为合格。稳压30min内,压力降不大于0.05MPa,为合格。2.试运行在单位工程验收合格,完成管
道清洗并且热源已具备供热条件后进行。试运行前需要编制试运行方案,并要在建设单位、设计单位认可的条件下连续运行(?)。第65页
?共123页1K415030城市燃气管道工程施工1K415031燃气管道的分类1.根据输气压力分类中压次高压高压低压
BABABA<0.010.01≤P≤0.20.2<P≤0.40.4<P≤0.80.8<P≤
1.61.6<P≤2.52.5<P≤4.0聚乙钢管或铸铁管钢管钢管烯管1K415032燃气管道施工与安装要
求1.燃气管道对接安装引起的误差不得大于(?),否则应设置(?),次高压燃气管道的弯管应考虑(?)。2.地下燃气管道埋设
的最小覆土厚度(路面至管顶)应符合下列要求:埋设在车行道下时,不得小于(?)m;埋设在非车行道下时,不得小于(?)m;
埋设在机动车不能到达地方时,不得小于(?)m;埋设在水田下时,不得小于(?)m;不能满足上述规定时应采取有效的保护措施。3.
地下燃气管道不宜与其他管道或(?)同沟敷设。当需要同沟敷设时,必须采取防护措施。燃气管道穿越构建筑物4.不得穿越的规定:1)
地下燃气管道不得从建筑物和大型构筑物的下面穿越。2)地下燃气管道不得在堆积易燃、易爆材料和具有腐蚀性液体的场地下面穿越。5.
燃气管道穿越铁路、高速公路、电车轨道和城镇主要干道时应符合下列要求:1)穿越铁路和高速公路的燃气管道,其外应加(?),并提高绝
缘、防腐等措施。2)穿越铁路的燃气管道的套管,应符合下列要求:①?套管埋设的深度:套管顶部距铁路路肩不得小于(?),并应符合
(?)管理部门的要求。②?套管宜采用钢管或钢筋混凝土管。③?套管内径应比燃气管道外径大(?)以上。④?套管两端与燃气管的间隙
应采用柔性的防腐、防水材料密封,其一端应装设(?)。第66页?共123页⑤?套管端部距路堤坡脚外距离不应小于(?)。
3)燃气管道穿越电车轨道和城镇主要干道时宜敷设在套管或地沟内;穿越高速公路的燃气管道的套管、穿越电车轨道或城镇主要干道的燃气管道
的套管或地沟,符合下列要求:①?套管内径应比燃气管道外径大(?)以上,套管或地沟两端应密封,在重要地段的套管或地沟端部宜安装检
漏管。②?套管端部距电车边轨不应小于(?);距道路边缘不应小于(?)。③?燃气管道宜垂直穿越铁路、高速公路、电车轨道或城镇主要
干道。6.燃气管道通过河流时,可采用穿越河底或采用管桥跨越的形式。7.当条件允许时,可利用道路、桥梁跨越河流,并应符合下列要求
:1)利用道路、桥梁跨越河流的燃气管道,其管道的输送压力不应大于(?)。2)当燃气管道随桥梁敷设或采用管桥跨越河流时,必须采
取安全防护措施。3)燃气管道随桥梁敷设应在征得(?)管理部门同意后施工,宜采取如下安全防护措施:①?敷设于桥梁上的燃气管道应
采用加厚的无缝钢管或焊接钢管,尽量减少焊缝,对焊缝进行100%(?)和100%(?),合格等级符合设计要求。②?跨越通航河流
的燃气管道管底标高,应符合(?)的要求,管架外侧应设置护桩。③?在确定管道位置时,应与随桥敷设的其他可燃气体管道保持一定间距并
符合有关规定。④?管道应设置必要的(?)和(?)。⑤?过河架空的燃气管道向下弯曲时,向下弯曲部分与水平管夹角宜采用(?)
形式。⑥?对管道应做较高等级的防腐保护。对于采用阴极保护的埋地钢管与随桥管道之间应设置绝缘装置。8.燃气管道穿越河底时,应符合下
列要求:1)施工方案及设计文件应报(?)或(?)部门审查批准。工程开工时,应在敷设管道位置的两侧水体各(?)距离处设
警戒标志。2)燃气管道宜采用钢管,对焊缝进行100%(?)和100%(?)。3)燃气管道至规划河底的覆土厚度,应根据工程
等级和水流冲刷条件确定,对不通航河流不应小于(?);对通航河流不应小于(?),还应考虑疏浚和投锚深度。4)稳管措施应根据计算
确定。5)在埋设燃气管道位置的河流两岸上、下游应设立标志。第67页?共123页水平定向钻进铺管技术要点9.PE管热
熔焊接时禁止将SDR值不同的管材进行焊接。10.聚乙烯管材的连接在下列情况下应采用电熔连接:1)不同级别(PE80与
PE100);2)熔体质量流动速率差值≥0.5g/10min(190℃,5kg);3)焊接端部标准尺寸比(SDR:公称外径
与公称壁厚的比值)不同;4)公称直径小于90mm或壁厚小于6mm。11.向孔钻进施工要点:导向孔施工是工程的重要阶段
,它决定管道铺设的最终位置,其重要的施工环节是(?)。12.第一根钻杆入土钻进时,应采取(?)的方式。13.扩孔的目的是
将孔径扩大至能容纳所要铺设的生产管线大小要求,最终扩孔直径大小应根据地层条件和生产管道类型确定。1K415033燃气管网附属设备
安装要点1.要求介质单向流通的阀门有:(?)、(?)、(?)等。2.要求介质由下而上通过阀座的阀门有(?)等,其作用是为
了便于开启和检修。3.阀门手轮不得向下,避免仰脸操作;落地阀门手轮朝上,不得歪斜;在工艺允许的前提下,阀门手轮宜位于齐胸高,以便
于启阀;明杆闸阀不要安装在地下,以防腐蚀。4.安装时,与阀门连接的法兰应保持平行,其偏差不应大于法兰外径的(?),且不得大于
(?)。5.阀门安装前应做(?),不渗漏为合格,不合格者不得安装。6.补偿器作用是(?)。7.补偿器常安装在阀门的(?
)(按气流方向),利用其伸缩性能,方便阀门的拆卸和检修。8.安装应与管道同轴,不得偏斜;不得用补偿器变形调整管位的安装误差。
9.(?)作用是排除燃气管道中的冷凝水和石油伴生气管道中的轻质油。10.(?)是一种专门用来排放管道内部的空气或燃气的装置。1
K415034燃气管道功能性试验的规定1.燃气管道在安装过程中和投入使用前应进行管道功能性试验,必须进行(?)、(?)和(
?)。进行强度试验和严密性试验时,所发现第68页?共123页的缺陷必须待试验压力降至大气压后方可进行处理,处理后应重新
进行试验。2.管道及其附件组装完成并在(?),应按设计要求进行气体吹扫或清管球清扫。气体吹扫每次吹扫管道的长度不宜超过(?)
,管道长度超过(?)时宜分段吹扫。吹扫压力不得大于管道的设计压力,且不应大于(?)。气体流速宜大于20m/s。吹扫球应按
(?)方向进行,以避免补偿器内套筒被破坏。吹扫结果可用贴有纸或白漆的木靶板置于吹扫口检查,5min内靶上无铁锈脏物则认为合格。
3.管道应分段进行压力试验,试验管道分段最大长度为:气压试验4.当管道设计压力≤0.8MPa时,试验介质应为(?),试验
压力为设计压力的(?),但不得低于(?),当压力达到规定值后,应稳压(?),然后用(?)对管道接口进行检查,全部接口均(?
)现象认为合格。水压试验5.当管道设计压力>0.8MPa时,试验介质应为(?),试验压力不得低于(?)。6.试验压力应
逐步缓升,首先升至试验压力的(?),应进行初检,如无泄漏、异常,继续升压至(?),然后宜稳压(?)后,观察压力计不应少于
(?),(?)为合格。7.强度试验合格、管线全线回填后,进行(?)试验。严密性试压压力应满足下列要求1)设计压力<5k
Pa时,试验压力为20kPa。2)设计压力≥5kPa时,试验压力为设计压力的(?),且不得低于(?)。8.埋设燃气
管道的沿线应连续敷设警示带;并平整地敷设在管道的正上方且距管顶的距离宜为(?);但不得敷设于路基和路面里。第69页?共1
23页1K420130城市管道工程质量检查与验收1K420132城市燃气、供热管道施工质量检查与验收1.管道安装是管道工
程施工的重要工序,主要包括下管、组对、连接。管道安装应按“(?)、(?),(?)、(?),(?)、(?)”的原则,有计划分步骤进行
。2.两相邻管道连接时,纵向焊缝或螺旋焊缝之间的相互错开距离不应小于(?),不得有(?);同一管道上两条纵向焊缝之间的距离不
应小于(?)。3.管道(?)不得置于建筑物、闸井(或检查室)的墙壁或其他构筑物的结构中。管道支架处不得有(?)。
设在套管或保护性地沟中的管道(?),应进行100%的(?)检测。4.当存在下列任一情况且未采取有效的防护措施时,严禁进行
焊接作业:①?焊条电弧焊时风速大于8m/s(相当于5级风);②?气体保护焊时风速大于2m/s(相当于2级风);
③?相对湿度大于90%;④?雨、雪环境。5.热熔对接连接完成后,对接头进行100%的卷边对称性和接头对正性检验,应对开挖敷
设不少于(?)的接头进行卷边切除检验,水平定向钻非开挖施工进行100%的接头卷边切除检验。6.焊缝内部质量检查的方法主要
有(?)检测和(?)检测。7.对检验不合格的焊缝必须返修至合格,但同一部位焊缝的返修次数不得超过(?)。8.管道防腐前
应逐根进行外观检查和测量,具体项目包括:(?)、(?)、(?)、(?)。9.防腐前应对防腐原材料进行检查,具体包括(?)或
(?)、(?)、(?)、(?)。10.阴极保护主要检查(?)、(?)、(?)、(?)和(?)是否符合设计要求,被保护体的
保护电位指标是否符合设计要求和标准规定。11.保温材料的(?)、(?)、容重(密度)、(?)、(?)、(?)等性能指标
应符合设计要求或规范的规定,直埋保温管聚乙烯外护管的力学性能应符合设计要求。第70页?共123页1K420133柔性
管道回填施工质量检查与验收1.柔性管道是指在结构设计上需考虑管节和管周土体共同承担荷载的管道,在市政公用工程中通常指采用(?)
