配色: 字号:
PSC Ready Campaign version 2
2023-07-12 | 阅:  转:  |  分享 
  
“PSC-READY” CAMPAIGN PRE-ARRIVAL CHECKLIST

PSC Campaign 2022 – Rev 2.0







Ship Name: Next Port of Call:

Ship IMO Number: Date of Port Call:



Caution

Any defects found on board that are statutory i.e covered by certification, must be reported to the

ship management office. The Flag Administration and the Port State authority must also be

informed before vessel arrival. Failure to do so will result in an ISM-related PSC finding and

DETENTION.

Part 1: Top Detention Items

Note: Items listed here are based on defect trends globally between 1st April– 30th Sept 2022

Life Saving Appliances

Lifeboats/Rescue Boats

1) Operational ..................................................................................................................Confirmed ?

a) Lifeboat engines ........................................................ Start immediately ?

b) Cold climate precautions for engines ............................................... Yes ?

c) Fuel tanks ......................................................................................... Full ?

d) Air supply ......................................................................................... Full ?

2) All components in good condition…………………………………………………………………………….Confirmed ?

a) Boats free of temporary repairs / soft patches. ............................... Yes ?

b) Lifeboat steering systems .............................................. Good condition ?

c) Batteries ....................................................................... Good condition ?

d) Lifeboat Windows .................................... Good Visibility (Not opaque) ?

Note: The lifeboat structure (hull integrity, seats/ thwarts, flooring, releasing hook connections to the boat,

releasing gear, tiller/gudgeons) must be checked for proper maintenance with no wastage or rot.

3) Signage as Required ..................................................................................................... Confirmed ?

a) Launching and embarkation arrangement & poster ..... Good condition ?

b) Posters under emergency lighting .................................................... Yes ?

4) Lifeboats (as per SOLAS) ............................................................................. Launched & Lowered ?

“PSC-READY” CAMPAIGN PRE-ARRIVAL CHECKLIST

PSC Campaign 2022 – Rev 2.0





a) Date when LB was last tested in the water………………………………………………Date:……………………

b) Date when rescue boat was last tested in the water…………………………………Date:……………………

Caution: If launching / testing / drills not completed, have details been recorded in the logbook

and has Flag been notified?

5) Rescue boat engines......................................................................................... Start immediately ?

Note: Fast Rescue Boats - An effective operational test is to submerge the motor leg in water to a depth

which will cover the cooling inlet ports. The cooling water pump condition and circulation is verified

by observing the cooling water flow through the water flow indication (tell-tale) hole. Submit photos

of testing.

6) Fast rescue boat davit – Hydraulic accumulator or alternative power methods for

launching ........................................................................................................................... Tested ?

Lifeboat launching arrangements

7) Operational ..................................................................................................................Confirmed ?

8) All components in good condition .............................................................................. Confirmed ?

a) Corrosion/wastage of wire falls

(Particularly where passes through sheaves) ........................... Checked ?

b) Corrosion/wastage of sheaves/hooks ...................................... Checked ?

9) As per original design ................................................................................. Yes: No modifications ?

10) Signage as Required ..................................................................................................... Confirmed ?

11) On load release gear ....................................................................................................... Working ?

12) On load release gear ................................................................................................. Properly set ?

13) Davit launch limit switches ................................................................................................. Tested ?

14) Emergency lighting ......................... Tested, functioning correctly and marked as “Emergency” ?

Fire Safety

Fire Doors

Accommodation

1) All fire doors and self-closing devices in good working order .....................................Confirmed ?

2) Fire doors off stairways fully close as designed .......................................................... Confirmed ?

3) Fire doors in the Galley and Provision Spaces free from tie backs ..............................Confirmed ?

4) Remote closing devices tested .................................................................................... Confirmed ?

5) Check the Fire Safety Plan for all doors marked as self-closing .................................. Confirmed ?

Note: Check that all doors on the plan marked as self-closing do have mechanical self-closing devices (in

good condition). A common failure is the Laundry Room.

Machinery Spaces

6) Fire door gaskets on all entrances to machinery spaces in good condition ................Confirmed ?

7) Fire doors leading outside are free from corrosion and damage ................................Confirmed ?

8) Fire doors in regular use, such as to Crew Changing area in good condition ............. Confirmed ?

