China places first ecological subsurface mooring buoy in polar regionChina places first ecological subsurface mooring buoy in polar region.(ECNS) -- China''s 40th Antarctic expedition team placed its first ecological subsurface mooring buoy in the Amundsen Sea on Saturday.Deployed at a depth of approximately 3... 阅3 转0 评0 公众公开 24-01-10 19:24 |
China expects 80 mln air passenger trips during coming Spring Festival travel rushChina expects 80 mln air passenger trips during coming Spring Festival travel rush.(ECNS) -- China’s civil aviation is predicted to handle 80 million passenger trips during the coming Spring Festival travel rush, with an average of 2 mi... 阅2 转0 评0 公众公开 24-01-10 19:21 |
装饰装修阶段工程创优细部做法交底。 阅1 转自大虫文踪 公众公开 23-11-20 18:55 |
墙面大面积使用石材是在很多领域都会常见的,墙面使用石材时需要注意整体的造型、石材规格及石材的纹路。地面使用石材也同样是比较广泛的,在设计时也同样需要注意到石材的规格、地面造型设计、以及纹路方向。干挂石材节点施工工艺说明:1.石材挂板用双股18#铜丝或钢丝钩与墙面固定,墙面用手提切割机从上而下或45度方向切槽缝,用钢钉插入缝内... 阅1 转自大虫文踪 公众公开 23-11-20 18:54 |
条纹型(平行条纹)条纹型(波浪条纹)西瓜奢品外贸评论冷空气马上来袭,赶紧给自己备一件外套吧,牛角扣有档次很洋气小敏影视电视剪辑评论奔四的女人早秋如何穿?太平洋时尚网评论Elie Saab 2019秋冬高级定制系列小薇情感录四款经典短靴分享,显得腿长而且腿型好青椒小影热点视频。 阅1 转自大虫文踪 公众公开 23-11-20 18:54 |
这份装修标准施工工艺,详细到骨子里。隐蔽工程-给排水工艺。隐蔽工程系列——专用线卡工艺。隐蔽工程系列——冷弯技术。隐蔽工程系列——线头工艺。隐蔽工程系列——防水工艺。隐蔽工程系列——验收标准。常规工程系列——木作家具工艺。常规工程系列——吊顶工艺。常规工程系列——贴砖工艺。常规工程系列——验收标准。 阅1 转自大虫文踪 公众公开 23-11-20 18:53 |
室内装修施工《100个工艺细节做法图》,看看够不够规范? 阅1 转自大虫文踪 公众公开 23-11-20 18:53 |
特别是贴砖面积、墙面漆面积、壁纸面积、地板面积;木门——地板——壁纸——散热器,这是一个被普遍认可的正确安装顺序,先装木门是为了保证地板的踢脚线能和木门的门套紧密接合;(十三)开关插座安装死抗着只有一句提醒:同学们应该对家里各个自然间的开关插座数量、位置等问题有一个详细的了解或者记录,特别是对于贴壁纸的同学,有时候壁... 阅1 转自大虫文踪 公众公开 23-11-20 18:53 |
1前期设计——2主体拆改——3水电改造——4木工——5贴砖——6刷墙面漆——7厨卫吊顶——8橱柜安装——9木门安装——10地板安装——11铺贴壁纸——12散热器安装——13开关插座安装——14灯具安装——15五金洁具安装——16窗帘杆安装——17拓荒保洁——18家具进场——19家电安装——20家居配饰装修。“瓦工老二”离场,这时候可以约橱柜第二次测... 阅1 转自大虫7hlkl... 公众公开 23-11-20 18:52 |
1.2由施工单位编写装修施工组织设计(重点编制工厂化加工、单元门封闭流水作业、质量控制重点及方法、成品保护、安全文明施工等方案),报监理及甲方审定。1.3.5铝合金成品外型目测检查(检查内容:是否有撞伤、变形、破损、砂浆污染等)及成品保护措施验收及更换(设置质量停歇验收点)14.1室内卫生洁具、成品保护、开关基座安装、阳台晾衣杆... 阅1 转自大虫文踪 公众公开 23-11-20 18:51 |