1、常用的钻井英语缩写 2.HWDP heavy weight drill pipe 加重钻杆 3.DC drill collar 钻铤 6.PDM positive displacement motor 螺杆 8.BOP blowout preventer 封井器 9.CSC casing 套管 JNT joint 单根 11.IF internal flush 内平 12.FH full hole 贯眼 13.REG regular 正规 14.IU internal upset 内加厚 15.EU external upset 外加厚 17.OH open hole 裸眼 20.SPM strokes per minute 冲程每分钟 22.MT metric ton 公制吨 24.DST drill stem test 钻具测试 25.KS key seat 键槽 26.STDS stands 立柱 27.VIS viscosity 粘度 28.WL water loss 失水 30.YP yield point 屈服值 31.FL filtrate loss 滤失 33.MD measured depth 测量井深 34.TD total depth 总井深 35.KOP kick off point 造斜点 36.DIR direction 定向 37.AZM azimuth 方位 38.DEV deviation 井斜 40.OD outside-diameter 外径 41.FTG footage 进尺 42.PPG pounds per gallon (密度 )每加仑磅 43.PSI pounds per square inch 每平方英寸磅 44.SGL single 单根 46.AD assistant driller 副司钻 50.CNPC China national petroleum company 中国石油天然气总公司 52.S/N serial number 系列号 53.N/W net weight 净重 54.G/W gross weight 毛重 55.P/U pick up 吊起 56.M/U make up 接上 57.L/D lay down 甩开 58.N/U nipple up 接上 59.N/D nipple down 卸开 60.R/U rig up 安装 62.RIH run in hole 下钻 64.POOH pull out of hole 起钻 65.DR drilling 钻进 67.WOW wait on water 等水 68.TOF top of fish 鱼顶 69.MW mud weight 泥浆密度 71.TOH trip out of hole 起钻 73.KSW key seat wiper 键槽清洁器 75.PS power swivel=(top driver) 顶部驱动(顶驱) 76.YP yield point 屈服点 77.ID inside-diameter 内径 79.BOP blowout preventer 防喷器 80.STB stabilizer稳定器 81.XO cross-over 转换接头 2、钻井屏幕英文 1. Bit Depth 钻头位置 18.PUMP 2 二号泥浆泵 spm 19.Bittim 钻头累计纯钻时间 小时 24.Trip TK 计量罐 立方米 25.SUM 1 泥浆总量 立方米 26.Vol /- 泥浆变化量 立方米 27.MW OUT 泥浆出口比重 千克/升 28.C1 main 甲烷 ppm 29.C2 main 乙烷 ppm 30.C3 main 丙烷 ppm 31.iC4 main 正丁烷 ppm 33.T GAS main 气体全量 ppm 34.H2S Dril 硫化氢钻台 ppm 3、起下钻状态屏幕 1. Bit Depth 钻头位置 5. WOH 悬重(瞬时) 吨 6. WOH 悬重(最大) 吨 7. WOH 悬重(最小) 吨 21.Pit 1 一号泥浆池 立方米 24.Trip TK 计量罐 立方米 25.SUM 1 泥浆总量 立方米 26.Vol /- 泥浆变化量 立方米 27.MW OUT 泥浆出口比重 千克/升 28.C1 main 甲烷 ppm 29.C2 main 乙烷 ppm 30.C3 main 丙烷 ppm 31.iC4 main 正丁烷 ppm 33.T GAS main 气体全量 ppm 34.H2S Dril 硫化氢钻台 ppm
|
|
来自: siempre2dushu > 《 Petroleum》