9) Fire doors to Purifier Rooms in good condition .......................................................... Confirmed ?

10) Fire door between ER spaces and Steering compartment in good condition ............. Confirmed ?

There will be many others – check your approved Fire and Safety Plan

“PSC-READY” CAMPAIGN PRE-ARRIVAL CHECKLIST

PSC Campaign 2022 – Rev 2.0





Fire dampers, including remote controls mechanisms

1) Operational ..................................................................................................................Confirmed ?

a) All flaps ........................................................................ Close fully ?

2) All components in good condition .............................................................................. Confirmed ?

3) Signage as Required ..................................................................................................... Confirmed ?

a) Labelled “open” / “closed” ........................................ Confirmed ?

Note: Submit photographs of engine room dampers fully closed (Include photo from inside funnel

demonstrating no daylight showing through closed dampers)

Fire Main

1) Fire main free of rust ...................................................................................................Confirmed ?

2) Isolation valves for Fire and Foam lines ease of movement ............................................. Tested ?

3) Foam monitors in good condition and free movement .................................................... Tested ?

Fire Detection Equipment

1) Operational ..................................................................................................................Confirmed ?

2) All components in good condition .............................................................................. Confirmed ?

3) As per original design ................................................................................. Yes: No modifications ?

4) Signage as Required ..................................................................................................... Confirmed ?

5) Fire control panel fully operational / no faults ........................................................... Confirmed ?

6) FOR DRY VESSELS: Cargo hold Smoke detectors fully operational ............................. Confirmed ?

Submit photos of Fire Detection System Control panel

All above verified by Safety Officer - Signature: Date:

Emergency Systems



Emergency generator

1) Operational ..................................................................................................................Confirmed ?

2) All components in good condition .............................................................................. Confirmed ?

3) As per original design ................................................................................. Yes: No modifications ?

4) Signage as Required ..................................................................................................... Confirmed ?

5) All means of starting .......................................................................................................... Tested ?

6) Other self-contained power sources on board (If any) ............................................. Operational ?

7) Ship staff can demonstrate on-load test ................................................................................. Yes ?

Note: SOLAS II-1 The emergency generator must supply power to the emergency switchboard

within a maximum of 45 seconds automatically.

8) Insulation resistance ................................................................................................... >5 MOhms ?

9) Fuel tanks ................................................................................................................................ Full ?

Emergency Fire Pumps

1) Operational ..................................................................................................................Confirmed ?

2) All components in good condition .............................................................................. Confirmed ?

3) As per original design ................................................................................. Yes: No modifications ?

4) Signage as Required ..................................................................................................... Confirmed ?

“PSC-READY” CAMPAIGN PRE-ARRIVAL CHECKLIST

PSC Campaign 2022 – Rev 2.0





5) All crewmembers can start pump ................................................................................Confirmed ?

6) Sufficient pressure to supply 2 hoses on deck ........................................................................ Yes ?

a) State pressure obtained................................................................... _________Bar

7) Seawater Suction Valve Remote from Outside Engine room ..................................... Confirmed ?

Engine Room & Auxiliary Equipment

Leaks & ER Housekeeping

1) CE Standing Orders for Machinery Spaces (TEC40) ......................................... Issued and signed ?

2) Oil leaks .......................................................................................... Any existing leaks to be fixed ?

3) Oily rags ......................................................................................................................... Removed ?

Note: Where the vessel is required to change over to LSFO or LSMGO, make additional checks for

leakages after changeover and prior to arrival in port.

4) Bilges/tank tops .................................................................................................................... Clean ?

5) Buckets under machinery to collect leaks ..................................................................... Removed ?

6) Lagging material ................................................................................................... Good condition ?

Note: Submit photographs of insulation condition at various locations, especially on fuel lines and

near turbochargers of main engine and auxiliary engines

7) Hot surface shielding/screening ........................................................................... Good condition ?

8) Sea Water pipelines free of temporary repairs / soft patches ........................................ Verified ?

Fuel and Lube Quick Closing Valves, including remote controls mechanisms

1) Tested and Operational ................................................................................................Confirmed ?

Caution: Carefully plan tests – do not jeopardise safe navigation!

2) All components in good condition .............................................................................. Confirmed ?

a) Handles and wires ............................................... Good condition ?

3) As per original design ................................................................................. Yes: No modifications ?