、(?)和(?)(塑料)等管材敷设的管道。2.回填前,检查管道有无损伤及变形,有损伤管道应修复或更换;管内径大于(?)
的柔性管道,回填施工中应在管内设(?)。中小管道应采取防止管道移动的措施。3.现场试验段长度应为一个井段或不少于(?),按
设计要求选择回填材料,特别是管道周围回填需用的(?);按照施工方案的回填方式进行现场试验,以便确定压实机具(械)和施工参
数;因工程因素变化改变回填方式时,应重新进行现场试验。4.管道两侧和管顶以上(?)范围内的回填材料,应由沟槽两侧对称运入槽内
,不得直接扔在管道上;回填其他部位时,应均匀运入槽内,不得集中推入。5.同一沟槽中有双排或多排管道的基础底面位于同一高程时,管道
之间的回填压实应与管道与槽壁之间的回填压实(?)进行。6.柔性管道回填至设计高程时应在(?)内测量并记录管道变形率。7.
变形率应符合设计要求,设计无要求时:(1)钢管或球墨铸铁管道:(?)<变形率<(?)时。化学建材管道:(?)<变形率<
(?)。(2)钢管或球墨铸铁管道的变形率超过(?)时,化学建材管道变形率超过(?)时,应挖出管道,并会同设计研究处理。1K4
15040城市综合管廊1K415041综合管廊工程结构类型和特点1.综合管廊工程建设应以综合管廊工程规划为依据,遵循“(?)
、(?)、(?)、(?)”的原则。2.综合管廊分为干线综合管廊、支线综合管廊、缆线综合管廊。干线综合管廊支线综合管廊缆线综合管廊
用于容纳城市主干工程管线,采用独立分舱方式建设。宜设置在机动车道、道路绿化带下面。用于容纳城市配给工程管线,采用单舱或双舱方式建设
。宜设置在道路绿化带、人行道或非机动车道下。设有可开启盖板但其内部空间不能满足人员正常通行要求,用于容纳电力电缆和通信线缆。宜设置
在人行道下。第71页?共123页3.(?)管道应在独立舱室内敷设。4.热力管道采用(?)介质时应在独立舱室内敷
设。5.热力管道不应与(?)同仓敷设。6.110kV及以上电力电缆不应与(?)同侧布置。7.进入综合管廊的排水管道应
采取(?)制,雨水纳入综合管廊可利用结构本体或采用管道方式;污水应采用(?)排水方式,宜设置在综合管廊(?)。8.综合
管廊的结构设计使用年限为(?),结构安全等级为一级。1K415042综合管廊工程施工方法选择1.综合管廊主要施工方法主要有
(?)、(?)、(?)和(?)等。2.新城区一般采用(?)法施工;城市老(旧)城区综合管廊建设宜结合地下空间开
发、旧城改造、道路改造、地下主要管线改造等项目同步进行,宜采用(?)法和(?)法施工;当场地条件受限时可采用(?)法、(
?)法等方法施工。1K415043综合管廊工程施工技术1.综合管廊工程中所使用的主要材料宜采用(?)、(?)。当地基承载力
良好、地下水位在综合管廊底板以下时,可采用砌体材料。①?钢筋混凝土结构的混凝土强度等级不应低于(?)。预应力混凝土结构的混凝土强
度等级不应低于(?)。②?砌体结构所用的石材强度等级不应低于MU40,并应质地坚实,无风化削层和裂纹;砌筑砂浆强度等级应符合设
计要求,且不应低于M10。2.混凝土底板和顶板,应连续浇筑不得留有(?)。设计有变形缝时应按变形缝分仓浇筑。3.预制构件安
装前,应复验合格。当构件上有裂缝且宽度超过(?)时,应进行鉴定。4.综合管廊两侧回填应对称、分层、均匀。管廊顶板上部(?)
范围内回填材料不得使用重型及振动压实机械碾压。第72页?共123页1K416000生活垃圾处理工程1K416010
生活垃圾填埋处理工程施工1K416011生活垃圾填埋场填埋区结构特点1.防渗系统结构可分为(?)和(?)。(?)基本
结构包括(?)、(?)及(?)和(?)。(?)基本结构包括(?)、(?)、(?)、(?)和(?)。应根据需要设置地下
水导排系统和反滤层。单层防渗系统结构形式如图1K416011所示。1K416012生活垃圾填埋场填埋区防渗层施工技术1.防
渗层是由透水性小的防渗材料铺设而成,(?)、(?)、(?)是防渗材料选择的依据。目前,常用的有四种:(?)、(?)、(?)、(?
)。2.泥质防水层施工技术的核心是(?)的拌合土层施工技术。3.一般情况下,泥质防水层施工程序见图1K416012-1。
第73页?共123页4.拌合(?)、(?)及碾压(?)5.应在操作过程中确保掺加膨润土数量准确,拌合均匀,机
拌不能少于2遍,含水量最大偏差不宜超过(?),振动压路机碾压控制在4~6遍,碾压密实。6.应严格按照合同约定的检验
频率和质量检验标准同步进行,检验项目包括(?)和(?)两项。7.用于垃圾填埋场防渗系统工程的膨润土防水毯应使用(?),可
选用天然钠基膨润土防水毯或人工钠基膨润土防水毯。8.应根据防渗要求选用粉末型膨润土防水毯或颗粒型膨润土防水毯,防渗要求高的工程中
应优先选用(?)。9.膨润土防水毯(?)在雨雪天气下施工。10.膨润土防水毯施工应符合下列规定:1)应自然与基础层贴实
,不应折皱、悬空;2)应以(?)分布,不得出现(?);3)边坡施工应沿坡面铺展,边坡不应存在水平搭接。11.施工时,卷
材宜绕在刚性轴上,借挖土机、装载机结合专用框架起吊铺设,应铺放平整无折皱,不得在地上拖拉,不得直接在其上行车;当边坡铺设膨润土防水
毯时,严禁(?)。坡顶处材料应埋入(?)锚固。12.膨润土防水毯的连接应符合下列规定:1)现场铺设的连接应采用(?)。
2)膨润土防水毯及其搭接部位应与基础层贴实且无折皱和悬空。3)搭接宽度为(?)。4)局部可用(?)密封。5)坡面铺设
完成后,应在底面留下不少于(?)的膨润土防水毯余量。13.双缝热熔焊接采用(?)焊接。14.单缝挤压焊接采用(?)
焊接,主要用于糙面膜与糙面膜之间的连接、各类修补和双轨热熔焊机无法焊接的部位。15.非破坏性检测技术:(?)、(?)、(?)。1
6.真空检测是传统的老方法,即在HDPE膜焊缝上涂(?),罩上五面密封的真空罩,用真空泵抽真空,当真空罩内气压达到25-
35KPa时焊缝无任何泄露视为合格。挤压焊接所形成的单轨焊缝,应采用(?)法检测。17.HDPE膜挤压焊缝的(?)等效
于真空检测,适用于地形复杂的地段。在挤压焊缝中预先埋设一条细铜线,利用35KV的高压脉冲电源探头在距离焊缝10-30mm第
74页?共123页的高度探扫,无火花出现视为合格,出现火花的部位说明有漏洞。18.HDPE膜焊缝强度的破坏性取样检测,
每个试样裁取10个25.4mm宽的标准试件,分别做5个(?)和5个(?)。19.HDPE膜铺设时应符合下列
要求:①?铺设应一次展开到位,不宜展开后再拖动。②?应为材料(?)导致的尺寸变化留出伸缩量。③?应对膜下保护层采取适当的防水、
排水措施。④?应采取措施防止HDPE膜受风力影响而破坏。⑤?HDPE膜铺设过程中必须进行(?)和(?)。监理必须全程监
督膜的焊接和检验。⑥?施工中应注意保护HDPE膜不受破坏,车辆(?)在HDPE膜上碾压。20.为保证填埋场基底构建面
不被雨水冲坏,填埋场HDPE膜铺设总体顺序一般为“(?)”。21.HDPE膜冬期(?)铺设。22.每个焊接人员和焊接设
备每天在进行生产焊接之前应进行(?)。23.试验性焊接完成后,割下3块25.4mm宽的试块,测试(?)和(?)。24
.在试焊样品上标明样品编号、焊接人员编号、焊接设备编号、(?)、(?)、(?)、(?)、(?)和测试结果;并填写HDPE膜
试样焊接记录表,经现场监理和(?)人签字后存档。1K416013生活垃圾填埋场填埋区导排系统施工技术1.渗沥液收集导排系统
施工主要有(?)、(?)、(?)等施工过程。2.摊铺导排层、收集渠码砌均采用(?)施工。3.HDPE渗沥液收集花管连接一
般采用(?)。热熔焊接一般分为五个阶段:(?)、(?)、(?)、(?)、(?)。1K416014垃圾填埋与环境保护技术1.因
为垃圾填埋场的使用期限很长,达(?)以上,因此应该慎重对待垃圾填埋场的选址,注意其对环境产生的影响。2.垃圾填埋场的选址,应
考虑(?)、地理水文、(?)、(?)等因素,位置选择得好,直接体现在投资成本和社会环境效益上。第75页?共123页
3.垃圾填埋场(?)远离饮用水源,尽量少占良田,利用荒地和当地地形。4.生活垃圾填埋场应设在当地(?)。5.生活垃圾填
埋场不得建在下列地区(1)生活饮用水水源保护区,供水远景规划区。(2)洪泛区和泄洪道。(3)尚未开采的地下蕴矿区和岩溶发育区
。(4)自然保护区。(5)文物古迹区,考古学、历史学及生物学研究考察区。第76页?共123页1K417000施工
测量与监控量测1K417010施工测量1K417011施工测量主要内容与常用仪器1.施工测量以(?)和(?)为依据,
是保障工程施工质量和安全的重要手段。2.作业人员应遵循“(?),(?)”的原则。3.(?)为市政工程的验收、运行管理及设施扩建
改造提供了基础资料。4.施工测量前,应依据(?)、(?)和(?),编制施工测量方案。5.全站仪是一种采用红外线自动数字显
示(?)和(?)的测量仪器。6.常用的经纬仪主要有光学经纬仪和电子经纬仪,一般用来测量(?)和(?)。7.光学水准
仪现场施工多用来测量构筑物(?)和(?),适用于施工控制测量的控制网水准基准点的测设及施工过程中的高程测量。8.激光准直
(指向)仪,现场施工测量用于角度坐标测量和定向准直测量,适用于长距离、大直径隧道或桥梁墩柱、水塔、灯柱等高耸构筑物控制测量的
点位坐标的传递及(?)找正测量。9.全球定位GPS技术系统通过空间部分、地面控制部分与用户接收端之间的实时差分解算出待测点
位的三维空间坐标。10.陀螺全站仪是由(?)、(?)和(?)组合而成的一种定向用仪器。1K417012场区控制测量1.
