分享

宜春市MedAccred _AC8121电子电缆和线束组件的审核标准 (48)

 AS质量培训中心 2021-08-03

25.24 C- Is the cleaning method being used and is the maximum time permitted between hand soldering and cleaning being observed, in accordance with procedures?YES/NO

25.25 C- Are all drawings, written instructions, and product specific fixtures under configuration control and do they match the assembly traveler?YES/NO

25.26 C- Are the work instructions, including sequence of operations, being followed?YES/NO

25.27 C- Is there evidence that procedure for control of soldering tools / equipment is being followed for:

25.27.1 C- Selection and setup?YES/NO

25.27.2 C- Maintenance, including soldering iron tip replacement and periodic cleaning?YES/NO

25.27.3 C- Periodic verification, including soldering iron tips for temperature?YES/NO

25.27.4 C- If required, calibration?YES/NO/NA

Audit Note: Some soldering systems may require calibration.

25.28 C- Is there evidence of operator training, in accordance with procedures, IPC/WHMA-A-620, specific customer requirements, ESD protection, technical knowledge, including periodic re-certification?YES/NO

25.29 C- Is the qualified or customer specified solder alloy and flux being used for the part number being soldered?YES/NO

25.30 C- Is the process control to ensure wire(s) are inserted to the full depth of the solder cup being done?YES/NO

Audit Note: It is a defect in IPC/WHMA-A-620 if the wire is not inserted to the full depth of the cup. However, this is not visually inspectable. It is determined through process control. For example, this may be controlled by using strip length.

    本站是提供个人知识管理的网络存储空间,所有内容均由用户发布,不代表本站观点。请注意甄别内容中的联系方式、诱导购买等信息,谨防诈骗。如发现有害或侵权内容,请点击一键举报。
    转藏 分享 献花(0

    0条评论

    发表

    请遵守用户 评论公约

    类似文章