4) Signage as Required ..................................................................................................... Confirmed ?

Main Engine

1) Exhaust Gas outlets free of staining ................................................................................. Verified ?

2) Coolers free of leaks .................................................................................................... Confirmed ?

3) Temperature and Pressure gauges clear and full working order ................................ Confirmed ?

4) Fuel pumps and injectors free of leaks ....................................................................... Confirmed ?

5) Planned maintenance items ................................................................... Complete ?

6) Critical spare parts ............................................................................... Complete ?

7) Insulation and fuel spray shielding .......................................................... Good order ?

8) Tachometer ..................................................................................... Good order ?

9) Oil Mist Detector ............................................................................... Good order ?

Auxiliary Engines

1) All auxiliary engines in working order and taking rated load ........................................... Verified ?

Note: Auxiliary Engine Performance Tests (TEC 07a) must be fully up to date. Monthly test

at maximum sustainable load (min 80% MCR)

2) Automatic starting .............................................................................................................. Tested ?

“PSC-READY” CAMPAIGN PRE-ARRIVAL CHECKLIST

PSC Campaign 2022 – Rev 2.0





3) Exhaust Gas outlets free of staining ................................................................................. Verified ?

4) Planned maintenance items ................................................................... Complete ?

5) Critical spare parts ............................................................................... Complete ?

6) Insulation and fuel spray shielding .......................................................... Good order ?

Steering gear & Steering Gear room

1) NO oil leakage & NO material improperly stowed ...................................................... Confirmed ?

2) Comms between bridge and Steering Room ............................................. Tested & Operational ?

3) Low-level alarm for hydraulic oil tank ........................................................ Tested & Operational ?

4) Anti-slippery floor or grating and handrails I.W.O. steering gear ...................................... Fitted ?

5) Instruction for emergency and local control ................................................................ Displayed ?

6) Steel plate, drums and other heavy items ................................................................. Secured ?

All above verified by Chief Engineer - Signature: Date:

MLC & Hours of Work & Rest

MLC Compliance

1) Collective Bargaining Agreement (CBA) or Conditions of Service (COS) ........ Available on Board ?

Note: Must contain latest clause relating to arrangements should a seafarer become captive

because of an act of piracy, hijacking or armed robbery.

2) Seafarer Flag endorsement or Certificate of Receipt of Application (CRA) ...... Original onboard ?

3) MLC Self-Assessment ................................................................. Completed and Findings closed ?

Note: Master must complete ADM33 every January and July

4) Seafarers Employment Agreement (SEA) ........ …. Available on Board and terms complied with ?

5) Accommodation & Galley cleanliness ...................................................................... …. Inspected ?

6) Galley exhausts free from dirt and grease ................................................................... Confirmed ?

Note: Galley and food storage area inspection routines must be fully implemented as required by the Food

Safety management Plan.

7) Provisions ....................................................... …. Sufficient for intended voyage / Good Quality ?

8) Cold storage room evaporators free from icing ........................................................... Confirmed ?

9) Cold room cleanliness ........................................................................ Inspected & in good order ?

10) Cold Room Temperatures ........................................................................................... …. Correct ?

a) Meat Room Temperature_____

b) Fish Room Temperature_____

c) Dry & Veg Room temperature_____

Hours of Work & Rest

1) Work schedule ADM24 ................................................................................... Updated & posted ?

2) Records of hours of work or rest:

a) Accurate Records ......................................... Entered in Shipsure ?

b) Review and approval of W&R Hrs ........ ..Completed every week ?

3) Work & Rest hours non-Compliance

a) Non-Compliance ...... Recorded in Shipsure with reason for N/C ?

b) Compensatory Rest ....................... Details recorded in Shipsure ?

“PSC-READY” CAMPAIGN PRE-ARRIVAL CHECKLIST

PSC Campaign 2022 – Rev 2.0





All above verified by Master - Signature: Date:

Inoperative (Out of Service) Equipment

List Inoperative (Out of Service) Equipment below relating to LSA, Fire-fighting, MARPOL equipment,

machinery in the engine room, emergency systems and Bridge Navigation and radio equipment:



“PSC-READY” CAMPAIGN PRE-ARRIVAL CHECKLIST

PSC Campaign 2022 – Rev 2.0





Part 2: Concentrated Inspection Campaigns

Note: PSC Concentrated Campaigns usually run from September to November each year. The

subject of the campaign will be advised in advance

4) Campaign checklist ..................................................................................................... Completed ?