市政公用工程现场可分为(?)、(?)两种形式,施工控制测量应依据工程特点和实际需要,在施工现场范围内建立测量控制网,选择若干
有控制意义的点(称为控制点),按一定的规律和要求构成网状几何图形(称为控制网)。控制网分为(?)和(?),场区控制
网按类型分为(?)、(?)和(?)等。2.(?),多用于场地平整的大型场区控制;(?),多用于建筑场地在山区的施工控制网;导
线测量控制网,多用于扩建或改建的施工区,新建区也可以采用(?)建网。3.根据施工方案和场区构筑物特点及设计要求的施测精度,编
制工程(?)。第77页?共123页4.施工单位应在(?)基础上进行现场踏勘、复核。1K417013竣工图编绘
与实测1.竣工总图编绘完成后,应经(?)、(?)审核、会签。2.竣工图的比例尺,厂区宜选用(?),线状工程宜选用(?);
坐标系统、高程基准、图幅大小、图上注记、线条规格应与原设计图一致。3.当平面布置改变超过图上面积(?)时,不宜在原施工图上修
改和补充,应重新绘制竣工图。1K417020监控量测1K417021监控量测主要工作1.当开挖基坑为以下情况时,需实施基坑监
测:1)基坑设计安全等级为(?)的基坑。2)开挖深度大于或等于(?)的下列基坑:土质基坑、极软岩基坑、破碎的软岩基坑、
极破碎的岩体基坑;上部为土体,下部为极软岩、破碎的软岩、极破碎的岩体构成的土岩组合基坑。3)开挖深度小于(?)但现场地质情况
和周围环境较复杂的基坑。2.现场监测的对象包括:支护结构;(?);(?);周边环境中的被保护对象,包括周边建筑、管线、轨道交通、
铁路及重要的道路等;其他应监测的对象等。3.基坑变形监测周期应根据施工进程确定;当开挖速度或降水速度加快引起变形速率增大时,应增
加观测次数;当变形量接近预警值或有事故征兆时,应持续观测。4.当基坑工程的监测方案存在变形量接近预警值情况时,需进行专项论证:1
)(?)。第78页?共123页2)(?)。3)(?)。4)(?)。1K417022监控量测方法第79页?共1
23页1K420000市政公用工程项目施工管理1K420010市政公用工程施工招标投标管理1K420011招标投标管理1
.工程施工招标分为(?)和(?):2.资格审查分为(?)和(?)。3.投标文件应当对招标文件提出的(?)要求
和条件作出响应。4.投标文件通常由(?)、(?)、(?)等组成。5.经济部分:(?);(?);(?)。6.投标保证金一般
不得超过投标估算价的(?)。投标保证金有效期应当与投标有效期一致。提交人所有投标人中标人额度有效期投标保证金履约保证金≤估算价
2%开标→签订合同≤中标合同价10%开工→竣工1K420012招标条件与程序1.符合公开招标条件,有下列情形之一的,经批准可
以进行邀请招标:(1)项目技术复杂或有特殊要求,只有少量几家潜在投标人可供选择的;(2)受自然地域环境限制的;(3)涉及国家
安全、国家秘密或者抢险救灾,适宜招标但不宜公开招标的;(4)拟公开招标的费用与项目的价值相比,不值得的;(5)法律、法规规定不
宜公开招标的。2.招标人应当自收到评标报告后之日起(?)内公示中标候选人,公示期不得少于(?)。3.如果出现前三名中标候
选人均放弃中标资格或未遵循招标文件要求被取消中标资格的,招标人应(?)。4.招标人应在接到评标委员会的书面评标报告并公示期满后
(?)内,依据推荐结果确定排名第一中标人,并发出中标通知书。5.中标通知书发出(?)内双方签订合同文件。第80页?
共123页1K420020市政公用工程造价管理1K420022施工图预算的应用1.(?)是指分部分项工程单价为直接工程
费单价。2.我国目前推行的建设工程工程量清单计价其实就是部分费用综合单价,单价中未包括(?)、(?)和(?)。所以在工程施
工图预算编制中必须考虑这部分费用在计价、组价中存在的风险。1K420023工程量清单计价的应用1.使用国有资金投资的建设工程,
必须采用(?)计价。2.措施项目中的(?)必须按国家或省级、行业建设主管部门的规定计算,不得作为竞争性费用。3.《清单计
价规范》规定,建设工程发承包及实施阶段的工程造价应由(??)、(?)、(?)、(?)和(?)组成。4.招标文件中的工程
量清单标明的工程量是投标人投标报价的共同基础,竣工结算的工程量按发、承包双方在合同中约定应予计量且实际完成的工程量确定。5.(?)
和(?)应按国家或省级、行业建设主管部门的规定计算,不得作为竞争性费用。6.因工程量清单漏项或非承包人原因造成的工程变更,
造成增加新的工程量清单项目,其对应的综合单价按下列方法确定:1)(?);2)(?);3)(??)。7.分部分项工程量清单缺项、非
承包人原因的工程变更,引起措施项目发生变化,造成施工组织设计或施工方案变更,原措施费中已有的措施项目,按原有措施费的组价方法调整;
原措施费中没有的措施项目,由承包人根据措施项目变更情况,提出适当的措施费变更,经发包人确认后调整。8.因不可抗力事件导致的费用,
发、承包双方应按以下原则分担并调整工程价款:1)工程本身的损害、因工程损害导致第三方人员伤亡和财产损失以及运至施工现场用于施工的
材料和待安装的设备的损害,由发包人承担;2)发包人、承包人人员伤亡由其所在单位负责,并承担相应费用;第81页?共123
页3)承包人施工机具设备的损坏及停工损失,由承包人承担;4)停工期间,承包人应发包人要求留在施工现场的必要的管理人员及保卫人
员的费用,由发包人承担;5)工程所需清理、修复费用,由发包人承担。1K420030市政公用工程合同管理1K420031合同履
约与管理要求1.承包方根据施工合同,向监理工程师提出变更申请;监理工程师进行审查,将审查结果通知承包方。(?)向承包方提出变更
令。1K420032工程索赔的应用1.承包方必须掌握有关法律政策和索赔知识,进行索赔须做到:(1)有正当索赔理由和充分证据;
(2)索赔必须以合同为依据,按施工合同文件有关规定办理;(3)准确、合理地记录索赔事件并计算索赔工期、费用。2.索赔事件发生
(?)内,向监理工程师发出索赔意向通知。合同实施过程中,凡不属于承包方责任导致项目拖延和成本增加事件发生后的(?)内,必须
以正式函件通知监理工程师,声明对此事件要求索赔,同时仍需遵照监理工程师的指令继续施工,逾期提出时,监理工程师有权拒绝承包方的索赔要
求。3.发出索赔意向通知后,承包方应抓紧准备索赔的证据资料,包括事件的原因、对其权益影响的资料、索赔的依据,以及其他计算出该事件
影响所要求的索赔额和申请工期延期的天数,并在(?)内向监理工程师提交索赔申请报告及有关资料。4.监理工程师在收到承包方送交的
索赔报告和有关资料后,在(?)内给予答复,或要求承包方进一步补充索赔理由和证据。监理工程师在(?)内未给予答复或未对承包方
作进一步要求,视为该项索赔已经认可。5.当索赔事件持续进行时,承包方应当阶段性地向监理工程师发出索赔意向通知,在索赔事件终了后
(?)内,向监理工程师提出索赔的有关资料和最终索赔报告。6.施工过程中主要是工期索赔和费用索赔。施工过程中主要是工期索赔和费用
索赔可补偿内容序号主要内容工期费用利润原因分析第82页?共123页123456延期图纸恶劣气候条件√√√√√√发包人责
任不可抗力工程变更√√√√√发包人责任发包人责任发包人责任发包人责任承包方能力不可预见外部环境监理工程师指令迟延或错误7.索赔台
账应反映索赔发生的原因,索赔发生的时间、索赔意向提交时间、索赔结束时间,索赔申请工期和费用,监理工程师审核结果,发包方审批结果等内
容。1K420040市政公用工程施工成本管理1K420041施工成本管理的应用1.(?)是项目管理的核心。2.施工成本管理
的基本流程:(??)。1K420043施工成本核算与分析1.成本分析的方法:(?);(?);(?);(?)。1K420050
市政公用工程施工组织设计1K420051施工组织设计编制的注意事项1.施工组织设计应由(?)主持编制,且必须经(?)批
准,并加盖企业公章后方可实施,有变更时要及时办理变更审批。2.施工组织设计编制流程:施工组织设计应由(?)主持编制,(?)负
责编制,经项目负责人签字批准后;上报(?);报监理单位(?)和(?)审批后方可实施;施工单位施工过程中如发生变更,应及时
办理变更审批手续。3.施工保证措施:进度保证措施;质量保证措;安全管理措施;环境保护及文明施工管理措施;成本控制措施;季节性施工
保证措施;交通组织措施;建(构)筑物及文物保护措施;应急措施。第83页?共123页1K420053专项施工方
案编制与论证的要求1.(?)应当在危险性较大的分部分项工程施工前编制专项方案;对于超过一定规模的危险性较大的分部分项工程,(?)
