5) Bunkering procedure and precautions for preventing oil spill. 1. The ship and the receiver shall maintain close contact. 2. In the event of an oil spill accident, immediate measures should be taken to start the Oil pollution Emergency Plan, divide the responsibilities according to the responsibilities in the contingency table of marine oil spills, quickly control the spread of oil spills, recover and remove oil spills, and minimize pollution 4 at the end of refueling, do: 4.1 confirm that the oil return pipe has cleaned the residual oil before the oil return pipe can be removed. 4.2 close and seal all valves and blind plates. 4.3 the dirty oil dripping on the deck should be eliminated in a timely manner. 4.4 when the oil collecting tank falls into the dirty oil, the residual hole in the lower part can be opened only after it has been cleaned. 6)Preparation for PSC inspection. The inspection and test before the inspection is particularly important. Therefore, it is very necessary to set aside at least one day before each arrival according to the actual situation of the ship and the port of destination, it is very necessary for the department chief to lead the cadres and crew of the department to carry out detailed inspection and test of all fire fighting, life-saving, emergency and anti-pollution equipment and ship appearance related to port state inspection, and the head of key equipment department should personally inspect and confirm. 7) Main engine piston withdraw procedure. 答: 1. Inform the captain of the application. 2. Pre-work training, assign work, emphasize safety. 3. The main pipe leads the machine head and the mechanic is responsible for the disassembly of the cylinder head accessories, while the second pipe and the third pipe are responsible for the internal disassembly of the crankcase. 4. The pipe is responsible for closing each oil and water valve, releasing water, engage the turning gear, and suspending "No start." No1 oiler preparation tools. 5. After disassembling the accessories, follow the unified command of the main tube when hoisting the piston. 6. Clean, measure and replace parts according to the instructions. 7. Before installing each part, it must be inspected by the main pipe and then restored according to the instructions. |
|