5) Defects identified ........................................................................................... Reported to office ?

Current Regional Concentrated Campaigns



CIC on STCW

Already some years ago, the Paris and Tokyo MoUs agreed to carry out a CIC on STCW lasting three months,

from 1 September until 30 November 2022. Nearly all other PSC regimes – such as the Black Sea, Caribbean,

Indian Ocean, Mediterranean, Riyadh, and Vina del Mar MoUs – have agreed to join this campaign.



CIC focus area advice from Class DNV:

? Certification or document control due to several fake crew certificates and lack of competence of

seafarers regarding their certification in the past.

? evaluation of competences of the Master, officers and crew when performing duties and during

emergency scenarios.









“PSC-READY” CAMPAIGN PRE-ARRIVAL CHECKLIST

PSC Campaign 2022 – Rev 2.0





Part 3: Completion / Confirmation

Send the completed checklist to your:

1) Vessel Control Group.

2) DPA, if defective or list below in the comments section unconfirmed items.











Please list and comment on:

? any of the above checks which have not or cannot be positively confirmed and;

? any other defects which may be identified during the PSC inspection. i.e. defective equipment,

missing certificate, lack of provisions, missed servicing, test or inspections.



I have verified, prior to this port arrival, except the above items which are either:

? in conformance with applicable international regulations and Company SMS;

? Deficiencies have been reported to the company; and

? Corrective action has been taken.



Master’s signature: _________________ Date: __________________





Chief Engineer’s signature: ________________ Date: __________________



Management Office Confirmation

I certify that I have verified with the Master, prior to this port arrival, except as noted herein, the above items

and other systems and equipment are either:

? in conformance with applicable international regulations;

? deficiencies have been reported to the Company

? Communication Plan agreed with VCG for reporting defects to Class Flag and relevant PSC

authority

? corrective action has been taken.

? The DPA is aware of any defects listed

? This pre-arrival inspection has been entered into Shipsure along with all findings identified,

even pre-existing items.



I also confirm that the checks on the following have been made via Shipsure and found to be in order:



? Vessels Certification

? Closure of Internal & External Audit Deficiencies



Marine Supt Signature: ________________ Date: __________________





Comments:

“PSC-READY” CAMPAIGN PRE-ARRIVAL CHECKLIST

PSC Campaign 2022 – Rev 2.0





Annex 1: Managing a PSC Inspection

First impressions are of critical importance. The following will give an impression of an orderly ship and

decreases the risk of an expanded inspection:

? Safe access

? Security checks

? Presentable Master’s office

? Organized records

? Crew dressed appropriately

? Clean and orderly vessel’s topside and engine room

? No obvious or imminent dangers or operations ongoing with a risk of injury / incident

PSC Inspection Procedure

6) Conduct Gangway ISPS identification/briefing & escort PSCO to Master

Caution: A senior officer must escort PSCOs at all times.

7) Hold an opening meeting with all key staff

Note: Unless duty requires otherwise, in which case this should be explained.

8) Introduce key officers/personnel to the lead PSC officer

9) Request explanation of the inspection procedure

10) Keep notes of any deficiencies

Caution: Do not argue or refuse to comply with a PSC Officer request.

a) Request notification of irregularities at earliest for possible correct “on the spot”

Caution: Do not intentionally misrepresent a condition to the PSCO.

11) Insist on a closing meeting, even if one is not offered

12) Listen to what the PSCO says about the inspection results

a) If necessary, ask for clarification/corrections

13) Challenge politely findings which you believe incorrect

Note: All findings must be provided with a reference to a specific rule or regulation.

14) Report to the fleet cell:

a) any equipment not functioning as required

15) Escort the inspection team to disembarkation



COVID-19 Reminder!

The Master has the authority to prohibit boarding of the vessel – or to request a person on board

disembark - to anyone:

- whose temperature exceeds 37.5℃

- who refuses to wear PPE

- who does not agree to comply with shipboard restrictions.



All persons who fail to comply with instructions relating to Covid- for above reasons shall be

reported to their source Company.







献花(0)
+1
(本文系wangweiqin1...首藏)