应当组织专家对专项方案进行论证。2.超过一定规模的危险性较大的分部分项工程范围1)深基坑工程开挖深度超过(?)(含(?)
)的基坑(槽)的土方开挖、支护、降水工程。2)模板工程及支撑体系①?各类工具式模板工程:包括(?)、(?)、(?)、
(?)等工程。②?混凝土模板支撑工程:搭设高度(?)及以上,或搭设跨度(?)及以上,或施工总荷载(设计值)(?)
及以上,或集中线荷载(设计值)(?)及以上。③?承重支撑体系:用于钢结构安装等满堂支撑体系,承受单点集中荷载(?)及以
上。3)起重吊装及起重机械安装拆卸工程①?采用非常规起重设备、方法,且单件起吊重量在(?)及以上的起重吊装工程。②?起重量
(?)及以上,或搭设总高度(?)及以上,或搭设基础标高在(?)及以上的起重机械安装和拆卸工程。4)脚手架工程①?搭设高
度(?)及以上的落地式钢管脚手架工程。②?提升高度在(?)及以上的附着式升降脚手架工程或附着式升降操作平台工程。③?分段架
体搭设高度(?)及以上的悬挑式脚手架工程。5)拆除工程①?码头、桥梁、高架、烟囱、水塔或拆除中容易引起有毒有害气(液)
体或粉尘扩散、易燃易爆事故发生的特殊建、构筑物的拆除工程。②?文物保护建筑、优秀历史建筑或历史文化风貌区影响范围内的拆除工程。6
)暗挖工程采用矿山法、盾构法、顶管法施工的隧道、洞室工程。7)其它①?开挖深度(?)及以上的人工挖孔桩工程。②?水下作业工
程。③?重量1000kN及以上的大型结构整体顶升、平移、转体等施工工艺。④?采用(?)、(?)、(?)、(?)可能影响工程
施工安全,尚无国家、行业及地方技术标准的分部分项工程。第84页?共123页3.施工单位应当在危大工程施工前组织工程技
术人员编制专项施工方案。4.实行施工总承包的,专项施工方案应当由施工(?)组织编制。危大工程实行分包的,专项施工方案可以由相
关专业分包单位组织编制。5.专项施工方案应当由施工(?)审核签字、加盖单位公章,并由(??)审查签字、加盖执业印章后方可
实施。6.专家应当从专家库选取,符合专业要求且人数不得少于(?)。与本工程有利害关系的人员不得以专家身份参加专家论证会。7.
专家论证的主要内容(1)专项方案内容是否完整、可行。(2)专项方案计算书和验算依据、施工图是否符合有关标准规范。(3)专项施
工方案是否满足现场实际情况,并能够确保施工安全。1K420060市政公用工程施工现场管理1K420061施工现场布置与管理的要
点1.合理组织运输,保证场内道路畅通,运输方便,各种材料能按计划分期分批进场,避免二次搬运,充分利用场地。2.施工现场临时设施
应将生活区、施工区、办公区分开布置,应方便生产和生活,办公用房靠近施工现场,福利设施应在生活区范围之内。3.施工现场围挡(墙
)应沿工地四周连续设置,不得留有缺口,并根据地质、气候、围挡(墙)材料进行设计与计算,确保围挡(墙)的稳定性、
安全性。4.围挡的用材应坚固、稳定、整洁、美观,宜选用砌体、金属材板等硬质材料,不宜使用彩布条、竹篱笆或安全网等。5.施工现场
的围挡一般应不低于(?),在市区内应不低于(?),且应符合当地主管部门有关规定。6.施工现场应当有固定的出入口,出入口处应设
置大门。7.施工现场的大门应牢固美观,大门上应标有企业名称或企业标识。8.施工现场的进口处应有整齐明显的“五牌一图”。五牌:(
?)、(?)、(?)、(?)、(?);一图:(?)。9.文明施工承诺牌主要内容是文明施工承诺:(?)、(?)、(?)、(?)、(
?)、(?)。第85页?共123页10.工程概况牌一般应写明工程名称、主要工程量、建设单位、设计单位、施工单位、监理
单位、开竣工日期、项目负责人(经理)以及联系电话。11.根据国家有关规定,施工现场入口处、施工起重机械、临时用电设施、脚
手架、出入通道口、楼梯口、电梯井口、孔洞口、桥梁口、隧道口、基坑边沿、爆破物及有害危险气体和液体存放处等属于危险部位,应当设置明显
的安全警示标志,必要时设置重大危险源公示牌。12.施工现场应具有良好的(?),设置排水沟及沉淀池,现场废水未经允许不得直接排入
市政污水管网和河流。13.道路应当中间起拱,两侧设排水设施,主干道宽度不宜小于(?),载重汽车转弯半径不宜小于(?),如因
条件限制,应当采取措施。1K420062环境保护管理的要点1.为减少扬尘,施工场地的主要道路、料场、生活办公区域应按规定进行硬
化处理;裸露的场地和集中堆放的土方应采取覆盖、固化、绿化、洒水降尘措施。2.使用密闭式防尘网对在建建筑物、构筑物进行封闭。拆除旧
有建筑物时,应采用隔离、洒水等措施防止施工过程扬尘。3.施工现场应设置密闭式垃圾站,施工垃圾、生活垃圾应分类存放,并及时清运出场
;施工垃圾的清运,应采用专用封闭式容器吊运或传送,严禁凌空抛撒。4.从事土方、渣土、砂石、灰浆和施工垃圾等散装、流体物料运输的车
辆应采用密闭或覆盖措施,现场出入口处应采取保证车辆清洁的措施;设专人清扫社会交通路线。5.施工场地应设置排水沟及沉淀池,污水、泥
浆必须防止泄露外流污染环境;按照规定排入市政污水管道或河流,泥浆应采用专用罐车外弃。6.对因生产工艺要求或其他特殊需要,确需在
22时-次日6时期间进行强噪声施工的,施工前(?)和(?)应到有关部门提出申请,经批准后方可进行夜间施工,并协同
当地居委会公告附近居民。7.运送车辆不得装载过满。车辆出场前设专人检查,在场地出口处设置(?),待土方车出口时将车轮冲洗干净;
安排专人对土方车辆行驶路线进行检查,发现遗撒及时清扫。1K420063劳务管理的有关要点1.劳务企业要与劳务人员依法签订(?
),应将劳务人员花名册、身份证、劳动合同文本、岗位技能证书复印件报总包方项目部备案,并确保人、册、证、合同、证第86页?共
123页书相符统一。(?)、(?)、(?)的“三无”人员不得进入现场施工。1K420080市政公用工程施工质量管理1K42
0081质量计划编制注意事项1.质量计划应由施工(?)主持编制,(?)负责审核并报企业相关管理部门及(?)批准并得到
监理单位认可后实施。2.质量控制流程:实施(?)、(?)、(?)的“三检制”流程。1K420082质量计划实施要点1.总
承包人就工程施工质量和质量保修工作向发包人负责。分包工程的质量由分包方向总包方负责。总包方就分包方的工程质量向发包方承担(?)。
分包方应接受总包方的质量管理。1K420083施工准备阶段质量管理措施1.建立以(?)为第一责任人的管理组织机构和质量管理
体系,明确各级岗位责任制及职能分工。2.(?)负责提供完整的通过审查的施工图纸、地质勘察报告等相关技术资料,施工项目部收集整理,
指定专人管理并公布有效件清单。3.图纸会审。(?)负责组织并记录,设计单位对图纸内容及相关问题进行交底。1K420140市政
公用工程施工安全管理1K420141施工安全风险识别与预防措施1.按照企业职工伤亡事故分类标准,我国将职业伤害事故分成20
类,主要有:物体打击、车辆伤害、机械伤害、起重伤害、触电、淹溺、灼烫、火灾、高处坠落、坍塌、冒顶片帮、透水、放炮、火药爆炸、瓦斯爆
炸、锅炉爆炸、容器爆炸、其他爆炸、中毒和窒息以及其他伤害。其中高处坠落、物体打击、触电、机械伤害、坍塌、中毒和窒息、火灾是市政公用
工程施工项目最常见的职业伤害事故。2.影响施工安全生产的因素主要有:施工中(?)、(?第87页?共123页?)、(
?)。项目部应从人、物、环境和管理等方面采取有针对性的控制,把好安全生产“六关”,即(?)、(?)、(?)、(?)、(?)、(?
)。1K420142施工安全保证计划编制和安全管理要点1.(?):是项目工程安全生产第一责任人,负全面领导责任。2.(?):对项
目的安全生产负技术责任。3.(?):负责安全生产,并进行现场监督检查;发现安全事故隐患,应当及时向项目负责人和安全生产管理机构报告
;对于违章指挥、违章作业的,应当立即制止。4.安全技术交底是法定管理程序,必须在施工作业前进行。安全技术交底应留有书面材料,由
(?)、(?)、(?)进行签字确认。1K420150明挖基坑施工安全事故预防1K420151防止基坑坍塌、淹埋的安全措施1.
有降水或排水条件的工程,宜在采用降水或排水措施后再对围护缺陷进行修补处理。围护结构缺陷造成的渗漏一般采用下面方法处理:(????
?????????????????????????????????????????????????????????????????
?????????????????????????????????????????????????????????????????
??????????????????)。2.基坑支护结构出现变形过大或较为危险的“踢脚”变形时,可以采用(?),适当增加(?
)或(?),被动土压区(?)或(?)等处理措施。第88页?共123页1K420190市政公用工程竣工验收
与备案1K420191工程竣工验收要求1.检验批及分项工程应由(?)组织施工单位项目专业质量(技术)负责人等进行验
收。2.分部工程(子分部)应由(?)组织施工单位项目负责人和项目技术、质量负责人等进行验收;对于涉及重要部位的地基与
基础、主体结构、主要设备等分部(子分部)工程,其(?)、(?)工程项目负责人也应参加验收。3.单位工程完工后,(?)
应组织有关人员进行自检,总监理工程师应组织各专业监理工程师对工程质量进行竣工(?),对存在的问题,应由施工单位及时整改。整改完毕
后,由(?)向(?)提交工程竣工报告,申请工程竣工验收。4.建设单位收到工程竣工验收报告后,应由(?)(项目)负
责人组织施工(含分包单位)、设计、勘察、监理等单位(项目)负责人进行单位工程验收。1K420192工程档案编制要求1
.总承包工程项目,由(?)负责汇集,并整理所有有关施工资料;分包单位应主动向总承包单位移交有关施工资料。1K420193工
程竣工备案的有关规定1.(?)应当自工程竣工验收合格之日起(?)内,提交竣工验收报告,向工程所在地县级以上地方人民政府建设行
政主管部门(备案机关)备案。2.市政监督管理部门,应在竣工验收之日起(?)个工作日内,向备案机关提交工程质量监督报告
。3.工程竣工验收报告由(?)提交。4.质量报告:勘察单位(?)。设计单位(?)。施工单位(?)。5.监理单位(?
)报告:由监理单位对工程施工质量进行评估,并经(?)和有关负责人审核签字。第89页?共123页考点汇总(参考答
案)1K410000市政公用工程技术1K411000城镇道路工程1K411010城镇道路工程结构与材料1K411011城
镇道路分类与分级1.快速路;主干路;次干路;支路2.交通功能3.交通功能4.服务功能6.沥青混凝土;沥青贯入式;沥青表面
处治;沥青混凝土;支路;停车场;钢纤维;各交通等级道路7.弯沉变形较大;抗弯强度小;极限垂直变形;弯拉应变;抗弯拉强度大;弯沉变
形很小;极限弯拉强度;水泥混凝土路面1K411012沥青路面结构组成特点1.面层;基层、;路基2.减弱;强度;刚度;稳定性
;降低;自上而下3.反射裂缝4.土方;石方;特殊土5.高液限黏土;高液限粉土;石灰;水泥6.粗粒土或低剂量石灰;水泥稳定细
粒土7.道路交通等级;路基抗冲刷能力;排水基层9.整体稳定性;变形量控制10.承重层;竖向力12.承载能力;平整度;温度稳
定性;抗滑能力;噪声量13.OGFC;密级配沥青混合料1K411013水泥混凝土路面构造特点1.路基;垫层;基层;面层2.垫
层第90页?共123页3.小于;排水垫层;半刚性垫层4.150mm5.唧泥;板底脱空;错台;路基不均匀冻胀6.道
路交通等级;路基抗冲刷能力7.300mm;500mm;650mm8.强度;耐久性9.路面宽度;4.5m10.传力杆;胀缝11
.90°;配筋补强12.刻槽;压槽;拉槽;拉毛13.不得直接14.复试15.20mm;树脂类;橡胶类;聚氯乙烯胶泥类;改性沥
青类1K411014沥青混合料的组成与材料1.AC;骨架-密实结构;SMA2.A级;B级;煤沥青3.粘结性;感温性;
耐久性;塑性;安全性4.4级;3级5.20%;天然砂6.粉煤灰1K411015沥青路面材料的再生应用1.粘结力2.沥
青的再生3.矿物油4.粘度;流变性质;表面张力;耐热化;耐候性5.马歇尔试验方法6.空隙率;矿料间隙率;饱和度;马歇尔稳定
度;流值7.车辙试验动稳定度;残留马歇尔稳定度;冻融劈裂抗拉强度比第91页?共123页1K411016不同形式挡土
墙的结构特点2.排水系统;泄水孔;反滤层;结构变形缝3.主动;被动1K411020城镇道路路基施工1K411021城镇道路
路基施工技术1.机械作业;人工配合2.挡土墙;路肩;边坡3.交通管理部门4.稳定性;安全性5.砌体;金属材板;竹篱笆;安
全网6.1.8m;2.5m7.警告区;上游过渡区;缓冲区;作业区;下游过渡区;终止区8.专职交通疏导员9.先地下;后地上;先
深后浅10.1:5;300mm;1.0m11.先轻后重;12t12.500mm13.石灰土;石灰粉煤灰砂砾14.压实度;弯沉
值1K411022城镇道路路基压实作业要点1.500mm2.预沉量值;压实机具;压实遍数;虚铺厚度;压实方式3.先轻后重;先
静后振;先低后高;先慢后快;轮迹重叠;4km/h4.1/4~1/31K411023岩土分类与不良土质处理方法1.天然含水量
较高;孔隙比大;透水性差;压缩性高;强度低2.表层处理法;换填法;重压法;垂直排水固结法3.换土法;强夯法;预浸法4.灰土桩
;水泥桩;加固;改良;换填;堆载预压第92页?共123页1K411030城镇道路基层施工1K411032城镇道路基
层施工技术石灰稳定土与水泥稳定土1.路拌2.原材料含水量变化;运输距离3.强制式4.3h5.5℃6.初凝前7.两侧向中心
;内侧向外侧;直槎8.厂拌;强制式拌合机拌制9.石灰、粉煤灰拌合均匀,再加入砂砾(碎石)和水均匀拌合10.200mm;
100mm11.先轻型;后重型12.薄层贴补13.沥青乳液;沥青下封层;7d15.离析;翻拌均匀16.换填;嵌缝料17.
5mm1K411033土工合成材料的应用1.加筋;防护;过滤;排水;隔离2.路堤加筋;减少路基与构造物之间的不均匀沉降;反射
裂缝3.抗拉强度;撕破强度;顶破强度;握持强度4.抗拉强度;网孔尺寸5.外观评定;弯沉值;洒布粘层油1K411040城镇道
路面层施工1K411041沥青混合料面层施工技术1.摊铺;压实成型;接缝3.54.100-300mm第93页?共12
3页5.两台;6m;10-20m;30-60mm;200mm6.0.5~1h;100℃7.2~6m/min8.钢丝
;路缘石;平石;导梁;平衡梁9.铺筑层厚度;气温;沥青混合料种类10.篷布11.初压;复压;终压;100mm12.1-2;外
侧向中心碾压;低处向高处;60-80m13.重型轮胎压路机;25t;振动压路机复压14.隔离剂;防粘结剂;柴油16.50℃1K
411042改性沥青混合料面层施工技术1.粘度;气候条件;10~20℃2.10℃;滴漏;24h;当天使用;随拌随用3.
履带式摊铺机;160℃4.1-3m/min5.自动找平;非接触6.150℃;90℃-120℃7.轮胎压路机;12t8.紧跟
;慢压;高频;低幅;不得采用轮胎压路机碾压,以防沥青混合料被搓擦挤压上浮,造成构造深度降低或泛油9.原材料;压实度;面层厚度;弯
沉值10.96%;95%;查试验记录11.钻孔;刨挖12.弯沉仪检测1K411043水泥混凝土路面施工技术1.经济性;弯拉
强度;工作性;耐久性2.3h;10h3.水胶比;坍落度;含气量;泌水率;湿密度4.钢模板;1m;木模板;50mm;0.8~
1m;15~30mm;0.5~0.8m第94页?共123页5.路面标高;、面板分块;胀缝;稳固;顺直;平整;
无扭曲;脱模剂;隔离剂;胶带;塑料薄膜6.垂直;胀缝板;传力杆7.4-6mm;1/3;70mm;1/4;60mm;25%-30%
8.低于9.喷洒养护剂;保湿覆盖;保湿膜;土工毡;麻袋;草袋;草帘;围水养护;保温养护;80%;14~21d10.40%;
完全达到设计弯拉强度且填缝1K411044城镇道路大修维护技术要点1.100mm2.反射裂缝3.应力消减层4.土工织物5.
换填基底材料;非开挖式基底处理;注浆填充脱空部位的空洞1K411045路面改造施工技术1.地质雷达;弯沉;取芯检测2.粘结
强度;早强补偿收缩3.位置;高程4.交通特性;环境保护;节能减排1K420090城镇道路工程质量检查与验收1K420091
无机结合料稳定基层施工质量检查与验收1.最佳含水率3.7d4.3h;6h5.7d7.基层压实度;7d无侧限抗压强度1K420
093水泥混凝土面层施工质量检查与验收1.三个月第95页?共123页2.海砂3.复试4.20mm;树脂;橡胶1
K420094冬、雨期施工质量保证措施1.搭雨棚2.截水沟3.2%-3%4.拌多少;铺多少;压多少;完成多少7.严禁;5
℃;6级8.粘层;透层;封层1K420095压实度的检测方法与评定标准压实度的测定1.环刀法;灌砂法2.钻芯法1K412
000城市桥梁工程1K412010城市桥梁结构形式及通用施工技术1K412011城市桥梁结构组成与类型1.传力装置2.伸
缩缝;桥头搭板;锥形护坡3.桥头搭板4.总跨径5.桥下净空高度;桥下线路路面至桥跨结构最下缘之间的距离6.5m7.梁式桥;
弯矩8.拱式桥;受压9.刚架桥10.悬索第96页?共123页1K412012模板、支架和拱架的设计、制作、安装
与拆除2.垫板;严禁被水浸泡3.护桩;警示灯5.2.5MPa6.芯模;不发生塌陷和裂缝7.先支后拆;后支先拆;横向应同时卸
落;纵向应对称;跨中向支座方向;悬臂端8.张拉前;预应力。1K412013钢筋施工技术1.钢种;等级;牌号;规格2.63.
原设计单位4.未经冷拉的热轧光圆钢筋;65MPa5.机械;2%;1%6.设计要求;钢筋长度7.2.5;5;5;108.中部
开始逐步向两端9.焊接;机械连接10.闪光对焊11.22mm;绑扎;绑扎12.电阻点焊13.埋弧压力焊;电弧焊14.最大
弯矩处;不得;受拉;25mm;Ⅰ级15.1/2;50mm;6mm;100mm;20mm;垫块1K412014混凝土施工技术1.1
50mm2.10;标准差未知。3.磨细矿渣粉;硅粉4.搅拌;运输;浇筑5.搅拌地点;浇筑地点;两次;浇筑地点;15min;搅
拌地点;黏聚性;保水性6.凝结速度;浇筑速度第97页?共123页7.二次快速搅拌8.严禁9.90min10.刚
度;稳定性;预埋件11.表面呈现浮浆;不出现气泡;不再沉落12.7d;14d;涂刷薄膜1K412015预应力混凝土施工技术1.
伸长值;6%2.强度;刚度;2mm3.隔离套管;电弧焊4.75%;分阶段;对称;交错5.压浆孔;溢浆孔;排气孔;排水孔6.
7d;15d;20d7.75%8.25m;两端;25m9.对称张拉;先中间;后上、下或两侧10.孔道压浆;水泥浆;30MPa1
1.48h;5℃;保温;35℃12.80%;30MP。13.75%。14.不宜;不得15.严禁16.氯离子;掺加阻锈剂;增加
保护层厚度;提高混凝土密实度17.预应力筋;预应力筋的管道18.619.砂轮锯;切断机;电弧20.灌浆孔1K412016桥
面防水系统施工技术1.80%2.节点;转角;排水口第98页?共123页3.5级4.3层;500mm5.展开方向
;运行方向;低处向高处;高处;低处6.胎体增强材料;顺桥面行车方向;最低;高处7.10-20℃;170℃;10-20℃8.含水
率;粗糙度;平整度9.外观质量10.粘结强度;涂料厚度11.外观质量12.3%;粘结强度;抗剪强度1K412017桥梁支座
、伸缩装置安装技术1.传力装置2.钢支座3.辊轴支座;橡胶支座;拉压支座4.平面位置;顶面高程5.二次浇筑6.伸缩缝7
.24h8.1m9.重合1K412020城市桥梁下部结构施工1K412021各类围堰施工要求1.0.5-0.7m2.上游开
始至下游3.钢板桩4.止水材料;上游向下游合龙5.射水下沉6.承载力;刚度;稳定性;焊接质量检验;水密性试验第99页?
共123页1K412022桩基础施工方法与设备选择1.钢管桩2.锤击沉桩3.射水沉桩;射水沉桩4.试桩;沉桩试验
;监理及设计5.焊接;法兰;机械6.中间向两个方向或四周对称;先深后浅;先大后小;先长后短7.桩端设计标高;贯入度8.贯入
度发生巨变;地面隆起;桩身上浮8.泥浆护壁成孔;干作业成孔;沉管成孔灌注桩;爆破成孔9.护壁;携渣;润滑;冷却10.高塑性黏
土;膨润土11.2m;0.3m12.1.10;2%;黏度13.100mm;300mm14.4~5m15.跳挖方式16.2.5
m;25m17.护壁的厚度;拉结钢筋;配筋;50mm;速凝剂;24h;5MPa18.4h19.0.5~1m20.30℃;缓凝
21.和易性;180~220mm22.试拼;试压;1.523.300~500mm;1.0m;2~6m24.连续;
30min;严禁1K412023墩台、盖梁施工技术1.1.5~2m2.截面尺寸较小;企口形;2块;3块;50㎡3.
同步浇筑;对称浇筑4.整体组装模板;快装组合支架第100页?共123页5.悬臂端6.硬木楔;钢楔固定7.75%8
.坐浆法9.曲线部分;角部1K412030城市桥梁上部结构施工1K412031装配式梁(板)施工技术2.2mm;2
mm3.反拱6.平卧重叠法;临时隔离层;5.0MPa7.T形梁;I形梁8.75%;75%9.200mm10.3个月;5
个月11.垫木;2层;3层;6~10层12.裸梁的稳定性13.75%;30MPa14.10d;4mm;横向湿接缝15
.一联梁16.一次浇筑;14d1K412032现浇预应力(钢筋)混凝土连续梁施工技术1.预压方法2.弯矩零点3.
挂篮6.先边跨;后次跨;最后中跨7.2m8.最低9.高程控制;反力10.挂篮前端的垂直变形值;预拱度设置;施工中已浇段的
实际标高;温度影响;变形值;应力第101页?共123页1K412033钢梁制作与安装要求1.24h2.试拼装3.
纵向从跨中向两端;横向从中线向两侧对称进行4.板束刚度大;缝隙大处;中央向外拧紧;终拧完毕;冲击拧紧;间断拧紧1K412034
钢-混凝土结合梁施工技术2.缓凝;早强;补偿收缩性3.先由中间开始向两侧扩展1K412035钢筋(管)混凝土拱桥
施工技术1.两端拱脚向拱顶对称;连续浇筑;初凝前2.分段浇筑;间隔槽;0.5~1m3.拱脚向拱顶;75%4.通长钢筋5
.纵向分幅浇筑;中幅先行浇筑合龙;横向对称浇筑合龙其他幅6.强度高一级7.100%1K420100城市桥梁工程质量检查与验收
1K420102大体积混凝土浇筑施工质量检查与验收1.表面裂缝;深层裂缝;贯穿裂缝2.水泥水化热影响;内外约束条件的影响;外
界气温变化的影响;混凝土的收缩变形;混凝土的沉陷裂缝3.180mm4.300~500mm1K420103预应力张拉施工质量事
故预防措施1.半年;2003.没有预应力筋出厂材料合格证;预应力筋规格不符合设计要求;配套件不符合设计要求;张拉前交底不清;准
备工作不充分、安全设施未做好;混凝土强度达不到设计要求第102页?共123页1K420104钢管混凝土浇筑施工质量检
查与验收1.混凝土浇筑的施工质量2.超声波检测报告;混凝土试件试验报告3.低泡;大流动性;补偿收缩;延缓初凝;早强4.超声
波检测;人工敲击1K412036斜拉桥施工技术1.拉索索力;主梁标高;塔梁内力;索塔位移量1K412040管涵和箱涵施工1K
412041管涵施工技术1.圆形;椭圆形;卵形;矩形2.管节接缝处。3.500mm;500mm4.保护层;3MPa;对称进
行;300mm5.70%1K412042箱涵顶进施工技术2.0.4~0.8m3.50mm4.轴线;高程偏差5.循环交替6
.轴线;高程1K420160城市桥梁工程施工安全事故预防1K420161桩基施工安全措施1.桩的制作;桩的吊运;沉入施工2
.施工场地;护筒埋设;护壁泥浆;钻孔施工;钢筋笼制作及安装3.未经冷拉的HPB300级热轧4.2m;1.2m5.2m;3
层6.10m第103页?共123页7.75%8.4层;3层9.孔径;孔深;导管内径10.10m11.0.8m;1
m1K420162模板支架和拱架施工安全措施2.由上而下逐层;上下同时1K420163箱涵顶进施工安全措施1.调轨梁;轨束
梁2.横梁加盖;纵横梁加固;工字轨束梁;钢板脱壳3.严禁1K413000城市轨道交通工程1K413010城市轨道交通工程结
构与特点1K413011地铁车站结构与施工方法1.矩形;拱形;圆形2.车站主体;出入口及通道;附属建筑物4.直接法;注入法
;充填法5.V;30°;注入法;充填法6.管超前;严注浆;短开挖;强支护;快封闭;勤量测7.浅埋暗挖法8.矩形框架;拱形9.
矩形框架1K413012地铁区间隧道结构与施工方法1.小导管超前预注浆;开挖面超前深孔注浆;管棚超前支护2.预支护、预加固
一段;开挖一段;开挖一段;支护一段;支护一段;封闭成环一段3.变形第104页?共123页1K413020明挖基坑施
工1K413021地下水控制1.潜水;微承压水;承压水;截水;降水;回灌3.沿基坑周边闭合的平面布置;沉降4.土层情况;渗
透性;降水深度;地下水类型5.集水明排法;30~50m6.工程性质;降水深度;6m;6m;6m;环形井点;4m7.金属管
;1.0~1.5m;0.8~1.6m?8.中粗砂;黏土封堵;1m1K413022深基坑支护结构与边坡防护1.悬臂式;
单撑式;多撑式。2.内撑;外锚3.机械。4.止水帷幕;深层搅拌桩6.28d;0.8MPa7.刚度大,开挖深度大,可适用于所
有地层;强度大,变位小,隔水性好,同时可兼作主体结构的一部分;可邻近建筑物、构筑物使用,环境影响小;造价高。8.4~6m;L
形;T形9.波纹管接头;工字钢接头;一字形;钢筋承插式10.钢撑;钢管撑;钢筋混凝土撑;拉锚;土锚11.围护(桩)
墙→围檩(冠梁)→支撑12.现浇钢筋混凝土支撑;钢支撑13.0.5m;1.0m1K413023基坑(槽)土方开
挖及基坑变形控制2.分段分层;由上而下;先支撑后开挖3.围护结构的水平位移;坑底土体隆起4.围护结构的水平变形;坑底土体隆起
;地表沉降;周边建(构)筑物变形5.增加围护结构和支撑的刚度;增加围护结构的入土深度;抽条加固;裙边加固6.加深围护结
构入土深度;坑底土体加固;坑内井点降水;适时施作底板结构第105页?共123页1K413024地基加固处理方法1.
止水;减少围护结构承受的主动土压力2.提高土体的强度和土体的侧向抗力,减少围护结构位移,保护基坑周边建筑物及地下管线;防止坑底
土体隆起破坏;防止坑底土体渗流破坏;弥补围护墙体插入深度不足3.深基坑4.渗透注浆;劈裂注浆;压密注浆;电动化学注浆6.旋喷
;定喷;摆喷7.钻机就位;钻孔;置入注浆管;高压喷射注浆;拔出注浆管1K413030盾构法施工1.钢管片;铸铁管片;钢管片;
铸铁管片;负环管片;联络通道;钢筋混凝土管片2.联络通道;安全疏散乘客;隧道排水及防火;消防3.螺栓连接4.封顶块K型1
K413031盾构机选型要点1.密闭;敞开;手掘式;半机械挖掘;机械挖掘2.膨润土悬浮液1K413032盾构施工条件与现场
布置1.3m;接收;解体;调头;低于3.空压机房1K413033盾构施工阶段划分及始发与接收施工技术2.化学注浆法;砂浆回填
法;深层搅拌法;高压旋喷注浆法;冷冻法;深层搅拌法;高压旋喷注浆法;冷冻法3.衬砌与周围地层的摩擦阻力;后续台车长度4.常规接
收;钢套筒接收;水(土)中接收5.盾构姿态6.掘进速度;土仓压力第106页?共123页1K413034盾
构掘进技术1.掘进出土;管片拼装;壁后注浆;线形控制2.;良好的塑流状态;良好的黏稠度;低内摩擦力;低透水性4.椭圆度5.同
步注浆;二次注浆;堵水注浆6.盾构姿态1K413040喷锚暗挖(矿山)法施工1K413041喷锚暗挖法的掘进方式选择
1.自稳能力2.1;33.4m4.环形拱部;上部核心土;下部台阶;0.5–1.0m;1D5.单侧壁导坑法6.双侧壁导坑法7
.地层较差;岩体不稳定且地面沉降要求严格8.临时仰拱1K413042工作井施工技术1.人工开挖。2.1.2m3.70%4.
挡水墙5.先开挖周边;后开挖中部6.预埋暗梁;暗桩;超前小导管7.先拱部;再侧墙;最后底板8.15m;先低后高9.管超前
;严注浆;短开挖;强支护;勤量测;早封闭1K413043超前预支护及预加固施工技术1.超前小导管注浆加固;深孔注浆;管棚支护
2.超前小导管注浆第107页?共123页3.孔位;孔深;孔径4.40-50mm;钢管;水煤气管;2倍;3-5m5
.1m6.改性水玻璃浆;普通水泥单液浆;水泥-水玻璃双液浆;超细水泥7.渗入注浆法;挤压;渗透注浆法;劈裂;电动硅化注浆法
8.由下而上;间隔对称9.孔位;角度;深度的偏差10.水泥浆;水泥砂浆;刚度;强度12.测放孔位;钻机就位;水平钻孔;压入
钢管;注浆;封口;开挖13.3m。1K413044喷锚支护施工技术1.钢筋网喷射混凝土;锚杆—钢筋网喷射混凝土;钢拱架—钢筋网
喷射混凝土2.早强混凝土;5min;10min3.试拼装4.分段;分片;分层自下而上;终凝后。5.终凝2h后;14d6
.20°~30°7.注浆量;注浆压力1K413045衬砌及防水施工要求1.防、排、截、堵相结合,刚柔相济,因地制宜,综合治
理2.以防为主,刚柔结合,多道防线,因地制宜,综合治理3.复合式衬砌;初期(一次)支护;防水层;二次衬砌4.结构自防
水5.射钉铺设。6.补偿收缩7.组合钢模板;模板台车;强度;刚度;稳定性8.插入式;附着式;两侧对称;水平浇筑;水平;倾斜
1K413046喷锚暗挖法辅助功法施工技术要点2.先钻孔→吹净钻孔→用灌浆管灌浆→垂直插入锚杆杆体→孔口将杆体固定第108
页?共123页3.中空注浆锚杆;树脂锚杆;自钻式锚杆;砂浆锚杆;摩擦型锚杆4.强度高;成本较高1K420110城市轨
道交通工程施工质量检查与检验1K420112喷锚支护施工质量检查与验收1.开挖;初期支护;防水;二衬2.激光准直仪;中线;隧
道断面仪;外轮廓线3.24.由下而上;垂直;1m;终凝后;20mm;2h7.防水层1K420113盾构法隧道施工质量检查与验
收1.3环2.100次3.蒸汽养护;自然养护4.抗拉拔试验5.15环;宽度;弧长;厚度6.100环7.隧道轴线;高程
8.管片自防水;接缝防水1K414000城市给水排水工程1K414010给水排水厂站工程结构与特点1K414011厂站工程
结构与施工方法2.薄板;薄壳型结构;配筋率较高;较高抗渗性;良好的整体性3.水流性能好;抗腐蚀性高;抗地层变位性好;PE管;
球墨铸铁管4.12~18m;满堂支模法;滑升模板法;15m5.无粘结预应力筋;曲面异型大模板6.顶板;聚氯乙烯胶泥;橡胶止
水带7.后浇缝带;42d;补偿收缩混凝土;14d8.抗裂性;不透水性9.渗水量不大;稳定的黏性土第109页?共123
页10.人工挖土下沉;机具挖土下沉;水力机具下沉11.水下抓土下沉;水下水力吸泥下沉;空气吸泥下沉1K414012给水与
污水处理工艺流程1.无机物;有机物;微生物;悬浮物质;胶体;溶解物质;臭氧氧化;重力分离;离心分离;深度处理1K414013给
水与污水处理厂试运行1.2h2.24h3.4~6h4.6~8h5.72h6.37.6h1K414020给水排水厂站工程施
工1K414021现浇(预应力)混凝土水池施工技术1.池底防渗层施工;池内防水层施工;池壁防水层施工2.50mm3.
穿墙螺栓4.圆环5.40-50mm6.1.5m;3m;1.5m7.塑料;橡胶止水带;热接;叠接8.金属止水带;折叠咬接;搭接
;20mm;双面焊接9.穿孔;铁钉固定10.施工缝;变形缝11.200mm;200mm12.200mm13.8m;200mm;3mm;止水钢板14.钢筋直径;钢材;现场条件;绑扎;焊接;机械连接第110页?共123页15.Ⅰ类16.内模板;非预应力筋;无粘结预应力筋;外模板17.50m;双数18.25m;25m;50m;50m19.50mm20.50mm21.C4022.12h;14d;42d;14d;14d;25℃;1.2MPa1K414022装配式预应力混凝土水池施工技术1.三点吊装;45°;45°2.75%3.1.5m4.250mm5.微膨胀;快速水泥1K414023构筑物满水试验的规定1.满水试验3.试验准备→水池注水→水池内水位观测→蒸发量测定→整理试验结论4.3次;1/35.2m/d;24h6.1/10mm7.24h8.24h9.2L/(m2m2·d);3L/(m2m·d)21K414024沉井施工技术2.中粗砂3.高于4.凹凸缝;钢板止水带;对拉螺栓6.分层;均匀;对称;0.5m7.随挖随纠;动中纠偏第111页?共123页8.10mm/8h9.阶梯形;500mm10.泄水井1K414025水池施工中的抗浮措施1.间断1K420120城市给水排水场站工程质量检查与验收1K420121给水排水混凝土构筑物防渗漏措施1.先地下后地上;先深后浅2.普通硅酸盐水泥;水化热4.数量适当;位置合理1K415000城市管道工程1K415010城市给水排水管道工程施工1K415012开槽管道施工技术1.3m;2m2.0.8m;0.5m;1.5m3.200~300mm;人工开挖4.天然级配砂砾石;石灰土;设计要求5.2根;1.5~2m;1.5m6.1.0m;0.4~0.8m7.150mm;低于;换填8.100mm;天然级配砂石;砂砾;300mm;卵石;块石;砾石9.法兰;胶圈接口10.20%;2mm;十字形焊缝11.内外防腐施工;施做阴极保护工程12.0.5m;闭水;闭气13.±2%14.500mm;300mm15.台阶形;200mm16.800mm;竖向支撑第112页?共123页17.500mm;人工;500mm;200mm18.12-24h1K415013不开槽管道施工技术2.顶管法3.3000mm4.浅埋暗挖法5.定向钻机6.夯管法1K415014管道功能性试验1.水压试验;严密性试验2.预试验;主试验;允许压力降值;允许渗水量值3.注水法4.分别;最严5.1.0km6.0.5m7.闸阀;消火栓;水锤消除器;安全阀8.排气阀9.24h;72h;48h。10.严密性试验合格11.5个连续12.1/313.24h1K415015砌筑沟道施工技术1.M10;满铺满挤法;上下错缝;内外搭砌;丁顺规则3.两侧向拱中心对称4.24h5.75%6.30mm;50mm第113页?共123页1K415016给水排水管网维护与修复技术1.密封法;灌浆法;机器人法2.内衬法;缠绕法;喷涂法3.破管顶进1K415020城市供热管道工程施工1K415022供热管道施工与安装要求1.交通管理部门;路政部门2.材质;规格;壁厚;合格证书;质量证明书;复验报告3.强度;严密性4.明挖法;暗挖法;顶套管法;盾构法;定向钻法5.锚喷护壁;土钉墙;排桩;0.5m6.150mm7.建设;勘察;设计;施工;监理;设计;勘察8.台阶法;70%;15-20m9.无缝;电弧焊;高频焊;法兰10.活动支架;固定支架12.偏移方向;偏移量;导向性能13.轴向补偿器14.坡口质量;对口间隙;错边量;纵焊缝位置15.柔性材料16.两次18.3层;2m19.对口质量检验;外观质量检验;无损探伤检验;强度;严密性试验20.100%;外观21.射线;超声波;磁粉;渗透;射线探伤;超声波探伤;射线探伤;20%;磁粉;渗透22.全部1K415023供热管网附件及供热站设施安装要点1.温度应力3.自然补偿器第114页?共123页4.方形补偿器5.补偿材料的变形;管道的位移6.法兰;螺纹;关闭;氩弧焊;关闭7.预埋吊点的数量及位置;设备基础位置;表面质量;几何尺寸;标高;书面8.外观质量检查;无损检测;强度和严密性试验;强度和严密性试验合格1K415024供热管道功能性试验的规定2.72h1K415030城市燃气管道工程施工1K415032燃气管道施工与安装要求1.3°;弯管;盲板力2.0.9;0.6;0.3;0.83.电缆5.套管;1.70m;铁路;100mm;检漏管;2.0m;100mm;2.0m;1.0m7.0.4MPa;桥梁;超声检测;射线检测;通航净空;补偿;减震措施;45°8.河道管理;水利管理;50m;超声检测;射线检测;0.5m;;1m,;11.钻孔轨迹的监测和控制。12.轻压慢转1K415033燃气管网附属设备安装要点1.安全阀;减压阀;止回阀2.截止阀4.1.5‰;2mm5.严密性试验6.消除管段的胀缩应力7.下侧9.凝水缸10.放散管1K415034燃气管道功能性试验的规定1.管道吹扫;强度试验;严密性试验第115页?共123页2.试压前;500m;500m;0.3MPa;介质流动4.空气;1.5倍;0.4MPa;1h;肥皂水;无漏气5.清洁水;1.5倍设计压力6.50%;试验压力;1h;30min;无压力降7.严密性;1.15倍;0.1MPa8.0.3-0.5m1K420130城市管道工程质量检查与验收1K420132城市燃气、供热管道施工质量检查与验收1.先大管;后小管;先主管;后支管;先下部管;后上部管2.100mm;十字形焊缝;300mm3.环焊缝;焊缝;环焊缝;无损探伤5.15%6.射线;超声波7.两次8.弯曲度;椭圆度;焊缝表面;管材表面9.出厂质量证明文件;检验证明;说明书;生产日期;储存有效期10.阳极材料的质量证明文件;阳极体的数量;规格;型号;埋设位置11.品种;规格强度;导热系数;耐热性;含水率1K420133柔性管道回填施工质量检查与验收1.钢管;球墨铸铁管;化学建材管2.800mm;竖向支撑3.50m;中粗砂4.500mm5.对称6.12~24h7.2%;3%;3%;5%;3%;5%1K415040城市综合管廊1K415041综合管廊工程结构类型和特点1.规划先行;适度超前;因地制宜;统筹兼顾第116页?共123页3.天然气4.蒸汽。5.电力电缆6.通信电缆7.分流;管道;底部8.100年1K415042综合管廊工程施工方法选择1.明挖法;盖挖法;盾构法;喷锚暗挖法2.明挖;明挖;盖挖;盾构;喷锚暗挖1K415043综合管廊工程施工技术1.高性能混凝土;高强度钢筋;C30;C402.施工缝3.0.2mm4.1000mm1K416000生活垃圾处理工程1K416010生活垃圾填埋处理工程施工1K416011生活垃圾填埋场填埋区结构特点1.单层防渗系统结构;双层防渗系统结构;单层防渗系统;渗沥液收集导排系统;防渗层;上下保护层;基础层;双层防渗系统;渗沥液导排系统;主防渗层及上下保护层;渗沥液检测层;次防渗层及上下保护层;基础层1K416012生活垃圾填埋场填埋区防渗层施工技术1.渗透系数小;稳定性好;价格便宜;黏土;膨润土;土工膜;土工织物膨润土垫(GCL)2.掺加膨润土4.均匀度;含水量;压实度5.2%6.压实度试验;渗水试验7.钠基膨润土防水毯第117页?共123页8.粉末型膨润土防水毯9.不应10.品字形;十字搭接11.沿边坡向下自由滚落铺设;锚固沟12.搭接;250±50mm;钠基膨润土粉;2m13.双轨热熔焊机14.单轨挤压焊机15.气压检测;真空检测;电火花检测16.肥皂水;真空检测17.电火花检测18.剪切试验;剥离试验19.热胀冷缩;搭接宽度;焊缝质量控制;不得直接20.先边坡后场底21.严禁22.试验性焊接23.撕裂强度;抗剪强度24.焊接温度;环境温度;预热温度;日期;时间;技术负责人1K416013生活垃圾填埋场填埋区导排系统施工技术1.导排层摊铺;收集花管连接;收集渠码砌。2.人工3.热熔焊接;预热阶段;吸热阶段;加热板取出阶段;对接阶段;冷却阶段1K416014垃圾填埋与环境保护技术1.10年2.地质结构;运距;风向3.必须4.夏季主导风向的下风向第118页?共123页1K417000施工测量与监控量测1K417010施工测量1K417011施工测量主要内容与常用仪器1.规划;设计2.由整体到局部;先控制后细部3.竣工测量4.设计图纸;施工组织设计;施工方案5.距离;角度6.水平角;竖直角7.标高;高程8.同心度10.陀螺仪;经纬仪;测距仪1K417012场区控制测量1.场区;线路;平面控制网;高程控制网;方格网;边角网;控制导线2.建筑方格网;三角形网;导线测量法3.工程测量方案4.桩点交接1K417013竣工图编绘与实测1.施工单位项目技术负责人监理单位总监理工程师。2.1:500;1:20003.1/31K417020监控量测1K417021监控量测主要工作1.一、二级;5m;5m2.基坑及周围岩土体;地下水4.邻近重要建筑、设施、管线等破坏后果很严重的基坑工程;工程地质、水文地质条件复杂的基坑工程;已发生严重事故,重新组织施工的基坑工程;采用新技术、新工艺、新材料、新设备的一、二级基坑工程第119页?共123页1K420000市政公用工程项目施工管理1K420010市政公用工程施工招标投标管理1K420011招标投标管理1.公开招标;邀请招标2.资格预审;资格后审3.实质性4.商务部分;经济部分;技术部分5.投标报价;已标价的工程量清单;拟分包项目情况6.2%1K420012招标条件与程序2.3d;3d3.重新组织招标4.5d5.30d1K420020市政公用工程造价管理1K420022施工图预算的应用1.工料单价法2.措施费;规费;税金1K420023工程量清单计价的应用1.工程量清单2.安全文明施工费3.分部分项工程费;措施项目费;其他项目费;规费;税金5.规费;税金6.合同中已有适用的综合单价,按合同中已有的综合单价确定;合同中有类似的综合单价,参照类似的综合单价确定;合同中没有适用或类似的综合单价,由承包人提出综合单价,经发包人确认后执行。第120页?共123页1K420030市政公用工程合同管理1K420031合同履约与管理要求1.监理工程师1K420032工程索赔的应用2.28d;28d3.28d4.28d;28d5.28d1K420040市政公用工程施工成本管理1K420041施工成本管理的应用1.施工成本管理2.成本预测→成本计划→成本控制→成本核算→成本分析→成本考核1K420043施工成本核算与分析1.比较法;因素分析法;差额计算法;比率法1K420050市政公用工程施工组织设计1K420051施工组织设计编制的注意事项1.项目负责人;企业技术负责人2.项目负责人;技术负责人;企业技术负责人审批加盖公章;总监理工程师;建设单位项目负责人1K420053专项施工方案编制与论证的要求1.施工单位;施工单位2.5m;5m;滑模;爬模;飞模;隧道模;8m;18m;15kN/㎡;20kN/m;7kN;100kN;300kN;200m;200m;50m;150m;20m;16m;新技术;新工艺;新材料;新设备4.总承包单位5.单位技术负责人;总监理工程师6.5名第121页?共123页1K420060市政公用工程施工现场管理1K420061施工现场布置与管理的要点5.1.8m;2.5m。8.工程概况牌;管理人员名单及监督电话牌;消防安全牌;安全生产(无重大事故)牌;文明施工牌;施工现场总平面图9.泥浆不外流;轮胎不沾泥;管线不损坏;渣土不乱抛;爆破不扰民;夜间少噪声12.排水系统13.3.5m;15m1K420062环境保护管理的要点6.建设单位;施工单位7.洗车池;1K420063劳务管理的有关要点1.书面劳动合同;无身份证;无劳动合同;无岗位证书1K420080市政公用工程施工质量管理1K420081质量计划编制注意事项1.项目负责人;项目技术负责人;企业技术负责人2.班组自检;工序或工种间互检;专业检查1K420082质量计划实施要点1.连带责任1K420083施工准备阶段质量管理措施1.项目经理2.建设单位3.建设单位1K420140市政公用工程施工安全管理1K420141施工安全风险识别与预防措施2.人的不安全行为;物的不安全状态;作业环境的不安全因素和管理缺陷;措施关;第122页?共123页交底关;教育关;防护关;检查关;改进关1K420142施工安全保证计划编制和安全管理要点1.项目负责人2.项目技术负责人3.专职安全员4.交底人;被交底人;专职安全员1K420150明挖基坑施工安全事故预防1K420151防止基坑坍塌、淹埋的安全措施1.在缺陷处插入引流管引流,然后采用双快水泥封堵缺陷处,等封堵水泥形成一定强度后再关闭导流管。如果渗漏较为严重直接封堵困难时,则应首先在坑内回填土封堵水流,然后在坑外打孔灌注聚氨酯或水泥-水玻璃双液浆等封堵渗漏处,封堵后再继续向下开挖基坑。2.坡顶卸载;内支撑;锚杆;堆载;注浆加固1K420190市政公用工程竣工验收与备案1K420191工程竣工验收要求1.专业监理工程师2.总监理工程师;勘察;设计单位3.施工单位;预验收;施工单位;建设单位4.建设单位1K420192工程档案编制要求1.总承包单位1K420193工程竣工备案的有关规定1.建设单位;15日2.5个3.建设单位4.质量检查报告;质量检查报;工程竣工报告。5.工程质量评估;总监理工程师第123页?共123页
献花(0)